• IEEE DRAFT 125 : D8.5 2006

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    PREPARATION OF EQUIPMENT SPECIFICATIONS FOR SPEED-GOVERNING OF HYDRAULIC TURBINES INTENDED TO DRIVE ELECTRIC GENERATORS

    Available format(s): 

    Superseded date:  26-10-2007

    Language(s): 

    Published date:  12-01-2013

    Publisher:  Institute of Electrical & Electronics Engineers

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    1 Overview
      1.1 Scope
      1.2 Purpose
      1.3 Disclaimer
      1.4 Use of IEEE Std 125
    2 Normative references
    3 Definitions
    4 Functions and characteristics
      4.1 Control actuator position
      4.2 Control actuator stroke
      4.3 Control actuator time
    5 Equipment specifications
      5.1 General specifications
      5.2 Governor and auxiliary functions
      5.3 Other optional functions
      5.4 Hydraulic pressure supply system
      5.5 New installation considerations
      5.6 Replacement and conversion considerations
      5.7 Redundancy
      5.8 Failsafe features
      5.9 Dual-regulated turbines
      5.10 Additional governor controller functions
      5.11 Environmental specifications
      5.12 Software
      5.13 Interface to other plant systems
      5.14 Operator Interface
      5.15 Personnel safety features
      5.16 Spare parts and accessories
      5.17 Service Life
    6 Performance specification
      6.1 Stability
      6.2 Permanent speed droop
      6.3 Deadband
      6.4 Deadtime
      6.5 Governor damping adjustments
    7 Information provided by the manufacturer
      7.1 Information to be provided at the time of submission
           of proposals
      7.2 Information to be provided after contract award
      7.3 Test procedures
      7.4 Rehabilitation and conversion considerations
    8 Governor testing
      8.1 Factory acceptance testing
      8.2 On-site acceptance testing
    9 Information provided by the specifier
    Annex A (informative) Bibliography
    Annex B (informative) Glossary
    Annex C (normative) Mode control logic
          C.1 Droop mode control logic
          C.2 Governor mode control logic
    Annex D (normative) Tables

    Abstract - (Show below) - (Hide below)

    Prescribes performance characteristics and equipment for electric-hydraulic governors for all types of hydraulic turbines intended to drive electric generators of all sizes.

    General Product Information - (Show below) - (Hide below)

    Comment Closes On
    Document Type Draft
    Publisher Institute of Electrical & Electronics Engineers
    Status Superseded

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 60255-22-1:2007 Measuring relays and protection equipment - Part 22-1: Electrical disturbance tests - 1 MHz burst immunity tests
    IEC 60545:1976 Guide for commissioning, operation and maintenance of hydraulic turbines
    IEEE 1248-1998 IEEE Guide for the Commissioning of Electrical Systems in Hydroelectric Power Plants
    IEC 61116:1992 Electromechanical equipment guide for small hydroelectric installations
    IEC 60308:2005 Hydraulic turbines - Testing of control systems
    IEC 60255-22-5:2008 Measuring relays and protection equipment - Part 22-5: Electrical disturbance tests - Surge immunity test
    IEC 60041:1991 Field acceptance tests to determine the hydraulic performance of hydraulic turbines, storage pumps and pump-turbines
    IEEE 1207-2011 IEEE Guide for the Application of Turbine Governing Systems for Hydroelectric Generating Units
    IEEE C37.90.2:2004 WITHSTAND CAPABILITY OF RELAY SYSTEMS TO RADIATED ELECTROMAGNETIC INTERFERENCE FROM TRANSCEIVERS
    IEEE C37.90.1-2012 IEEE Standard for Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus
    IEEE/IEC 1249-2013 IEC/IEEE Guide for Computer-based Control for Hydroelectric Power Plant Automation
    IEC 61362:2012 Guide to specification of hydraulic turbine governing systems
    IEEE 1147-2005 IEEE Guide for the Rehabilitation of Hydroelectric Power Plants
    IEC 60255-22-4:2008 Measuring relays and protection equipment - Part 22-4: Electrical disturbance tests - Electrical fast transient/burst immunity test
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective