• Shopping Cart
    There are no items in your cart

IEC 61954:2011+AMD1:2013+AMD2:2017 CSV

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Static var compensators (SVC) - Testing of thyristor valves

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Superseded date

04-10-2021

Language(s)

English - French

Published date

12-04-2017

€400.27
Excluding VAT

IEC 61954:2011+A1:2013+A2:2017 defines type, production and optional tests on thyristor valves used in thyristor controlled reactors (TCR), thyristor switched reactors (TSR) and thyristor switched capacitors (TSC) forming part of static VAR compensators (SVC) for power system applications. The requirements of the standard apply both to single valve units (one phase) and to multiple valve units (several phases). This edition includes the following significant technical changes with respect to the previous edition:
a) Definitions of terms "thyristor level", "valve section", "valve base electronics" and "redundant thyristor levels" have been changed for clarification;
b) Conditions of testing thyristor valve sections instead of a complete thyristor valve have been defined;
c) The requirement has been added that if, following a type test, one thyristor level has become short-circuited, then the failed level shall be restored and this type test repeated;
d) The time period of increasing the initial test voltage from 50 % to 100 % during type a.c. dielectric tests on TSC, TCR or TSR valves has been set equal to approximately 10 s;
e) The duration of test voltage Uts2 during type a.c.-d.c. dielectric tests between TSC valve terminals and earth as well as the duration of test voltage Utvv2 during dielectric tests between TSC valves (for MVU only) has been changed from 30 min to 3 h;
f) The reference on the number of pulses per minute of the periodic partial discharge recorded during a.c.-d.c. dielectric tests on TSC valves and exceeding the permissible level has been deleted. This consolidated version consists of the second edition (2011), its amendment 1 (2013) and its amendment 2 (2017). Therefore, no need to order amendment in addition to this publication.

Committee
TC 22/SC 22F
DevelopmentNote
Stability Date: 2022. (04/2017)
DocumentType
Standard
Pages
182
PublisherName
International Electrotechnical Committee
Status
Superseded
SupersededBy
Supersedes

15/30300414 DC : 0 BS EN 62927 - VOLTAGE SOURCED CONVERTER (VSC) VALVES FOR STATIC SYNCHRONOUS COMPENSATOR (STATCOM) - ELECTRICAL TESTING
BS EN 62927:2017 Voltage sourced converter (VSC) valves for static synchronous compensator (STATCOM). Electrical Testing
I.S. EN 60143-4:2010 SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS
NF EN 60143-4 : 2011 SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS
BS EN 60143-4:2010 Series capacitors for power systems Thyristors controlled series capacitors
13/30269681 DC : 0 BS EN 62823 - THYRISTOR VALVES FOR THYRISTOR CONTROLLED SERIES CAPACITORS (TCSC) - ELECTRICAL TESTING
IEEE 1031-2011 IEEE Guide for the Functional Specification of Transmission Static Var Compensators
CEI EN 60143-4 : 2012 SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS
I.S. EN 60146-1-1:2010 SEMICONDUCTOR CONVERTERS - GENERAL REQUIREMENTS AND LINE COMMUTATED CONVERTERS - PART 1-1: SPECIFICATION OF BASIC REQUIREMENTS
EN 62823:2015 Thyristor valves for thyristor controlled series capacitors (TCSC) - Electrical testing
IEC 60143-4:2010 Series capacitors for power systems - Part 4: Thyristor controlled series capacitors
EN 62927:2017/AC:2018-01 VOLTAGE SOURCED CONVERTER (VSC) VALVES FOR STATIC SYNCHRONOUS COMPENSATOR (STATCOM) - ELECTRICAL TESTING (IEC 62927:2017/COR1:2017)
I.S. EN 62823:2015 THYRISTOR VALVES FOR THYRISTOR CONTROLLED SERIES CAPACITORS (TCSC) - ELECTRICAL TESTING
I.S. EN 62927:2017 VOLTAGE SOURCED CONVERTER (VSC) VALVES FOR STATIC SYNCHRONOUS COMPENSATOR (STATCOM) - ELECTRICAL TESTING
CEI EN 60146-1-1 : 2013 SEMICONDUCTOR CONVERTERS - GENERAL REQUIREMENTS AND LINE COMMUTATED CONVERTERS - PART 1-1: SPECIFICATION OF BASIC REQUIREMENTS
IEC 60146-1-1:2009 Semiconductor converters - General requirements and line commutated converters - Part 1-1: Specification of basic requirements
BS EN 62823:2015 Thyristor valves for thyristor controlled series capacitors (TCSC). Electrical testing
08/30179134 DC : DRAFT MAR 2008 BS EN 60143-4 - SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS
06/30156472 DC : DRAFT SEP 2006 BS EN 60146-1-1 - SEMICONDUCTOR CONVERTERS - GENERAL REQUIREMENTS AND LINE COMMUTATED CONVERTERS - PART 1-1: SPECIFICATION OF BASIC REQUIREMENTS
BS EN 60146-1-1:2010 Semiconductor converters. General requirements and line commutated converters Specification of basic requirements
IEEE 1303-2011 IEEE Guide for Static Var Compensator Field Tests
EN 60146-1-1:2010 Semiconductor converters - General requirements and line commutated converters - Part 1-1: Specification of basic requirements
EN 60143-4 : 2010 SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS

IEC 60060-2:2010 High-voltage test techniques - Part 2: Measuring systems
IEC 60270:2000+AMD1:2015 CSV High-voltage test techniques - Partial discharge measurements
IEC 60700-1:2015 Thyristor valves for high voltage direct current (HVDC) power transmission - Part 1: Electrical testing
IEC 60060-1:2010 High-voltage test techniques - Part 1: General definitions and test requirements
IEC 60071-1:2006+AMD1:2010 CSV Insulation co-ordination - Part 1: Definitions, principles and rules

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.