SAE AIR 1168/8 : 2011
Current
The latest, up-to-date edition.
AIRCRAFT FUEL WEIGHT PENALTY DUE TO AIR CONDITIONING
Hardcopy , PDF
English
25-07-2011
1 INTRODUCTION
1.1 Scope
1.2 Nomenclature
1.3 Common Abbreviations
2 THE TOTAL SYSTEM TAKE-OFF WEIGHT METHOD
2.1 Fixed Weight Penalty
2.2 Variable Weight (Expendable Material) Penalty
2.3 Ram Air Penalty
2.4 Bleed Air Penalty
2.5 Shaft Horsepower Extraction Penalty
3 SAMPLE CALCULATION: Take-Off Weight Method
3.1 System Operating Data
3.2 Fixed Weight Penalty
3.4 Ram Air Penalty
3.5 Bleed Air Penalty
3.6 Shaft Horsepower Extraction Penalty
3.7 Total System Penalty (Cruise Segment)
4 REFERENCES
The purpose of this section is to provide methods and a set of convenient working charts to estimate penalty values in terms of take-off fuel weight for any given airplane mission.
Committee |
AC 9
|
DocumentType |
Standard
|
Pages |
20
|
ProductNote |
THIS STANDARD IS NOW STABILIZED
|
PublisherName |
SAE International
|
Status |
Current
|
SAE AIR 6464 : 2013 | EUROCAE/SAE WG80/AE-7AFC HYDROGEN FUEL CELLS AIRCRAFT FUEL CELL SAFETY GUIDELINES |
SAE AS 6858 : 2017 | INSTALLATION OF FUEL CELL SYSTEMS IN LARGE CIVIL AIRCRAFT |
SAE AIR 1957 : 2015 | HEAT SINKS FOR AIRBORNE VEHICLES |
ASHRAE HDBK REFRIGERATION : 2014 | ASHRAE HANDBOOK - REFRIGERATION |
SAE ARP85F | AIR CONDITIONING SYSTEMS FOR SUBSONIC AIRPLANES |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.