ISO 17666:2003
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
View Superseded by
Space systems Risk management
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
27-02-2019
English, French
31-03-2003
ISO 17666:2003 extends the requirements of ISO 14300-1, the principles and requirements for integrated risk management on a space project. It explains what is needed to implement a project-integrated risk management policy by any project actor, at any level (i.e. customer, first-level supplier, or lower-level suppliers).
ISO 17666:2003 contains a summary of the general risk management process, which is subdivided into four (4) basic steps and nine (9) tasks. The implementation can be tailored to project-specific conditions.
The risk management process requires information exchange among all project domains and provides visibility over risks, with a ranking according to their criticality for the project. These risks are monitored and controlled according to the rules defined for the domains to which they belong.
ISO 17666:2003 is applicable to all space project phases, as defined in ISO 14300-1.
When viewed from the perspective of a specific programme or project context, the requirements defined in ISO 17666:2003 should be tailored to match the genuine requirements of a particular profile and circumstances of a programme or project.
DocumentType |
Standard
|
Pages |
19
|
PublisherName |
International Organization for Standardization
|
Status |
Withdrawn
|
SupersededBy |
Standards | Relationship |
UNE-EN ISO 17666:2003 | Identical |
BS EN ISO 17666:2003 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.