12/30265386 DC : 0
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
BS EN 62271-3 ED 2 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850
Hardcopy , PDF
31-05-2015
English
FOREWORD
0 Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Normal and special service conditions
5 Ratings and classifications
6 Design and construction
7 Type tests
8 Routine tests
9 Information to be given with enquiries, tenders
and orders
10 Rules for transport, storage, installation,
operation and maintenance
11 Safety
Annex A (normative) - Test overview table
Annex B (normative) - LNs for sensors and monitoring
Annex C (normative) - Electronic nameplates
BS EN 62271-3 ED 2.
Committee |
PEL/17/1
|
DocumentType |
Draft
|
Pages |
51
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy |
IEC 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
IEC 60874-10-3:1997 | Connectors for optical fibres and cables - Part 10-3: Detail specification for fibre optic adaptor type BFOC/2,5 for single and multimode fibre |
IEC 61850-7-410:2012+AMD1:2015 CSV | Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control |
IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
ISO/IEC 8802-3:2000 | Information technology Telecommunications and information exchange between systems Local and metropolitan area networks Specific requirements Part 3: Carrier sense multiple access with collision detection (CSMA/CD) access method and physical layer specifications |
IEC 60870-4:1990 | Telecontrol equipment and systems. Part 4: Performance requirements |
IEC TR 61850-1:2013 | Communication networks and systems for power utility automation - Part 1: Introduction and overview |
IEC 61850-7-1:2011 | Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
IEC 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC TR 62063:1999 | High-voltage switchgear and controlgear - The use of electronic and associated technologies in auxiliary equipment of switchgear and controlgear |
IEC 62271-103:2011 | High-voltage switchgear and controlgear - Part 103: Switches for rated voltages above 1 kV up to and including 52 kV |
IEC 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
IEC 61850-4:2011 | Communication networks and systems for power utility automation - Part 4: System and project management |
IEC 61850-7-420:2009 | Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 62271-1:2017 | High-voltage switchgear and controlgear - Part 1: Common specifications for alternating current switchgear and controlgear |
IEC 61850-7-3:2010 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC 61850-10:2012 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEC TS 61850-2:2003 | Communication networks and systems in substations - Part 2: Glossary |
IEC 61850-3:2013 | Communication networks and systems for power utility automation - Part 3: General requirements |
IEC 62271-104:2015 | High-voltage switchgear and controlgear - Part 104: Alternating current switches for rated voltages higher than 52 kV |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.