I.S. EN 12953-4:2002
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
SHELL BOILERS - PART 4: WORKMANSHIP AND CONSTRUCTION OF PRESSURE PARTS OF THE BOILER
Hardcopy , PDF
09-11-2021
English
01-01-2002
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
Dates of withdrawal of national standards are available from NSAI.
National foreword
European foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols
5 General requirements
Annex A (normative) - Typical welds for shell boilers
Annex B (informative) - Gaskets for closing systems of
access and inspection openings
Annex C (informative) - Significant technical changes
between this European Standard and the
previous edition
Annex ZA (informative) - Relationship between this
European Standard and the Essential
Requirements of EU Directive 2014/68/EU
aimed to be covered
Bibliography
Provides requirements for the workmanship and construction of shell boilers as defined in EN 12953-1.
DocumentType |
Standard
|
Pages |
46
|
PublisherName |
National Standards Authority of Ireland
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
UNI EN 12953-4 : 2005 | Identical |
NF EN 12953-4 : 2002 | Identical |
SN EN 12953-4 : 2002 | Identical |
UNE-EN 12953-4:2003 | Identical |
BS EN 12953-4:2002 | Identical |
NBN EN 12953-4 : 2002 | Identical |
DIN EN 12953-4:2002-08 | Identical |
ONORM EN 12953-4 : 2018 | Identical |
NEN EN 12953-4 : 2018 | Identical |
NS EN 12953-4 : 2018 | Identical |
EN 12953-4:2018 | Identical |
EN 12953-5:2002 | Shell boilers - Part 5: Inspection during construction, documentation and marking of pressure parts of the boiler |
EN ISO 3834-3:2005 | Quality requirements for fusion welding of metallic materials - Part 3: Standard quality requirements (ISO 3834-3:2005) |
ISO 2553:2013 | Welding and allied processes Symbolic representation on drawings Welded joints |
EN ISO 3834-2:2005 | Quality requirements for fusion welding of metallic materials - Part 2: Comprehensive quality requirements (ISO 3834-2:2005) |
ISO 9712:2012 | Non-destructive testing Qualification and certification of NDT personnel |
EN 1759-1:2004 | Flanges and their joint - Circular flanges for pipes, valves, fittings and accessories, Class designated - Part 1: Steel flanges, NPS 1/2 to 24 |
ISO 14732:2013 | Welding personnel Qualification testing of welding operators and weld setters for mechanized and automatic welding of metallic materials |
ISO 14731:2006 | Welding coordination Tasks and responsibilities |
ISO 9606-1:2012 | Qualification testing of welders — Fusion welding — Part 1: Steels |
EN 10216-2:2013 | Seamless steel tubes for pressure purposes - Technical delivery conditions - Part 2: Non-alloy and alloy steel tubes with specified elevated temperature properties |
EN ISO 14732:2013 | Welding personnel - Qualification testing of welding operators and weld setters for mechanized and automatic welding of metallic materials (ISO 14732:2013) |
EN ISO 9712:2012 | Non-destructive testing - Qualification and certification of NDT personnel (ISO 9712:2012) |
EN 12953-1:2012 | Shell boilers - Part 1: General |
ISO 15614-1:2017 | Specification and qualification of welding procedures for metallic materials — Welding procedure test — Part 1: Arc and gas welding of steels and arc welding of nickel and nickel alloys |
ISO 15609-1:2004 | Specification and qualification of welding procedures for metallic materials Welding procedure specification Part 1: Arc welding |
EN 12953-3:2016 | Shell boilers - Part 3: Design and calculation for pressure parts |
ISO 3834-2:2005 | Quality requirements for fusion welding of metallic materials Part 2: Comprehensive quality requirements |
EN 12953-2:2012 | Shell boilers - Part 2: Materials for pressure parts of boilers and accessories |
EN ISO 2553:2013 | Welding and allied processes - Symbolic representation on drawings - Welded joints (ISO 2553:2013) |
EN 1515-4:2009 | Flanges and their joints - Bolting - Part 4: Selection of bolting for equipment subject to the Pressure Equipment Directive 97/23/EC |
EN ISO 14731:2006 | Welding coordination - Tasks and responsibilities (ISO 14731:2006) |
EN ISO 15609-1:2004 | Specification and qualification of welding procedures for metallic materials - Welding procedure specification - Part 1: Arc welding (ISO 15609-1:2004) |
EN ISO 9606-1:2017 | Qualification testing of welders - Fusion welding - Part 1: Steels (ISO 9606-1:2012 including Cor 1:2012 and Cor 2:2013) |
EN 1092-2:1997 | Flanges and their joints - Circular flanges for pipes, valves, fittings and accessories, PN designated - Part 2: Cast iron flanges |
ISO 3834-3:2005 | Quality requirements for fusion welding of metallic materials Part 3: Standard quality requirements |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.