S.R. CLC/TS 61400-26-3:2017
Current
The latest, up-to-date edition.
WIND ENERGY GENERATION SYSTEMS - PART 26-3: AVAILABILITY FOR WIND POWER STATIONS
Hardcopy , PDF
English
01-01-2017
National Foreword
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Information model for WPS
5 INFORMATION AVAILABLE (WPS)
6 INFORMATION UNAVAILABLE (WPS)
Annex A (informative) - Entry and Exit condition overview
Annex B (informative) - Application scenarios - examples
Annex C (informative) - Balance of plant integration
Annex D (informative) - Determination of potential production
for a WPS - examples
Annex E (informative) - Service availability indicators - examples
Annex F (informative) - Examples of optional level 5 categories
Bibliography
Annex ZA (normative) - Normative references to
international publications with their
corresponding European publications
Defines a framework from which time-based and production-based availability indicators of a wind power station can be derived.
DevelopmentNote |
For CENELEC adoptions of IEC publications, please check www.iec.ch to be sure that you have any corrigenda that may apply. (09/2017)
|
DocumentType |
Standard
|
Pages |
132
|
PublisherName |
National Standards Authority of Ireland
|
Status |
Current
|
SupersededBy |
Standards | Relationship |
CLC/TS 61400-26-3:2017 | Identical |
IEC 60050-415:1999 | International Electrotechnical Vocabulary (IEV) - Part 415: Wind turbine generator systems |
CLC/TS 61400-26-2:2017 | Wind turbines - Part 26-2: Production-based availability for wind turbines |
IEC 61400-12-1:2017 | Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines |
IEEE 762-2006 | IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity |
IEC TS 61400-26-2:2014 | Wind turbines - Part 26-2: Production-based availability for wind turbines |
ISO 3977-9:1999 | Gas turbines — Procurement — Part 9: Reliability, availability, maintainability and safety |
IEC TS 61400-26-1:2011 | Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems |
IEC 61400-25-4:2016 | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
IEC 61400-25-1:2017 | Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models |
IEC 61400-25-6:2016 | Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring |
CLC/TS 61400-26-1:2017 | Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems |
IEC 61400-25-3:2015 | Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models |
IEC 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
IEC 61400-1:2005+AMD1:2010 CSV | Wind turbines - Part 1: Design requirements |
IEC 61400-25-5:2017 | Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.