IEC TS 61400-26-3:2016
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
Wind energy generation systems - Part 26-3: Availability for wind power stations
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
31-12-2021
English
09-08-2016
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Information model for WPS
5 INFORMATION AVAILABLE (WPS)
6 INFORMATION UNAVAILABLE (WPS)
Annex A (informative) - Entry and Exit condition overview
Annex B (informative) - Application scenarios - examples
Annex C (informative) - Balance of plant integration
Annex D (informative) - Determination of potential production
for a WPS - examples
Annex E (informative) - Service availability indicators - examples
Annex F (informative) - Examples of optional level 5 categories
Bibliography
IEC TS 61400-26-3:2016(E) provides a framework from which time-based and production-based availability indicators of a wind power station can be derived. It unambiguously describes how data is categorised and provides examples of how the data can be used to derive availability indicators. The approach is to apply the terms and definitions for the applied information models introduced in IEC TS 61400-26-1 and IEC TS 61400-26-2 to a wind power station.
DevelopmentNote |
Stability Date: 2017. (08/2016)
|
DocumentType |
Technical Specification
|
Pages |
118
|
PublisherName |
International Electrotechnical Committee
|
Status |
Superseded
|
Standards | Relationship |
NEN NVN CLC IEC/TS 61400-26-3 : 2017 | Identical |
DIN IEC/TS 61400-26-3 : 2017 | Identical |
VDE V 0127-26-3 : 2017 | Identical |
CEI CLC/TS 61400-26-3 : 2018 | Identical |
PD IEC/TS 61400-26-3:2016 | Identical |
CLC/TS 61400-26-3:2017 | Identical |
NEN NVN IEC/TS 61400-26-3 : 2016 | Identical |
PD CLC/TS 61400-26-3:2017 | Identical |
PNE-CLC/FprTS 61400-26-3:2017 | Identical |
IEC 60050-415:1999 | International Electrotechnical Vocabulary (IEV) - Part 415: Wind turbine generator systems |
IEC 61400-12-1:2017 | Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines |
IEEE 762-2006 | IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity |
IEC TS 61400-26-2:2014 | Wind turbines - Part 26-2: Production-based availability for wind turbines |
ISO 3977-9:1999 | Gas turbines — Procurement — Part 9: Reliability, availability, maintainability and safety |
IEC TS 61400-26-1:2011 | Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems |
IEC 61400-25-4:2016 | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
IEC 61400-25-1:2017 | Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models |
IEC 61400-25-6:2016 | Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring |
IEC 61400-25-3:2015 | Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models |
IEC 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
IEC 61400-1:2005+AMD1:2010 CSV | Wind turbines - Part 1: Design requirements |
IEC 61400-25-5:2017 | Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.