EN 61400-25-5:2017
|
Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
IEC 61850-6:2009
|
Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEC TR 61850-1:2013
|
Communication networks and systems for power utility automation - Part 1: Introduction and overview |
EN 61850-10:2013
|
Communication networks and systems for power utility automation - Part 10: Conformance testing |
EN 62271-3:2015
|
High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
02/206919 DC : DRAFT MAY 2002
|
IEC 61850-8-1. ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO MMS (ISO/IEC 9506 PART 1 AND PART 2) OVER ISO 8802-3 |
CEI EN 61850-10 : 2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING |
I.S. EN 62271-3:2015
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
12/30260040 DC : 0
|
BS EN 62270 - GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION |
04/30092543 DC : DRAFT MAR 2004
|
|
IEEE C37.119-2005
|
GUIDE FOR BREAKER FAILURE PROTECTION OF POWER CIRCUIT BREAKERS |
BS EN 62271-3:2015
|
High-voltage switchgear and controlgear Digital interfaces based on IEC 61850 |
12/30218691 DC : 0
|
BS EN 61175 - INDUSTRIAL SYSTEMS, INSTALLATIONS AND EQUIPMENT AND INDUSTRIAL PRODUCTS - DESIGNATION OF SIGNALS |
PD IEC/TR 61850-1:2013 (published 2013-03)
|
Communication networks and systems for power utility automation Introduction and overview |
03/304152 DC : DRAFT MAR 2003
|
IEC 61850-10 ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 10: CONFORMANCE TESTING |
PD IEC/TR 61850-90-4:2013
|
Communication networks and systems for power utility automation Network engineering guidelines |
DD IEC/TS 61850-2:2003
|
Communication networks and systems in substations Glossary |
12/30265386 DC : 0
|
BS EN 62271-3 ED 2 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
BS EN 61850-7-1:2011
|
Communication networks and systems for power utility automation Basic communication structure. Principles and models |
CEI EN 61400-25-5 : 2007
|
WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
IEC 62270:2013
|
Guide for computer-based control for hydroelectric power plant automation |
EN 61850-7-1:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011) |
PD IEC/TR 61850-90-2:2016
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 90-2: USING IEC 61850 FOR COMMUNICATION BETWEEN SUBSTATIONS AND CONTROL CENTRES |
CEI EN 61850-7-1 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS |
BS EN 61850-10:2013
|
Communication networks and systems for power utility automation Conformance testing |
I.S. EN 61400-25-5:2017
|
WIND ENERGY GENERATION SYSTEMS - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - COMPLIANCE TESTING |
I.S. EN 61850-7-1:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011 (EQV)) |
BS EN 61175 : 2015
|
INDUSTRIAL SYSTEMS, INSTALLATIONS AND EQUIPMENT AND INDUSTRIAL PRODUCTS - DESIGNATION OF SIGNALS |
IEC 61850-7-1:2011
|
Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
IEC 62271-3:2015
|
High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
05/30137813 DC : DRAFT AUG 2005
|
IEC 61400-25-5 ED 1 - WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
IEC TS 61850-2:2003
|
Communication networks and systems in substations - Part 2: Glossary |
BS EN 61400-25-5:2017
|
Wind energy generation systems Communications for monitoring and control of wind power plants. Compliance testing |
IEEE 1249 : 2013
|
GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION |
IEEE 2030.100:2017
|
IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control |
IEC TR 61850-90-2:2016
|
Communication networks and systems for power utility automation - Part 90-2: Using IEC 61850 for communication between substations and control centres |
IEC 61400-25-5:2017
|
Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
I.S. EN 61850-10:2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV)) |
IEC 61850-10:2012
|
Communication networks and systems for power utility automation - Part 10: Conformance testing |
EN 61175:2005
|
Industrial systems, installations and equipment and industrial products - Designation of signals |