FOREWORD
PREFACE
SECTION 1 - SCOPE
1 Scope
SECTION 2 - GENERAL
2.1 Related documents
2.2 Units, symbols and terminology
2.3 Preferred values
2.4 Marking
SECTION 3 - QUALITY ASSESSMENT PROCEDURES
3.1 Primary stage of manufacture
3.2 Structurally similar parts
3.3 Qualification approval procedures
3.4 Certified test records
3.5 Delayed delivery
3.6 Alternative test methods
3.7 Release for delivery before the completion of
Group B tests
3.8 Formation of inspection lots
SECTION 4 - TEST AND MEASUREMENT PROCEDURES
4.1 Standard conditions for testing
4.2 Drying and recovery
4.3 Visual inspection and check of dimensions
4.4 Zero-power resistance
4.5 B-value or resistance ratio
4.6 Insulation resistance
4.7 Voltage proof
4.8 Resistance/temperature characteristic
4.9 Dissipation factor (delta)
4.10 Thermal time constant by cooling (tau c)
4.11 Thermal time constant by ambient change (tau a)
4.12 Robustness of terminations
4.13 Soldering
4.14 Rapid change of temperature
4.15 Vibration
4.16 Bump
4.17 Shock
4.18 Climatic sequence
4.19 Damp heat, steady state
4.20 Endurance
SECTION 5 - BLANK DETAIL SPECIFICATION
APPENDICES
A Fixed sample size test schedule for qualification
approval
B.1 Preferred mounting for thermistors without wire
termination
B.2 Preferred mounting for thermistors with wire
termination
FIGURES