• PD IEC/TR 61850-90-2:2016

    Current The latest, up-to-date edition.

    Communication networks and systems for power utility automation Using IEC 61850 for communication between substations and control centres

    Available format(s):  Hardcopy, PDF

    Language(s):  English

    Published date:  31-03-2016

    Publisher:  British Standards Institution

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    FOREWORD
    INTRODUCTION
    1 Scope
    2 Normative references
    3 Terms and definitions
    4 Abbreviated terms
    5 Use cases and requirements
    6 Configuration aspects
    7 Basic Communication Structure - Principles
      and models
    8 SCSM aspects - MMS and ISO/IEC 8802-3
    9 SCSM aspects - Sampled values over
      ISO/IEC 8802-3 (IEC 61850-9-2)
    Annex A (informative) - Protocol Implementation
            Conformance Statement
    Annex B (informative) - SCL syntax: XML schema
            definition
    Annex C (informative) - Substation SCD example
    Annex D (informative) - Control Centre SCD example
    Bibliography

    Abstract - (Show below) - (Hide below)

    Gives a comprehensive overview of the different aspects that need to be considered while using IEC 61850 for information exchange between substations and control or maintenance centres or other system level applications.

    Scope - (Show below) - (Hide below)

    This part of IEC 61850, which is a technical report, provides a comprehensive overview of the different aspects that need to be considered while using IEC 61850 for information exchange between substations and control or maintenance centres or other system level applications. In particular, this technical report:

    • defines use cases and communication requirements that require an information exchange between substations and control or maintenance centres

    • describes the usage of the configuration language of IEC 61850-6

    • gives guidelines for the selection of communication services and architectures compatible with IEC 61850

    • describes the engineering workflow

    • introduces the use of a Proxy/Gateway concept

    • describes the links regarding the Specific Communication Service Mapping (SCSM)

    This technical report does not define constraints or limitations for specific device implementations. There is no specific chapter for cyber security which is tackled when it is necessary. The model, for IEC TR 61850-90-2, provides security functions based upon the security threats and security functions found in IEC TS 62351-1 and IEC TS 62351-2. This technical report touches several security aspects with the following basic assumptions:

    • Information authentication and integrity (e.g. the ability to provide tamper detection) is needed

    • Confidentiality is optional

    It shall be possible to provide information authentication and integrity in an end-to-end method, regardless of information hierarchies. The typical method to provide this security function is through some type of information/message authentication code. IEC 62351-4:2007 and IEC 62351-91 describe how authentication and integrity is achieved for IEC 61850-8-1. A later version of IEC 62351-4 will provide means to ensure end-to-end data integrity through Proxy/Gateways.

    Beneath information authentication and integrity, information availability is an important aspect for telecontrol. This technical report provides redundancy architectures to enhance the availability of information in control and maintenance centres.

    The scheme shown in Figure 1 gives an overview of the connectivity and the communication paths. In particular it indicates the principle to access directly or indirectly – via the Proxy/Gateway – to an IED. An application of security controls for substation to control centre communication can be found in IEC 62351-10:2012, 6.4.3. Thus, the substation automation system has to be considered inside a perimeter of cyber security. The access is totally checked by security access points (this document does not describe such a security access point). The boundary of the electronic security perimeter is defined by the point, where the communication line leaves the perimeter of the substation over public ground. There might be more than one security access point, where separation of applications (e.g. control centre and maintenance centre) is required. When more than one client needs access to the same security access point information level access control, e.g. according to IEC TS 62351- 8:2011, may be added. IEC TS 62351-8:2011 may also be used in other cases, where different access rights are required.

    The majority of applications for which this technical report is applicable will use the services of MMS (ISO 9506) mapped to ISO/IEC 8802-3 frame formats, as described in IEC 61850-8-1:2011.

    The primary application for the use of indirect access, as described in this technical report, will be for telecontrol applications. Nevertheless this technical report does not imply that the use of a Proxy/Gateway is required for telecontrol applications. Direct access may also be used for telecontrol applications where applicable and accepted by the customer.

    General Product Information - (Show below) - (Hide below)

    Committee PEL/57
    Document Type Standard
    Publisher British Standards Institution
    Status Current

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 62351-11:2016 Power systems management and associated information exchange - Data and communications security - Part 11: Security for XML documents
    IEC 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models
    IEC 62351-9:2017 Power systems management and associated information exchange - Data and communications security - Part 9: Cyber security key management for power system equipment
    IEC 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
    IEC TR 62351-10:2012 Power systems management and associated information exchange - Data and communications security - Part 10: Security architecture guidelines
    IEC TS 62351-4:2007 Power systems management and associated information exchange - Data and communications security - Part 4: Profiles including MMS
    IEC 61850-6:2009 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs
    IEC 60870-5-104:2006+AMD1:2016 CSV Telecontrol equipment and systems - Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standardtransport profiles
    IEC 60870-5-103:1997 Telecontrol equipment and systems - Part 5-103: Transmission protocols - Companion standard for the informative interface of protection equipment
    IEC TR 61850-90-3:2016 Communication networks and systems for power utility automation - Part 90-3: Using IEC 61850 for condition monitoring diagnosis and analysis
    IEC 60870-4:1990 Telecontrol equipment and systems. Part 4: Performance requirements
    IEC TS 61850-80-4:2016 Communication networks and systems for power utility automation - Part 80-4: Translation from the COSEM object model (IEC 62056) to the IEC 61850 data model
    IEC 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
    IEC TR 61850-90-5:2012 Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118
    IEC 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
    IEC 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
    IEC 61850-4:2011 Communication networks and systems for power utility automation - Part 4: System and project management
    IEC TR 61850-7-500:2017 Communication networks and systems for power utility automation - Part 7-500: Basic information and communication structure - Use of logical nodes for modeling application functions and related concepts and guidelines for substations
    IEC TR 61850-90-17:2017 Communication networks and systems for power utility automation - Part 90-17: Using IEC 61850 to transmit power quality data
    IEC 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
    IEC 61850-7-3:2010 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes
    IEC TR 61850-90-10:2017 Communication networks and systems for power utility automation - Part 90-10: Models for scheduling
    IEC 61158-6:2003 Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 6: Application layer protocol specification
    IEC TS 61850-2:2003 Communication networks and systems in substations - Part 2: Glossary
    IEC TS 62351-8:2011 Power systems management and associated information exchange - Data and communications security - Part 8: Role-based access control
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective