UNI EN 13290-7 : 2001
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
SPACE PROJECT MANAGEMENT - GENERAL REQUIREMENTS - COST AND SCHEDULE MANAGEMENT
31-07-2001
31-07-2001
Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
3.1 Terms and definitions
3.2 Abbreviated terms
4 Principles for cost management
4.1 Cost estimation and planning
4.2 Cost control
4.3 Cost reporting
5 Requirements for cost management
6 Principles for schedule creation
6.1 General
6.2 Schedule creation
6.3 Schedule control
6.4 Schedule reporting
6.5 Schedule review meetings
6.6 Schedule deviations
7 Requirements for schedule management
Bibliography
Gives the requirements specified herein apply to, and affect the customer and supplier at all levels, when the capability to design and supply conforming product needs to be demonstrated.
DocumentType |
Standard
|
PublisherName |
Ente Nazionale Italiano di Unificazione (UNI)
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
NF EN 13290-7 : 2002 | Identical |
UNE-EN 13290-7:2002 | Identical |
NBN EN 13290-7 : 2001 | Identical |
NEN EN 13290-7 : 2001 | Identical |
NS EN 13290-7 : 1ED 2001 | Identical |
I.S. EN 13290-7:2001 | Identical |
BS EN 13290-7:2001 | Identical |
EN 13290-7:2001 | Identical |
DIN EN 13290-7:2002-12 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.