• Shopping Cart
    There are no items in your cart

IEC 61839:2000

Current

Current

The latest, up-to-date edition.

Nuclear power plants - Design of control rooms - Functional analysis and assignment

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Language(s)

English - French

Published date

21-07-2000

€119.56
Excluding VAT

FOREWORD
1 Scope and object
2 Normative references
3 Definitions
4 Process of functional analysis and assignment
      4.1 General description
             4.1.1 Functional analysis
             4.1.2 Assignment of functions
      4.2 Basic technical team for FA and A
5 Functional analysis
      5.1 General
      5.2 Identification of functions
      5.3 Identification of basic information and
             processing requirements
             5.3.1 Individual function analysis
             5.3.2 Identification of time requirements
                      and representative events
6 Assignment of functions
      6.1 General
      6.2 Control function analysis
             6.2.1 Identifying functional units
             6.2.2 Characterising the control functions
             6.2.3 Identifying control function
                      characteristic measurements
      6.3 Development of assignment criteria
             6.3.1 Characteristic measurement and man-
                      machine capabilit and guides
             6.3.2 National law, national and
                      international legal rules
             6.3.3 Utility and vendors' rules and policies
             6.3.3 Utility and vendors' rules and policies
      6.4 Assignment process
Annex A (informative) Examples of decomposition of goals and
                      subgoals
Annex B (informative) Beginning of PWR (pressurized water
                      reactor) functional analysis
Bibliography
Figure 1 - Illustrated FA and A activities given in IEC 60964
Table 1 - Humans and machines in the functional domain and in
          the physical domain
Table 2 - Assignment of functions to humans and machines -
          Basic structure

Specifies functional analysis and assignment procedures for the design of the control-room system for nuclear power plants and gives rules for developing criteria for the assignment of functions. Supplements IEC 60964. Is applicable to the design of new control-rooms or to backfits to existing control-rooms.

DevelopmentNote
Stability Date: 2020. (09/2017)
DocumentType
Standard
Pages
39
PublisherName
International Electrotechnical Committee
Status
Current

Standards Relationship
DIN IEC 61839 : 2002 Identical
NF EN 61839 : 2014 Identical
NBN EN 61839 : 2014 Identical
NEN IEC 61839 : 2001 Identical
NEN EN IEC 61839 : 2014 Identical
PN EN 61839 : 2014 Identical
VDE 0491-5 : 2015 Identical
DIN EN 61839 : 2015 Identical
UNE-EN 61839:2014 Identical
BS EN 61839:2014 Identical
BS IEC 61839 : 2000 Identical
CEI EN 61839 : 1ED 2015 Identical
EN 61839:2014 Identical
SN EN 61839:2014 Identical
PNE-prEN 61839 Identical

BS EN 61226:2010 Nuclear power plants. Instrumentation and control important to safety. Classification of instrumentation and control functions
07/30135879 DC : 0
BS IEC 60965 : 2009 NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL POINTS FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM
CEI EN 61772 : 2013 NUCLEAR POWER PLANTS - CONTROL ROOMS - APPLICATION OF VISUAL DISPLAY UNITS (VDUS)
IEC 62646:2016 Nuclear power plants - Control rooms - Computer-based procedures
I.S. EN 62241:2015 NUCLEAR POWER PLANTS - MAIN CONTROL ROOM - ALARM FUNCTIONS AND PRESENTATION
CEI EN 60964 : 2011 NUCLEAR POWER PLANTS - CONTROL ROOMS - DESIGN
IEC TR 62247:2003 Nuclear power plants - Main control room design - A review of the application of IEC 60964 (1989)
EN 60965:2016 Nuclear power plants - Control rooms - Supplementary control room for reactor shutdown without access to the main control room
IEC TR 62096:2009 Nuclear power plants - Instrumentation and control important to safety - Guidance for the decision on modernization
EN 61226:2010 Nuclear power plants - Instrumentation and control important to safety - Classification of instrumentation and control functions
15/30300369 DC : 0 BS IEC 62646 ED 2.0 - NUCLEAR POWER PLANTS - CONTROL ROOMS - COMPUTER BASED PROCEDURES
BS EN 62241:2015 Nuclear power plants. Main control room. Alarm functions and presentation
BS EN 61772:2013 Nuclear power plants. Control rooms. Application of visual display units (VDUs)
BS IEC 62241 : 2004 NUCLEAR POWER PLANTS - MAIN CONTROL ROOM - ALARM FUNCTIONS AND PRESENTATION
03/305178 DC : DRAFT MAR 2003
NF EN 61772 : 2013 NUCLEAR POWER PLANTS - CONTROL ROOMS - APPLICATION OF VISUAL DISPLAY UNITS (VDUS)
03/311284 DC : DRAFT JULY 2003 IEC 62241 - NUCLEAR POWER PLANTS - MAIN CONTROL ROOM - ALARM FUNCTIONS AND PRESENTATION
I.S. EN 61772:2013 NUCLEAR POWER PLANTS - CONTROL ROOMS - APPLICATION OF VISUAL DISPLAY UNITS (VDUS) (IEC 61772:2009 (EQV))
IEC 60964:2009 Nuclear power plants - Control rooms - Design
IEC 61772:2009 Nuclear power plants - Control rooms - Application of visual display units (VDUs)
I.S. EN 60965:2016 NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL ROOM FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM
I.S. EN 60964:2010 NUCLEAR POWER PLANTS - CONTROL ROOMS - DESIGN
BS EN 60965:2016 Nuclear power plants. Control rooms. Supplementary control room for reactor shutdown without access to the main control room
BS IEC 61772:2009 Nuclear power plants. Control rooms. Application of visual display units (VDUs)
BS IEC 60964 : 2009 NUCLEAR POWER PLANTS - CONTROL ROOMS - DESIGN
11/30215545 DC : 0 BS IEC 62646 - NUCLEAR POWER PLANTS - CONTROL ROOMS - COMPUTER BASED PROCEDURES
BS IEC 61226 : 2009 NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - CLASSIFICATION OF INSTRUMENTATION AND CONTROL FUNCTIONS
07/30135889 DC : DRAFT DEC 2007 IEC 61772 - NUCLEAR POWER PLANTS - CONTROL ROOMS - APPLICATION OF VISUAL DISPLAY UNIT (VDU)
BS IEC/IEEE 62646 : 2012 NUCLEAR POWER PLANTS - CONTROL ROOMS - COMPUTER BASED PROCEDURES
I.S. EN 61226:2010 NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - CLASSIFICATION OF INSTRUMENTATION AND CONTROL FUNCTIONS
IEC 61226:2009 Nuclear power plants - Instrumentation and control important to safety - Classification of instrumentation and control functions
IEC 60965:2016 Nuclear power plants - Control rooms - Supplementary control room for reactor shutdown without access to the main control room
BS IEC 62646:2016 Nuclear power plants. Control rooms. Computer-based procedures
15/30298379 DC : 0 BS EN 60965 ED 3.0 - NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL ROOM FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM
08/30166255 DC : DRAFT JUNE 2008
PD IEC/TR 62096:2009 Nuclear power plants. Instrumentation and control important to safety. Guidance for the decision on modernization
BS EN 60964:2010 Nuclear power plants. Control rooms. Design
IEC 62241:2004 Nuclear power plants - Main control room - Alarm functions and presentation
EN 60964:2010 Nuclear power plants - Control rooms - Design
EN 61772:2013 Nuclear power plants - Control rooms - Application of visual display units (VDUs)
EN 62241:2015 Nuclear power plants - Main control room - Alarm functions and presentation

IEC 61771:1995 Nuclear power plants - Main control-room - Verification and validation of design
IEC 60964:2009 Nuclear power plants - Control rooms - Design

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.