• Shopping Cart
    There are no items in your cart

TS 100 615 : 8.1.0

Current

Current

The latest, up-to-date edition.

DIGITAL CELLULAR TELECOMMUNICATIONS SYSTEM (PHASE 2+); PERFORMANCE DATA MEASUREMENTS

Available format(s)

Hardcopy , PDF

Language(s)

English

€46.74
Excluding VAT

Intellectual Property Rights
Foreword
Foreword
Introduction
1 Scope
  1.1 References
  1.2 Abbreviations
2 Performance measurement concept
  2.1 Measurement data requirements
  2.2 Measurement administration
  2.3 Measurement definition
3 Performance management requirements
  3.1 Introduction
  3.2 Measurement jobs
  3.3 Measurement results
4 Detailed description of the measurement system for a PLMN
  4.1 Introduction
  4.2 Modelling of measurement jobs
  4.3 Modelling of measurement results
  4.4 Conformance requirements
  4.5 Application Context
5 Future Enhancements
Annex A (informative): Graphical examples
Annex B (normative): Performance Measurement Requirements
Summary
      B.1 Measurements Related To The BSC
      B.2 Measurements related to the BTS
      B.3 Measurements Related to the MSC
      B.4 Measurements Related to the HLR
      B.5 Measurements Related to the VLR
      B.6 Measurements Related to the EIR
      B.7 Measurements Related to the SMS IWMSC/GMSC
      B.8 Measurements Related to the SGSN
      B.9 Measurements Related to the GGSN
Annex C (normative): Performance Measurement Object Model
      C.1 Measurement Managed Object Classes
      C.2 Measurement Package Definitions
      C.3 Measurement Attribute Definitions
      C.4 Name Bindings
      C.5 Behaviour Definitions
      C.6 Abstract syntax definitions
Annex D (normative): Data Transfer Requirements
      D.1 Data Transfer Requirements
      D.2 Object Model
Annex E (informative): Non Standardised Measurements of
        Interest to PLMN Management
      E.1 Measurement Related to the BSC
      E.2 Measurement Related to the BTS
      E.3 Measurement Related to the MSC
      E.4 Measurements related to the HLR
      E.5 Measurements related to the VLR
      E.6 Measurements related to the EIR
      E.7 Measurements related to the SMS-IWMSC/GMSC
      E.8 Performance Measurements on non-specific GSM Objects
Annex F (informative): Index of Measurement Attribute Names
Annex G (informative): Bibliography
Annex H (informative): Change history
History

Specifies the requirements for the management of performance measurements and the collection of performance measurement data across a Public Land Mobile Network (PLMN).

Committee
3GPP SA 5
DocumentType
Standard
Pages
217
PublisherName
European Telecommunications Standards Institute
Status
Current

TS 101 962 : 1.1.1 TERRESTRIAL TRUNKED RADIO (TETRA); TETRA ADVANCED PACKET SERVICE (TAPS)

ETS 300 612-1 : 20001 DIGITAL CELLULAR TELECOMMUNICATIONS SYSTEM (PHASE 2) - NETWORK MANAGEMENT (NM) - OBJECTIVES AND STRUCTURE OF NETWORK MANAGEMENT
ETR 128 : 20002 EUROPEAN DIGITAL CELLULAR TELECOMMUNICATIONS SYSTEM (PHASE 2); ETSI OBJECT IDENTIFIER TREE; COMMON DOMAIN; MOBILE DOMAIN; OPERATION AND MAINTENANCE (O & M), MANAGED OBJECT REGISTRATION DEFINITION
ETS 300 617 : 20001 DIGITAL CELLULAR TELECOMMUNICATIONS SYSTEM (PHASE 2) - GSM NETWORK CONFIGURATION MANAGEMENT
ETS 300 612-2 : 20001 DIGITAL CELLULAR TELECOMMUNICATIONS SYSTEM (PHASE 2) - NETWORK MANAGEMENT (NM) - COMMON ASPECTS OF GSM/DCS 1800

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.