IEC 61000-4-8 : 2.0
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-8: TESTING AND MEASUREMENT TECHNIQUES - POWER FREQUENCY MAGNETIC FIELD IMMUNITY TEST |
IEC 60255-21-2:1988
|
Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section Two: Shock and bump tests |
IEC 60297-3-101:2004
|
Mechanical structures for electronic equipment - Dimensions of mechanical structures of the 482,6 mm (19 in) series - Part 3-101: Subracks and associated plug-in units |
EN ISO 780:2015
|
PACKAGING - DISTRIBUTION PACKAGING - GRAPHICAL SYMBOLS FOR HANDLING AND STORAGE OF PACKAGES (ISO 780:2015) |
EN 50561-1:2013/AC:2015
|
Power line communication apparatus used in low-voltage installations - Radio disturbance characteristics - Limits and methods of measurement - Part 1: Apparatus for in-home use |
EN 55024 : 2010 AMD 1 2015
|
INFORMATION TECHNOLOGY EQUIPMENT - IMMUNITY CHARACTERISTICS - LIMITS AND METHODS OF MEASUREMENT (CISPR 24:2010/A1:2015) |
EN 60255-27:2014
|
MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 27: PRODUCT SAFETY REQUIREMENTS (IEC 60255-27:2013) |
EN 60825-1:2014/AC:2017-06
|
SAFETY OF LASER PRODUCTS - PART 1: EQUIPMENT CLASSIFICATION AND REQUIREMENTS (IEC 60825-1:2014) |
IEC 61000-4-4 : 3.0EN+(REDLINE+VERSION)
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-4: TESTING AND MEASUREMENT TECHNIQUES - ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST |
EN 61000-4-11:2004/A1:2017
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-11: TESTING AND MEASUREMENT TECHNIQUES - VOLTAGE DIPS, SHORT INTERRUPTIONS AND VOLTAGE VARIATIONS IMMUNITY TESTS (IEC 61000-4-11:2004/A1:2017) |
EN 62271-1:2017
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 1: COMMON SPECIFICATIONS FOR ALTERNATING CURRENT SWITCHGEAR AND CONTROLGEAR (IEC 62271-1:2017) |
IEC 60255-21-3:1993
|
Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section 3: Seismic tests |
EN 60068-2-2:2007
|
ENVIRONMENTAL TESTING - PART 2-2: TESTS - TEST B: DRY HEAT |
IEC 61000-4-11:2004+AMD1:2017 CSV
|
Electromagnetic compatibility (EMC) - Part 4-11: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests |
IEC 60825-1:2014
|
Safety of laser products - Part 1: Equipment classification and requirements |
IEC 61000-4-17:1999+AMD1:2001+AMD2:2008 CSV
|
Electromagnetic compatibility (EMC) - Part 4-17: Testing and measurement techniques - Ripple on d.c. input power port immunity test |
EN 61000-4-2:2009
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-2: TESTING AND MEASUREMENT TECHNIQUES - ELECTROSTATIC DISCHARGE IMMUNITY TEST |
IEC 60127-1:2006+AMD1:2011+AMD2:2015 CSV
|
Miniature fuses - Part 1: Definitions for miniature fuses andgeneral requirements for miniature fuse-links |
EN 60417-2:1999
|
GRAPHICAL SYMBOLS FOR USE ON EQUIPMENT - PART 2: SYMBOL ORIGINALS |
IEC 61000-4-6 : 4.0
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-6: TESTING AND MEASUREMENT TECHNIQUES - IMMUNITY TO CONDUCTED DISTURBANCES, INDUCED BY RADIO-FREQUENCY FIELDS |
CISPR 22:2008
|
Information technology equipment - Radio disturbance characteristics - Limits and methods of measurement |
IEC 61180-2:1994
|
High-voltage test techniques for low-voltage equipment - Part 2: Test equipment |
ISO 780:2015
|
Packaging Distribution packaging Graphical symbols for handling and storage of packages |
EN 55022:2010/AC:2011
|
INFORMATION TECHNOLOGY EQUIPMENT - RADIO DISTURBANCE CHARACTERISTICS - LIMITS AND METHODS OF MEASUREMENT (CISPR 22:2008) |
IEC 60529:1989+AMD1:1999+AMD2:2013 CSV
|
Degrees of protection provided by enclosures (IP Code) |
ISO 9772:2012
|
Cellular plastics Determination of horizontal burning characteristics of small specimens subjected to a small flame |
IEC TS 61000-6-5:2001
|
Electromagnetic compatibility (EMC) - Part 6-5: Generic standards - Immunity for power station and substation environments |
IEC 60255-27:2013
|
Measuring relays and protection equipment - Part 27: Product safety requirements |
IEC 60068-2-2:2007
|
Environmental testing - Part 2-2: Tests - Test B: Dry heat |
IEC 61000-4-2:2008
|
Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test |
IEC 60695-11-10:2013
|
Fire hazard testing - Part 11-10: Test flames - 50 W horizontal and vertical flame test methods |
IEC 61000-4-3:2006+AMD1:2007+AMD2:2010 CSV
|
Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity test |
EN 60664-1:2007
|
INSULATION COORDINATION FOR EQUIPMENT WITHIN LOW-VOLTAGE SYSTEMS - PART 1: PRINCIPLES, REQUIREMENTS AND TESTS |
IEC 60255-21-1:1988
|
Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section One: Vibration tests (sinusoidal) |
IEC 62271-1:2017
|
High-voltage switchgear and controlgear - Part 1: Common specifications for alternating current switchgear and controlgear |
EN 60068-2-78:2013
|
ENVIRONMENTAL TESTING - PART 2-78: TESTS - TEST CAB: DAMP HEAT, STEADY STATE (IEC 60068-2-78:2012) |
EN 60255-21-1 : 1995
|
ELECTRICAL RELAYS - VIBRATION, SHOCK, BUMP AND SEISMIC TESTS ON MEASURING RELAYS AND PROTECTION EQUIPMENT - VIBRATION TESTS (SINUSOIDAL) |
IEC 60721-3-3:1994+AMD1:1995+AMD2:1996 CSV
|
Classification of environmental conditions - Part 3-3: Classification of groups of environmental parameters and their severities - Stationary use at weatherprotected locations |
EN 61000-4-4:2012
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-4: TESTING AND MEASUREMENT TECHNIQUES - ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST (IEC 61000-4-4:2012) |
IEC 60068-2-1:2007
|
Environmental testing - Part 2-1: Tests - Test A: Cold |
IEC 61180-1:1992
|
High-voltage test techniques for low voltage equipment - Part 1: Definitions, test and procedure requirements |
EN 61000-4-6:2014/AC:2015
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-6: TESTING AND MEASUREMENT TECHNIQUES - IMMUNITY TO CONDUCTED DISTURBANCES, INDUCED BY RADIO-FREQUENCY FIELDS (IEC 61000-4-6:2013) |
EN 61010-1:2010
|
SAFETY REQUIREMENTS FOR ELECTRICAL EQUIPMENT FOR MEASUREMENT, CONTROL AND LABORATORY USE - PART 1: GENERAL REQUIREMENTS (IEC 61010-1:2010) |
ISO 7000:2014
|
Graphical symbols for use on equipment Registered symbols |
EN 60068-2-30:2005
|
ENVIRONMENTAL TESTING - PART 2-30: TESTS - TEST DB: DAMP HEAT, CYCLIC (12 H + 12 H CYCLE) |
IEC 61000-4-29:2000
|
Electromagnetic compatibility (EMC) - Part 4-29: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations on d.c. input power port immunity tests |
IEC 60068-2-14:2009
|
Environmental testing - Part 2-14: Tests - Test N: Change of temperature |
EN 60255-21-2 : 1995
|
ELECTRICAL RELAYS - VIBRATION, SHOCK, BUMP AND SEISMIC TESTS ON MEASURING RELAYS AND PROTECTION EQUIPMENT - SHOCK AND BUMP TESTS |
IEC 61010-1:2010+AMD1:2016 CSV
|
Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 1: General requirements |
EN 61180-2 : 1994
|
HIGH-VOLTAGE TEST TECHNIQUES FOR LOW-VOLTAGE EQUIPMENT - PART 2: TEST EQUIPMENT |
IEC TS 61850-2:2003
|
Communication networks and systems in substations - Part 2: Glossary |
HD 243 : S12
|
GRAPHICAL SYMBOLS FOR USE ON EQUIPMENT - INDEX, SURVEY AND COMPILATION OF THE SINGLE SHEETS |
IEC 60664-1:2007
|
Insulation coordination for equipment within low-voltage systems - Part 1: Principles, requirements and tests |
EN 60068-2-14:2009
|
ENVIRONMENTAL TESTING - PART 2-14: TESTS - TEST N: CHANGE OF TEMPERATURE |
EN 60255-21-3:1995
|
ELECTRICAL RELAYS - PART 21: VIBRATION, SHOCK, BUMP AND SEISMIC TESTS ON MEASURING RELAYS AND PROTECTION EQUIPMENT - SECTION 3: SEISMIC TESTS |
CISPR 24:2010+AMD1:2015 CSV
|
Information technology equipment - Immunity characteristics - Limitsand methods of measurement |
IEC 61000-4-18:2006+AMD1:2010 CSV
|
Electromagnetic compatibility (EMC) - Part 4-18: Testing and measurement techniques - Damped oscillatory wave immunity test |
EN 61180-1 : 1994
|
HIGH-VOLTAGE TEST TECHNIQUES FOR LOW-VOLTAGE EQUIPMENT - PART 1: DEFINITIONS, TEST AND PROCEDURE REQUIREMENTS |
EN 61000-4-29 : 2000
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-29: TESTING AND MEASUREMENT TECHNIQUES - VOLTAGE DIPS, SHORT INTERRUPTIONS AND VOLTAGE VARIATIONS ON D.C. INPUT POWER PORT IMMUNITY TESTS |
IEC 60990:2016
|
Methods of measurement of touch current and protective conductor current |
IEC 61000-4-16 : 2.0
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-16: TESTING AND MEASUREMENT TECHNIQUES - TEST FOR IMMUNITY TO CONDUCTED, COMMON MODE DISTURBANCES IN THE FREQUENCY RANGE 0 HZ TO 150 KHZ |
EN 60990:2016
|
METHODS OF MEASUREMENT OF TOUCH CURRENT AND PROTECTIVE CONDUCTOR CURRENT (IEC 60990:2016) |
IEC 60068-2-30:2005
|
Environmental testing - Part 2-30: Tests - Test Db: Damp heat, cyclic (12 h + 12 h cycle) |