• There are no items in your cart

IEC 62439-3:2016

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Superseded date

15-12-2021

Superseded by

IEC 62439-3:2021

Language(s)

English - French

Published date

31-03-2016

€441.85
Excluding VAT

IEC 62439-3:2016 is applicable to high-availability automation networks based on the Ethernet technology. This part of IEC 62439 specifies two redundancy protocols designed to provide seamless recovery in case of single failure of an inter-bridge link or bridge in the network, which are based on the same scheme: parallel transmission of duplicated information. This third edition cancels and replaces the second edition published in 2012. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition:
- technical corrections and extension of specifications;
- consideration of IEC 61588 clock synchronization with end-to-end delay measurement alongside the existing peer-to-peer delay measurement in PRP.

Committee
TC 65/SC 65C
DevelopmentNote
Supersedes IEC 62439. (02/2010) To be read in conjunction with IEC 62439-1. (07/2012) Stability Date: 2020. (04/2016)
DocumentType
Standard
Pages
354
PublisherName
International Electrotechnical Committee
Status
Superseded
SupersededBy
Supersedes

BS EN 62439-5:2010 Industrial communication networks. High availability automation networks Beacon redundancy protocol (BRP)
PD IEC/PAS 61850-9-3:2015 Communication networks and systems for power utility automation Precision time protocol profile for power utility automation
17/30358185 DC : 0 BS EN 61850-8-1+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
BS EN 62439-1 : 2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 1: GENERAL CONCEPTS AND CALCULATION METHODS
CEI EN 61850-9-2 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3
BS EN 61850-8-1:2011 Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
IEEE C37.241-2017 IEEE Guide for Application of Optical Instrument Transformers for Protective Relaying
CEI EN 61850-8-1 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
I.S. EN 61850-9-2:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 (IEC 61850-9-2:2011 (EQV))
IEC 61400-25-4:2016 RLV Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
EN 61400-25-4:2017 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
EN 61850-10:2013 Communication networks and systems for power utility automation - Part 10: Conformance testing
EN 61162-460:2015 Maritime navigation and radiocommunication equipment and systems - Digital interfaces - Part 460: Multiple talkers and multiple listeners - Ethernet interconnection - Safety and security
EN 62439-6:2010 Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP)
I.S. EN 62439-6:2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 6: DISTRIBUTED REDUNDANCY PROTOCOL (DRP)
15/30327752 DC : 0 BS EN 4660-003 - AEROSPACE SERIES - MODULAR AND OPEN AVIONICS ARCHITECTURES - PART 003: COMMUNICATIONS AND NETWORK
09/30145360 DC : 0 BS EN 61850-9-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM)- SAMPLED VALUES OVER ISO/IEC 8802-3
BS EN 62439-6:2010 Industrial communication networks. High availability automation networks Distributed redundancy protocol (DRP)
BS EN 61400-25-4:2008 Wind turbines Communications for monitoring and control of wind power plants. Mapping to communication profile
CEI EN 61850-10 : 2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING
14/30297254 DC : 0 BS EN 62439-X - INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS
BS EN 61850-9-2:2011 Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Sampled values over ISO/IEC 8802-3
IEC TR 61850-90-5:2012 Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118
IEC 62439-4:2010 Industrial communication networks - High availability automation networks - Part 4: Cross-network Redundancy Protocol (CRP)
I.S. EN 62439-5:2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 5: BEACON REDUNDANCY PROTOCOL (BRP)
EN 62439-1:2010/A2:2017 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 1: GENERAL CONCEPTS AND CALCULATION METHODS (IEC 62439-1:2010/A2:2016)
16/30346333 DC : 0 BS EN 61162-460 - MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS -DIGITAL INTERFACES - PART 460: MULTIPLE TALKERS AND MULTIPLE LISTENERS - ETHERNET INTERCONNECTION - SAFETY AND SECURITY
CEI EN 61400-25-4 : 2009 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
BS EN 61850-10:2013 Communication networks and systems for power utility automation Conformance testing
PD IEC/TR 61850-90-4:2013 Communication networks and systems for power utility automation Network engineering guidelines
I.S. EN 61162-460:2015 MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS - DIGITAL INTERFACES - PART 460: MULTIPLE TALKERS AND MULTIPLE LISTENERS - ETHERNET INTERCONNECTION - SAFETY AND SECURITY
I.S. EN IEC 62439-5:2018 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 5: BEACON REDUNDANCY PROTOCOL (BRP)
EN IEC 62439-5:2018 Industrial communication networks - High availability automation networks - Part 5: Beacon Redundancy Protocol (BRP)
IEC 62439-1:2010+AMD1:2012+AMD2:2016 CSV Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods
EN 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
BS EN 62439-4 : 2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 4: CROSS-NETWORK REDUNDANCY PROTOCOL (CRP)
PD IEC/TR 61850-90-12:2015 Communication networks and systems for power utility automation Wide area network engineering guidelines
GR IP6 009 : 1.1.1 IPV6-BASED INDUSTRIAL INTERNET LEVERAGING 6TISCH TECHNOLOGY
BS EN 61162-460:2015 Maritime navigation and radiocommunication equipment and systems. Digital interfaces Multiple talkers and multiple listeners. Ethernet interconnection. Safety and security
PD IEC/TR 61850-90-5:2012 Communication networks and systems for power utility automation Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118
16/30344496 DC : 0 BS EN 61850-9-2+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3
CEI EN 62439-2 : 2011 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 2: MEDIA REDUNDANCY PROTOCOL (MRP)
I.S. EN 62439-1:2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 1: GENERAL CONCEPTS AND CALCULATION METHODS
I.S. EN 61850-8-1:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
IEC 62439-5:2016 Industrial communication networks - High availability automation networks - Part 5: Beacon Redundancy Protocol (BRP)
IEC 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
I.S. EN 61850-9-2:2011/A1:2020 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 (IEC 61850-9-2:2011/A1:2020)<br>
IEC 61400-25-4:2016 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
IEC 62439-6:2010 Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP)
EN 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
I.S. EN 61400-25-4:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
CEI EN 62439-5 : 2011 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 5: BEACON REDUNDANCY PROTOCOL (BRP)
IEEE 2030.100-2017 IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control System
I.S. EN 62439-4:2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 4: CROSS-NETWORK REDUNDANCY PROTOCOL (CRP) (IEC 62439-4:2010 (EQV))
I.S. EN 61850-10:2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV))
EN 62439-4:2010/A1:2012 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 4: CROSS-NETWORK REDUNDANCY PROTOCOL (CRP) (IEC 62439-4:2010/A1:2012)
IEC 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
IEC 61850-10:2012 Communication networks and systems for power utility automation - Part 10: Conformance testing

ISO/IEC 9646-7:1995 Information technology Open Systems Interconnection Conformance testing methodology and framework Part 7: Implementation Conformance Statements
IEEE 802.1Q-2014 IEEE Standard for Local and metropolitan area networks--Bridges and Bridged Networks
IEEE 802.1D-2004 IEEE Standard for Local and metropolitan area networks: Media Access Control (MAC) Bridges
IEC 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
IEC 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
IEC 61588:2009 Precision clock synchronization protocol for networked measurement and control systems
IEC 62439-1:2010+AMD1:2012+AMD2:2016 CSV Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods
IEC 62439-6:2010 Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP)
ISO/IEC 8802-2:1998 Information technology — Telecommunications and information exchange between systems — Local and metropolitan area networks — Specific requirements — Part 2: Logical link control
IEC 62439-2:2016 Industrial communication networks - High availability automation networks - Part 2: Media Redundancy Protocol (MRP)
ISO/IEC/IEEE 8802-3:2017 Information technology — Telecommunications and information exchange between systems — Local and metropolitan area networks — Specific requirements — Part 3: Standard for Ethernet
IEC 62439-7:2011 Industrial communication networks - High availability automation networks - Part 7: Ring-based Redundancy Protocol (RRP)

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.