CEI 14-43 : 2011
|
GUIDE FOR THE APPLICATION, SPECIFICATION, AND TESTING OF PHASE-SHIFTING TRANSFORMERS |
IEEE DRAFT C57.19.01 : D7 MAY 99
|
DRAFT STANDARD PERFORMANCE CHARACTERISTICS AND DIMENSIONS FOR OUTDOOR POWER APPARATUS BUSHINGS |
CSA C88.1 : 1996 : R2015
|
POWER TRANSFORMERS AND REACTOR BUSHINGS |
IEEE C57.32 : 2015
|
REQUIREMENTS, TERMINOLOGY, AND TEST PROCEDURES FOR NEUTRAL GROUNDING DEVICES |
IEEE C57.154-2012
|
DESIGN, TESTING, AND APPLICATION OF LIQUID-IMMERSED DISTRIBUTION, POWER, AND REGULATING TRANSFORMERS USING HIGH-TEMPERATURE INSULATION SYSTEMS AND OPERATING AT ELEVATED TEMPERATURES |
IEEE PC57.19.00/D4:2022
|
IEEE Draft Standard General Requirements and Test Procedure for Power Apparatus Bushings |
IEEE C57.19.01-2000
|
STANDARD PERFORMANCE CHARACTERISTICS AND DIMENSIONS FOR OUTDOOR APPARATUS BUSHINGS |
IEEE C57.19.00 : 2004
|
GENERAL REQUIREMENTS AND TEST PROCEDURE FOR POWER APPARATUS BUSHINGS |
CSA C88.1 : 1996 : R2005
|
POWER TRANSFORMERS AND REACTOR BUSHINGS |
IEEE C57.13.5-2009 REDLINE
|
IEEE Standard of Performance and Test Requirements for Instrument Transformers of a Nominal System Voltage of 115 kV and Above |
IEEE DRAFT C57.135 : D12 AUG 2000
|
DRAFT GUIDE FOR THE APPLICATION, SPECIFICATION AND TESTING OF PHASE-SHIFTING TRANSFORMERS |
IEEE C57.12.36-2007
|
REQUIREMENTS FOR LIQUID-IMMERSED DISTRIBUTION SUBSTATION TRANSFORMERS |
IEC 62032:2012
|
Guide for the Application, Specification and Testing of Phase-Shifting Transformers |
IEEE C57.91:2011
|
GUIDE FOR LOADING MINERAL-OIL-IMMERSED TRANSFORMERS AND STEP-VOLTAGE REGULATORS |
IEEE 62-1995
|
IEEE Guide for Diagnostic Field Testing of Electric Power Apparatus - Part 1: Oil Filled Power Transformers, Regulators, and Reactors |
IEEE C57.19.04 : 2018
|
PERFORMANCE CHARACTERISTICS AND DIMENSIONS FOR HIGH CURRENT POWER TRANSFORMER BUSHINGS WITH RATED CONTINUOUS CURRENT IN EXCESS OF 5000 A IN BUS ENCLOSURES |
IEEE C57.12.00-2015
|
STANDARD FOR GENERAL REQUIREMENTS FOR LIQUID-IMMERSED DISTRIBUTION, POWER, AND REGULATING TRANSFORMERS |
CSA C88.1 : 1996 : R2011
|
POWER TRANSFORMERS AND REACTOR BUSHINGS |
IEEE C57.152 : 2013
|
GUIDE FOR DIAGNOSTIC FIELD TESTING OF FLUID-FILLED POWER TRANSFORMERS, REGULATORS, AND REACTORS |
IEEE C57.135 : 2011
|
GUIDE FOR THE APPLICATION, SPECIFICATION, AND TESTING OF PHASE-SHIFTING TRANSFORMERS |
IEEE C57.19.0:2005
|
STANDARD REQUIREMENTS, TERMINOLOGY, AND TEST CODE FOR BUSHINGS FOR DC APPLICATIONS |