IEEE 1815.1-2015
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
IEEE Standard for Exchanging Information Between Networks Implementing IEC 61850 and IEEE Std 1815(TM) [Distributed Network Protocol (DNP3)]
Hardcopy , PDF
English
16-12-2016
26-03-2026
1. Overview
2. Normative references
4. Conceptual architecture
5. Use cases for configuring the gateway
6. Mapping of a device-oriented information
model to DNP3
7. Mapping of data structure
8. Mapping of abstract communications service
interface (IEC 61850-7-2:2010)
9. Describing the DNP3/IEC 61850 mapping using
XML
10. Security Requirements
Annex A (normative) - Leaf level mapping rules and
conformance table
Annex B (informative) - Recommended implementation
levels
Annex C (informative) - Recommended mapping of IINs
to IEC 61850-7-4 ed2.0 [B3]
Annex D (informative) - Time synchronization security
Annex E (informative) - Example XML files
Annex F (informative) - Mapping to NISTIR 7628 [B9]
Annex G (informative) - Bibliography
Defines the standard approach for mapping between IEEE Std 1815 [TM], IEEE Standard for Electric Power Systems Communications - Distributed Network Protocol (DNP3) and IEC 61850, Communication networks and systems for power utility automation.
| Committee |
Power System Communications and Cybersecurity
|
| DocumentType |
Standard
|
| ISBN |
978-1-5044-0598-0
|
| Pages |
368
|
| PublisherName |
Institute of Electrical & Electronics Engineers
|
| Status |
Withdrawn
|
| EN 61400-25-4:2017 | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
| CEI EN 61400-25-4 : 2009 | WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
| I.S. EN 61400-25-4:2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
| IEEE 2030.100-2017 | IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control System |
| IEC 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
| IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
| IEC TS 62351-3:2007 | Power systems management and associated information exchange - Data and communications security - Part 3: Communication network and system security - Profiles including TCP/IP |
| IEC TS 62351-6:2007 | Power systems management and associated information exchange - Data and communications security - Part 6: Security for IEC 61850 |
| IEC TS 62351-4:2007 | Power systems management and associated information exchange - Data and communications security - Part 4: Profiles including MMS |
| IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
| ISO/IEC 8802-3:2000 | Information technology — Telecommunications and information exchange between systems — Local and metropolitan area networks — Specific requirements — Part 3: Carrier sense multiple access with collision detection (CSMA/CD) access method and physical layer specifications |
| IEEE 1686-2007 | IEEE Standard for Substation Intelligent Electronic Devices (IEDs) Cyber Security Capabilities |
| IEC TS 62351-5:2013 | Power systems management and associated information exchange - Data and communications security - Part 5: Security for IEC 60870-5 and derivatives |
| IEEE C37.238-2011 | IEEE Standard Profile for Use of IEEE 1588 Precision Time Protocol in Power System Applications |
| IEC TR 61850-90-5:2012 | Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118 |
| IEC 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
| IEC 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
| IEEE 1686-2013 | IEEE Standard for Intelligent Electronic Devices Cyber Security Capabilities |
| IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
| IEC 61850-7-3:2010 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
| IEEE 1815-2012 REDLINE | IEEE Standard for Electric Power Systems Communications-Distributed Network Protocol (DNP3) |
| IEC TS 62351-8:2011 | Power systems management and associated information exchange - Data and communications security - Part 8: Role-based access control |