• Shopping Cart
    There are no items in your cart

SAE AIR 1168/8 : 2011

Current

Current

The latest, up-to-date edition.

AIRCRAFT FUEL WEIGHT PENALTY DUE TO AIR CONDITIONING

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

25-07-2011

€123.83
Excluding VAT

1 INTRODUCTION
  1.1 Scope
  1.2 Nomenclature
  1.3 Common Abbreviations
2 THE TOTAL SYSTEM TAKE-OFF WEIGHT METHOD
  2.1 Fixed Weight Penalty
  2.2 Variable Weight (Expendable Material) Penalty
  2.3 Ram Air Penalty
  2.4 Bleed Air Penalty
  2.5 Shaft Horsepower Extraction Penalty
3 SAMPLE CALCULATION: Take-Off Weight Method
  3.1 System Operating Data
  3.2 Fixed Weight Penalty
  3.4 Ram Air Penalty
  3.5 Bleed Air Penalty
  3.6 Shaft Horsepower Extraction Penalty
  3.7 Total System Penalty (Cruise Segment)
4 REFERENCES

The purpose of this section is to provide methods and a set of convenient working charts to estimate penalty values in terms of take-off fuel weight for any given airplane mission.

Committee
AC 9
DocumentType
Standard
Pages
20
ProductNote
THIS STANDARD IS NOW STABILIZED
PublisherName
SAE International
Status
Current

SAE AIR 6464 : 2013 EUROCAE/SAE WG80/AE-7AFC HYDROGEN FUEL CELLS AIRCRAFT FUEL CELL SAFETY GUIDELINES
SAE AS 6858 : 2017 INSTALLATION OF FUEL CELL SYSTEMS IN LARGE CIVIL AIRCRAFT
SAE AIR 1957 : 2015 HEAT SINKS FOR AIRBORNE VEHICLES
ASHRAE HDBK REFRIGERATION : 2014 ASHRAE HANDBOOK - REFRIGERATION
SAE ARP85F AIR CONDITIONING SYSTEMS FOR SUBSONIC AIRPLANES

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.