CEI EN 50216-11 : 2009
|
POWER TRANSFORMER AND REACTOR FITTINGS - PART 11: OIL AND WINDING TEMPERATURE INDICATORS |
BS EN 60255-1:2010
|
Measuring relays and protection equipment Common requirements |
BS EN 60255-27:2014
|
Measuring relays and protection equipment Product safety requirements |
BS EN 50123-5:2003
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - D.C. SWITCHGEAR - PART 5: SURGE ARRESTERS AND LOW-VOLTAGE LIMITERS FOR SPECIFIC USE IN D.C. SYSTEMS |
I.S. EN 61850-3:2014
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 3: GENERAL REQUIREMENTS |
EN 60255-27:2014
|
Measuring relays and protection equipment - Part 27: Product safety requirements |
EN 61850-3:2014
|
Communication networks and systems for power utility automation - Part 3: General requirements |
EN 60255-21-3:1995
|
Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section 3: Seismic tests |
EN 60255-5:2001
|
Electrical relays - Part 5: Insulation coordination for measuring relays and protection equipment - Requirements and tests |
BS 142-1.5.3(1993) : 1993 AMD 8833
|
ELECTRICAL PROTECTION RELAYS - INFORMATION AND REQUIREMENTS FOR ALL PROTECTION RELAYS - VIBRATION, SHOCK, BUMP AND SEISMIC TESTING - SEISMIC TESTS |
11/30250287 DC : 0
|
BS EN 60255-27 - MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 27: PRODUCT SAFETY REQUIREMENTS |
BS EN 50216-11:2008
|
Power transformer and reactor fittings Oil and winding temperature indicators |
08/30179134 DC : DRAFT MAR 2008
|
BS EN 60143-4 - SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS |
I.S. EN 50216-11:2008
|
POWER TRANSFORMER AND REACTOR FITTINGS - PART 11: OIL AND WINDING TEMPERATURE INDICATORS |
03/304152 DC : DRAFT MAR 2003
|
IEC 61850-10 ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 10: CONFORMANCE TESTING |
I.S. EN 50123-7-1:2003
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - D.C. SWITCHGEAR - PART 7-1: MEASUREMENT, CONTROL AND PROTECTION DEVICES FOR SPECIFIC USE IN D.C. TRACTION SYSTEMS - APPLICATION GUIDE |
IEC 62505-3-1:2009
|
Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 3-1: Measurement, control and protection devices for specific use in a.c. tractions systems - Application guide |
CEI EN 60255-27 : 2014
|
MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 27: PRODUCT SAFETY REQUIREMENTS |
IEC 61992-7-1:2006
|
Railway applications - Fixed installations - DC switchgear - Part 7-1: Measurement, control and protection devices for specific use in d.c. traction systems - Application guide |
IEC 60255-27:2013
|
Measuring relays and protection equipment - Part 27: Product safety requirements |
EN 50123-5:2003
|
Railway applications - Fixed installations - D.C. switchgear - Part 5: Surge arresters and low-voltage limiters for specific use in d.c. systems |
CEI EN 60255-21-3 : 1998
|
ELECTRICAL RELAYS - PART 21: VIBRATION, SHOCK, BUMP AND SEISMIC TESTS ON MEASURING RELAYS AND PROTECTION EQUIPMENT - SECTION 3: SEISMIC TESTS |
BS EN 60255-5:2001
|
Electrical relays Insulation coordination for measuring relays and protection equipment. Requirements and tests |
01/206938 DC : DRAFT OCT 2001
|
IEC 60255-27 ED.1.0 - MEASURING RELAYS AND EQUIPMENT - PART 27: PRODUCT SAFETY REQUIREMENTS FOR MEASURING RELAYS AND PROTECTION EQUIPMENT |
NF EN 50216-11 : 2008
|
POWER TRANSFORMER AND REACTOR FITTINGS - PART 11: OIL AND WINDING TEMPERATURE INDICATORS |
CEI EN 61850-3 : 2014
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 3: GENERAL REQUIREMENTS |
IEC 60255-21-3:1993
|
Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section 3: Seismic tests |
CEI EN 60255-1 : 2011
|
MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 1: COMMON REQUIREMENTS |
IEC 60255-1:1967
|
Electrical relays - Part 1: Instantaneous all-or-nothing relays |
IEC 61850-3:2013
|
Communication networks and systems for power utility automation - Part 3: General requirements |
NF EN 60255 21-3 : 1998
|
ELECTRICAL RELAYS - PART 21: VIBRATION, SHOCK, BUMP AND SEISMIC TESTS ON MEASURING RELAYS AND PROTECTION EQUIPMENT - SECTION 3: SEISMIC TESTS |
CEI EN 60255-5 : 2001
|
ELECTRICAL RELAYS - PART 5: INSULATION COORDINATION FOR MEASURING RELAYS AND PROTECTION EQUIPMENT REQUIREMENTS AND TESTS |
BS EN 61850-3:2014
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 3: GENERAL REQUIREMENTS |
I.S. EN 60255-27:2014
|
MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 27: PRODUCT SAFETY REQUIREMENTS |
IEEE C37.98-2013
|
SEISMIC QUALIFICATION TESTING OF PROTECTIVE RELAYS AND AUXILIARIES FOR NUCLEAR FACILITIES |
I.S. EN 60255-21-3:1997
|
ELECTRICAL RELAYS - PART 21: VIBRATION, SHOCK, BUMP AND SEISMIC TESTS ON MEASURING RELAYS AND PROTECTION EQUIPMENT - SECTION 3: SEISMIC TESTS |
NF EN 60255-1 : 2010
|
MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 1: COMMON REQUIREMENTS |
NF EN 60255-5 : 2001
|
ELECTRICAL RELAYS - PART 5: INSULATION COORDINATION FOR MEASURING RELAYS AND PROTECTION EQUIPMENT - REQUIREMENTS AND TESTS |
CEI EN 50123-7-1 : 2003
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - D.C. SWITCHGEAR - PART 7-1: MEASUREMENT, CONTROL AND PROTECTION DEVICES FOR SPECIFIC USE IN D.C. TRACTION SYSTEMS - APPLICATION GUIDE |
I.S. EN 60255-1:2010
|
MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 1: COMMON REQUIREMENTS |
EN 50216-11:2008
|
Power transformer and reactor fittings - Part 11: Oil and winding temperature indicators |
EN 60255-1:2010
|
Measuring relays and protection equipment - Part 1: Common requirements |