• Shopping Cart
    There are no items in your cart

NBN EN 60420 : 1995

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

SCHAKELAAR-SMELTVEILIGHEIDCOMBINATIES VOOR HOOGSPANNING

Superseded date

01-06-2005

Published date

12-01-2013

Sorry this product is not available in your region.

Committees responsible
National foreword
Specification
1 General
2 Normal and special service conditions
3 Definitions
4 Rating
5 Design and construction
6 Type tests
7 Routine tests
8 Application guide for the selection of switch-fuse
      combinations for service
9 Information to be given with enquiries, tenders
      and orders
10 Rules for transport, storage, erection and
      maintenance
Appendices
A Example of the co-ordination of fuses, switch and
      transformer
B Justification of the procedure for determining
      transfer current and of the parameters associated
      with test duty 4
Tables
I Standard values of rated TRV (Based on practice in
      Europe)
IA Standard values of rated TRV (Based on practice in
      the United States of America and Canada)
II Nameplate markings
III Standard values of prospective TRV for test duty 2
      (Based on practice in Europe)
IIIA Standard values of prospective TRV for test duty 2
      (Based on practice in the United States of America
      and Canada)
IV Standard values of prospective TRV for test duty 4
      (Based on practice in Europe)
IVA Standard values of prospective TRV for test duty 4
      (Based on practice in the United States of America
      and Canada)
V Summary of test parameters for test duties 1 to 5
Annex
ZA Other International publications quoted in this
      standard with the references of the relevant
      European publications
Figures
1 Representation of a specified TRV by a two-
      parameter reference line and a delay line
2 Example of a two-parameter reference line for a
      TRV
3 Arrangement of test circuits for test duties 1 and
      2
4 Arrangement of test circuits for test duty 3
5 Arrangement of test circuits for test duties 4 and
      5
6 Determination of power-frequency recovery voltage
7 Practical determination of transfer current
8 Probable maximum and minimum time-current
      characteristics of fuse
9 Transfer current in relation to the primary fault
      current Isc due to a solid short in the
      transformer secondary terminal
10 Characteristics relating to the protection of an
      11 kV - 400 kVA transformer
11 Discrimination between HV and LV fuses
12 Characteristics for determining take-over current

Applies to three-pole units for public and industrial distribution systems assemblies of switches and current-limiting fuses which interrupt, any load current up to the rated breaking current of the switch and any over-current up to the rated short-circuit breaking current of the combination by which automatic interruption is initiated. Does not apply to fuse-circuit-breakers, fuse-contactors, combinations for motor-circuits or to combinations incorporating single capacitor bank switches. Covers normal and special service conditions, definitions, design and construction, type tests, routine tests, application guide for the selection of switch-fuse combinations for service and information to be given with enquiries, tenders and orders.

DocumentType
Standard
PublisherName
Belgian Standards
Status
Superseded

Standards Relationship
DIN EN 60420 : 1994 Identical
BS EN 60420:1993 Identical
I.S. EN 60420:1994 Identical
UNE-EN 60420:1997 Identical
EN 60420:1993 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.