Foreword
Preface
1 General data
1.l Recommended method of mounting
1.2 Minimum and maximum number of contacts
1.3 Ratings and characteristics
1.4 Related documents
1.5 Marking
1.6 Ordering Information
2 Characteristics
2.1 Climatic category
2.2 Electrical
2.3 Mechanical
3 Dimensional information
3.1 Drawings and dimensions
4 Test schedule
4.1 General
4.2 Test schedule tables
5 Quality assessment procedures
5.1 Qualification approval testing
5.2 Quality conformance inspection
5.3 Delayed delivery, re-inspection
ANNEX A (normative): Test phase BP3.2: Corrosion,
industrial atmosphere