• Shopping Cart
    There are no items in your cart

SN EN 14419 : 2009

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by

DISTRICT HEATING PIPES - PREINSULATED BONDED PIPE SYSTEMS FOR DIRECTLY BURIED HOT WATER NETWORKS - SURVEILLANCE SYSTEMS

Withdrawn date

01-06-2020

Superseded by

SN EN 14419:2020

Published date

12-01-2013

Sorry this product is not available in your region.

Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Basic functional requirements
  4.1 Dependency of Manufacturer of pipe elements
  4.2 Performance
5 Manufacture of measuring elements
  5.1 General requirements
  5.2 Installation, assembly and operation
  5.3 Characteristics
  5.4 Reliability
  5.5 Maintenance
  5.6 Longitudinal tightness
  5.7 Marking of measuring elements
  5.8 Technical documentation
6 Manufacture of pipe elements with measuring elements
  6.1 General requirements
  6.2 Compatibility test
  6.3 Installation of measuring elements
  6.4 After pipe element manufacturing
  6.5 Measuring wires at free ends
  6.6 Tests
  6.7 QM-programme
  6.8 Technical documentation
7 Assembly of measuring elements in field
  7.1 Check upon receipt of pipe elements
  7.2 Extension of an existing measuring section
  7.3 Wiring design diagram
  7.4 Assembly work in joints
  7.5 Assembly check
  7.6 Test after finishing a measuring section
  7.7 Test and measurement during system operation
  7.8 QM-programme
  7.9 Technical documentation
Annex A (informative) Principal function
Annex B (informative) Principal parts of a measuring section
Annex C (normative) Technical documentation
Annex D (normative) Loop test by pipe Manufacturer
        D.1 General
        D.2 Conductor continuity test with an optical or
            acoustic signal
        D.3 Measuring ohmic resistance
Annex E (normative) High voltage test by pipe Manufacturer
Annex F (informative) QM-programme
        F.1 General
        F.2 QM-programme for Manufacturer of pipe elements
            with measuring wires
        F.3 QM-programme for Contractor assembling the
            measuring elements in field
Annex G (normative) Loop test in field
Annex H (normative) Measuring of the electrical insulation
        resistance in field
Bibliography

Describes basic functional requirements for surveillance systems for district heating pipe systems, specific requirements for measuring elements and their installation within preinsulated bonded pipes, valves and fittings, and the field assembly of these measuring elements in pipe joints.

DocumentType
Standard
PublisherName
Swiss Standards
Status
Withdrawn
SupersededBy

Standards Relationship
NF EN 14419 : 2009 Identical
BS EN 14419:2009 Identical
NBN EN 14419 : 2009 Identical
DIN EN 14419:2009-07 Identical
UNI EN 14419 : 2009 Identical
NEN EN 14419 : 2009 Identical
I.S. EN 14419:2009 Identical
NS EN 14419 : 2009 Identical
ONORM EN 14419 : 2009 Identical
EN 14419:2009 Identical
UNE-EN 14419:2009 Identical
DIN EN 14419:2004-03 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.