API 96 : 2013
Current
The latest, up-to-date edition.
DEEPWATER WELL DESIGN AND CONSTRUCTION
Hardcopy , PDF
English
31-03-2013
1 Scope
2 Normative References
3 Terms, Definitions, and Abbreviations
4 Deepwater Rig Systems and Subsea Configurations
5 Well Design Considerations
6 Special Considerations for Drilling
7 Special Considerations for Completions
8 Drilling Operations Considerations
9 Completion Operations Considerations
10 Management of Change
Annex A (informative) - Examples of Barriers Employed During
Operations
Annex B (informative) - Example Barrier Definitions
Annex C (informative) - Examples of Inflow Testing
Bibliography
Gives engineers a reference for deepwater DW well design as well as drilling and completion operations.
DocumentType |
Standard
|
Pages |
170
|
ProductNote |
This product is unavailable in Cuba, Iran, North Korea, Syria
|
PublisherName |
American Petroleum Institute
|
Status |
Current
|
API 92L : 2015 | DRILLING AHEAD SAFELY WITH LOST CIRCULATION IN THE GULF OF MEXICO |
16/30292328 DC : 0 | BS ISO 27914 - CARBON DIOXIDE CAPTURE, TRANSPORTATION AND GEOLOGICAL STORAGE - GEOLOGICAL STORAGE |
API 97 : 2013 | WELL CONSTRUCTION INTERFACE DOCUMENT GUIDELINES |
API 100-1 : 2015 | HYDRAULIC FRACTURING - WELL INTEGRITY AND FRACTURE CONTAINMENT |
API 10B-2 : 2013 | RECOMMENDED PRACTICE FOR TESTING WELL CEMENTS |
API 2A WSD : 2014 | PLANNING, DESIGNING, AND CONSTRUCTING FIXED OFFSHORE PLATFORMS - WORKING STRESS DESIGN |
API 10B-3 : 2016 | TESTING OF WELL CEMENTS USED IN DEEPWATER WELL CONSTRUCTION |
API TR 10TR1 : 2008 | CEMENT SHEATH EVALUATION |
API 5CT : 2012 | CASING AND TUBING |
API TR 6AF2 : 2013 | TECHNICAL REPORT ON CAPABILITIES OF API INTEGRAL FLANGES UNDER COMBINATION OF LOADING - PHASE 2 |
API TR 6AF1 : 1998 | TECHNICAL REPORT ON TEMPERATURE DERATING ON API FLANGES UNDER COMBINATION OF LOADING |
API 6A : 2010 | SPECIFICATION FOR WELLHEAD AND CHRISTMAS TREE EQUIPMENT |
API 14A : 2015 | SPECIFICATION FOR SUBSURFACE SAFETY VALVE EQUIPMENT |
NACE TM 01 77 : 2016 | LABORATORY TESTING OF METALS FOR RESISTANCE TO SULFIDE STRESS CRACKING AND STRESS CORROSION CRACKING IN H[2]S ENVIRONMENTS |
API 10A : 2011 | SPECIFICATION FOR CEMENTS AND MATERIALS FOR WELL CEMENTING |
API 2RD : 2013 | DYNAMIC RISERS FOR FLOATING PRODUCTION SYSTEMS |
API 65 : 2002 | CEMENTING SHALLOW WATER FLOW ZONES IN DEEPWATER WELLS |
ISO 28781:2010 | Petroleum and natural gas industries Drilling and production equipment Subsurface barrier valves and related equipment |
API RP 16Q : 2017 | DESIGN, SELECTION, OPERATION, AND MAINTENANCE OF MARINE DRILLING RISER SYSTEMS |
API RP 14B : 2015 | DESIGN, INSTALLATION, OPERATION, TEST, AND REDRESS OF SUBSURFACE SAFETY VALVE SYSTEMS |
API 5C3 : 1994 | BULLETIN ON FORMULAS AND CALCULATIONS FOR CASING, TUBING, DRILL PIPE AND LINE PIPE PROPERTIES |
API SPEC 11D1 : 2015 | PACKERS AND BRIDGE PLUGS |
API RP 13B-2 : 2014 | RECOMMENDED PRACTICE FOR FIELD TESTING OF OIL-BASED DRILLING FLUIDS |
ISO 10432:2004 | Petroleum and natural gas industries Downhole equipment Subsurface safety valve equipment |
API 8B : 2014 | RECOMMENDED PRACTICE FOR PROCEDURES FOR INSPECTIONS, MAINTENANCE, REPAIR, AND REMANUFACTURE OF HOISTING EQUIPMENT |
API 2INT-DG : 2007 | INTERIM GUIDANCE FOR DESIGN OF OFFSHORE STRUCTURES FOR HURRICANE CONDITIONS |
API 6AF : 2008 | TECHNICAL REPORT ON CAPABILITIES OF API FLANGES UNDER COMBINATIONS OF LOAD |
CFR 30(PTS200-699) : JUL 2017 | MINERAL RESOURCES - DEPARTMENT OF THE INTERIOR |
ISO 10426-6:2008 | Petroleum and natural gas industries — Cements and materials for well cementing — Part 6: Methods for determining the static gel strength of cement formulations |
API 10TR4 : 2008 | SELECTION OF CENTRALIZERS FOR PRIMARY CEMENTING OPERATIONS |
API 53 : 2012 | BLOWOUT PREVENTION EQUIPMENT SYSTEMS FOR DRILLING WELLS |
API 17H : 2013 | REMOTELY OPERATED TOOLS AND INTERFACES ON SUBSEA PRODUCTION SYSTEMS |
API 2INT-MET : 2007 | INTERIM GUIDANCE ON HURRICANE CONDITIONS IN THE GULF OF MEXICO |
API 17D : 2011 | DESIGN AND OPERATION OF SUBSEA PRODUCTION SYSTEMS - SUBSEA WELLHEAD AND TREE EQUIPMENT |
API 5C5 : 2017 | PROCEDURES FOR TESTING CASING AND TUBING CONNECTIONS |
API TR 17TR3 : 2004 | AN EVALUATION OF THE RISKS AND BENEFITS OF PENETRATIONS IN SUBSEA WELLHEADS BELOW THE BOP STACK |
API 1111 : 2015 | DESIGN, CONSTRUCTION, OPERATION, AND MAINTENANCE OF OFFSHORE HYDROCARBON PIPELINES (LIMIT STATE DESIGN) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.