1 - AS/NZS 4114.2:2003 SPRAY PAINTING BOOTHS, DESIGNATED SPRAY PAINTING AREAS AND PAINT MIXING ROOMS - INSTALLATION AND...
4 - PREFACE
5 - CONTENTS
6 - SECTION 1 GENERAL
6 - 1.1 SCOPE
6 - 1.2 APPLICATION
6 - 1.3 REFERENCED DOCUMENTS
7 - 1.4 DEFINITIONS
7 - 1.4.1 Designated spray painting areas
7 - 1.5 DOCUMENTATION
8 - 1.6 QUALIFICATIONS OF PERSONNEL
8 - 1.7 AREA CLASSIFICATION
8 - 1.8 ENVIRONMENTAL CONDITIONS AND OTHER EXTERNAL INFLUENCES
9 - SECTION 2 INSTALLATION AND MAINTENANCE
9 - 2.1 SCOPE OF SECTION
9 - 2.2 AREAS ASSOCIATED WITH SPRAY PAINTING BOOTHS
9 - 2.3 DESIGNATED SPRAY PAINTING AREAS
9 - 2.3.1 Authorization
9 - 2.3.2 Documentation
9 - 2.3.3 Site preparation
9 - 2.3.4 Isolation of power
9 - 2.3.5 Training
9 - 2.3.6 Fire protection
9 - 2.3.7 Removal of personnel
9 - 2.3.8 Clean up procedure
9 - 2.3.9 Reclaim and containment of contaminates
10 - 2.3.10 Earthing/bonding
10 - 2.3.11 Security
10 - 2.3.12 Access
10 - 2.3.13 Personal protective equipment (PPE)
10 - 2.3.14 Signage
10 - 2.4 METHODS OF INSTALLATION
10 - 2.5 DUCTWORK
10 - 2.6 COMBUSTIBLE MATERIALS
10 - 2.7 LOCATION OF PAINT MIXING ROOMS
11 - 2.8 MAINTENANCE
11 - 2.9 MODIFICATIONS AND ALTERATIONS
12 - APPENDIX A - RELEVANT AUTHORITIES
12 - A1 SCOPE
12 - A2 AUTHORITIES IN AUSTRALIA
13 - A3 AUTHORITIES IN NEW ZEALAND
14 - APPENDIX B - INSPECTION, TESTING AND MAINTENANCE
14 - B1 SPECIAL INSPECTIONS FOR MOVABLE APPARATUS
14 - B2 INSPECTION CHECKS
14 - B2.1 General
14 - B2.2 Area classification
14 - B2.3 Modifications
14 - B2.4 Temperature class
14 - B2.5 Marking
14 - B2.6 Circuit identification
14 - B2.7 Lamps and fuses
14 - B2.8 Earthing and bonding
15 - B2.9 Electrical connections
15 - B2.10 Damage
15 - B2.11 Electrical protection
15 - B2.12 Compliance with documentation
15 - B3 MAINTENANCE
15 - B3.1 General
15 - B3.2 Check list
15 - B3.3 Removal of electrical apparatus
15 - B3.4 Air filters
15 - B3.5 Repair
16 - B3.6 Inspection after maintenance