SAE ARP5890A
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Guidelines for Preparing Reliability Assessment Plans for Electronic Engine Controls
29-11-2018
03-02-2011
1. SCOPE
2. REFERENCES
3. RELIABILITY ASSESSMENT PLAN FOR ELECTRONIC
ENGINE CONTROLS
4. NOTES
APPENDIX A - SIMILARITY ANALYSIS EXAMPLES
APPENDIX B - DURABILITY ANALYSIS
APPENDIX C - OTHER SOURCES OF INFORMATION
Specifies guidelines for a Reliability Assessment Plan (herein also called the Plan), in which Electronic Engine Control manufacturers document their controlled, repeatable processes for assessing reliability of their products.
DocumentType |
Standard
|
PublisherName |
SAE International
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
This document establishes guidelines for a Reliability Assessment Plan (herein also called the Plan), in which Electronic Engine Control manufacturers document their controlled, repeatable processes for assessing reliability of their products. Each Electronic Engine Control manufacturer (the Plan owner) prepares a Plan, which is unique to the Plan owner.This document describes processes that are intended for use in assessing the reliability of Electronic Engine Controls, or subassemblies thereof. The results of such assessments are intended for use as inputs to safety analyses, certification analyses, equipment design decisions, system architecture selection and business decisions such as warranties or maintenance cost guarantees.This Guide may be used to prepare plans for reliability assessment of electronic engine controls in which, typically, the impact of failure is high, the operating environment can be relatively severe and the opportunity to improve the equipment after the start of production is limited. In this and similar industries, accurate estimates of expected equipment reliability are necessary prior to the start of production. This guide was initially produced in response to the recognized need for alternative reliability assessment and prediction methods in the wake of the decline in the availability of mil-spec parts and the declining use of military specifications and handbooks.Since the original publication of this document, a more advanced approach to handbook prediction has been developed, re-introducing this assessment method as a more viable option. This re-issue describes recent handbook advances while also highlighting a number of emerging reliability risks resulting from advances in electronic component development.The approach to reliability assessment in this Guide:Encourages the equipment manufacturer (the Plan owner) to consider all relevant information regarding equipment reliability which may include the effects of design and manufacturing process as well as component selection issues. This is in contrast to more traditional methods that focus on component reliability as the most significant contributor to the equipment reliability.Encourages the equipment manufacturer to define and use the processes that are most effective for the manufacturer’s own equipment. This guide does not attempt to prescribe a set of acceptable data, algorithms, methods, or equations to be used in reliability assessment, but rather to provide a ‘toolbox’ of complementary assessment methodologies based upon a number of current practices.Describes a continuous process, in which a reliability assessment can be updated as more information becomes available during the equipment life cycle. This information may be used to improve both the reliability of the equipment and the effectiveness of the assessment process.Reliability assessment results should be viewed as objective evidence that it is expected the product reliability requirements and goals will be satisfied, by the proposed design. As such, they may be used, for example, to authorize advancement to the next step in product development, or to authorize progress payments, or to proceed with delivery and acceptance of products. Reliability assessment results should never be used to support a claim that the reliability requirements, goals, or expectations have been satisfied, in the face of clear evidence to the contrary from in-service experience.Traditional approaches to reliability assessment, including Handbook Predictions and Durability Analysis described herein, primarily address unreliability resulting from hardware defects within the equipment. It is not the intention of the ARP to provide methods and processes to specifically address software and system reliability issues but it is recognized that system and software design errors contribute to product unreliability and that the use of Similarity Analysis, for instance, can encompass these sources of unreliability.This SAE Aerospace Recommended (ARP) Practice is intended as a guide towards standard practice and is subject to change to keep pace with experience and technical advances.
IEC TS 62239-2:2017 | Process management for avionics - Management plan - Part 2: Preparation and maintenance of an electronic COTS assembly management plan |
SAE ARP6379 | Processes for Application-Specific Qualification of Electrical, Electronic, and Electromechanical Parts and Sub-Assemblies for Use in Aerospace, Defense, and High Performance Systems |
EN 62308 : 2006 | EQUIPMENT RELIABILITY - RELIABILITY ASSESSMENT METHODS |
MIL STD 11991 : A | GENERAL STANDARD FOR PARTS, MATERIALS, AND PROCESSES |
BS EN 62308:2006 | Equipment reliability. Reliability assessment methods |
EIA STD 4899 : 2017-05 | REQUIREMENTS FOR AN ELECTRONIC COMPONENTS MANAGEMENT PLAN |
EIA 933 : 2015 | REQUIREMENTS FOR A COTS ASSEMBLY MANAGEMENT PLAN |
PD IEC/TS 62239-2:2017 | Process management for avionics. Management plan Preparation and maintenance of an electronic COTS assembly management plan |
04/30101075 DC : DRAFT JUN 2004 | |
I.S. EN 62308:2006 | EQUIPMENT RELIABILITY - RELIABILITY ASSESSMENT METHODS |
IEC 62308:2006 | Equipment reliability - Reliability assessment methods |
IEC TS 62239-2:2017 | Process management for avionics - Management plan - Part 2: Preparation and maintenance of an electronic COTS assembly management plan |
SAE ARP6379 | Processes for Application-Specific Qualification of Electrical, Electronic, and Electromechanical Parts and Sub-Assemblies for Use in Aerospace, Defense, and High Performance Systems |
GEIA HB 0005-2 : 2007 | TECHNICAL GUIDELINES FOR AEROSPACE AND HIGH PERFORMANCE ELECTRONIC SYSTEMS CONTAINING LEAD-FREE SOLDER AND FINISHES |
MIL-HDBK-87244 Base Document:1995 | AVIONICS/ELECTRONICS INTEGRITY |
SAE ARP4754A | Guidelines for Development of Civil Aircraft and Systems |
IEEE 1413 : 2010 | FRAMEWORK FOR RELIABILITY PREDICTION OF HARDWARE |
IEC TS 62239-1:2015 | Process management for avionics - Management plan - Part 1: Preparation and maintenance of an electronic components management plan |
SAE ARP4761 | GUIDELINES AND METHODS FOR CONDUCTING THE SAFETY ASSESSMENT PROCESS ON CIVIL AIRBORNE SYSTEMS AND EQUIPMENT |
VITA 51.1 : 2008 (R2013) | RELIABILITY PREDICTION MIL-HDBK-217 SUBSIDIARY SPECIFICATION |
GEIA STD 0005-2 : 2012 | MITIGATING THE EFFECTS OF TIN WHISKERS IN AEROSPACE AND HIGH PERFORMANCE ELECTRONIC SYSTEMS |
SAE ARP6338 | Process for Assessment and Mitigation of Early Wearout of Life-limited Microcircuits |
MIL-HDBK-217 Revision F:1991 | RELIABILITY PREDICTION OF ELECTRONIC EQUIPMENT |
IEC 61709:2017 | Electric components - Reliability - Reference conditions for failure rates and stress models for conversion |
GEIA STD 0005-1 : 2012 | PERFORMANCE STANDARD FOR AEROSPACE AND HIGH PERFORMANCE ELECTRONIC SYSTEMS CONTAINING LEAD-FREE SOLDER |
UTEC 80 811 : 2011 | RELIABILITY METHODOLOGY FOR ELECTRONIC SYSTEMS - FIDES GUIDE 2009 ISSUE A |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.