BS EN 12952-5:2011
Superseded
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Water-tube boilers and auxiliary installations Workmanship and construction of pressure parts of the boiler
Available format(s)
Hardcopy , PDF
Superseded date
03-02-2022
Superseded by
Language(s)
English
Published date
30-11-2011
Publisher
Committee |
PVE/2
|
DevelopmentNote |
Supersedes 97/711225 DC (03/2002) Together with BS EN 12952-1, BS EN 12952-2, BS EN 12952-3, BS EN 12952-6, BS EN 12952-7, BS EN 12952-10 and BS EN 12952-11, it supersedes BS 1113(1999) which remains current and inactive for new design. (01/2010) Supersedes 08/30184309 DC. (11/2011)
|
DocumentType |
Standard
|
ISBN |
9780580635557
|
Pages |
92
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
Standards | Relationship |
ONORM EN 12952-5 : 2011 | Identical |
NF EN 12952-5 : 2011 | Identical |
DIN EN 12952-5:2012-01 | Identical |
I.S. EN 12952-5:2011 | Identical |
UNI EN 12952-5 : 2011 | Identical |
SN EN 12952-5 : 2012 | Identical |
NEN EN 12952-5 : 2011 | Identical |
NS EN 12952-5 : 2011 | Identical |
UNE-EN 12952-5:2012 | Identical |
NBN EN 12952-5 : 2011 | Identical |
EN 12952-5:2011 | Identical |
DEFSTAN 02-348/2(2008) : 2008 | GUIDE TO THE DESIGN, CORROSION ASSESSMENT AND STRESS ANALYSIS OF STEAM SYSTEMS PIPEWORK |
ISO/TR 20172:2009 | Welding Grouping systems for materials European materials |
ISO 14555:2017 | Welding — Arc stud welding of metallic materials |
EN ISO 9692-1:2013 | Welding and allied processes - Types of joint preparation - Part 1: Manual metal arc welding, gas-shielded metal arc welding, gas welding, TIG welding and beam welding of steels (ISO 9692-1:2013) |
EN ISO 6520-1:2007 | Welding and allied processes - Classification of geometric imperfections in metallic materials - Part 1: Fusion welding (ISO 6520-1:2007) |
EN ISO 17663:2009 | Welding - Quality requirements for heat treatment in connection with welding and allied processes (ISO 17663:2009) |
EN ISO 3834-3:2005 | Quality requirements for fusion welding of metallic materials - Part 3: Standard quality requirements (ISO 3834-3:2005) |
EN ISO 5817:2014 | Welding - Fusion-welded joints in steel, nickel, titanium and their alloys (beam welding excluded) - Quality levels for imperfections (ISO 5817:2014) |
ISO 6520-1:2007 | Welding and allied processes Classification of geometric imperfections in metallic materials Part 1: Fusion welding |
EN ISO 3834-2:2005 | Quality requirements for fusion welding of metallic materials - Part 2: Comprehensive quality requirements (ISO 3834-2:2005) |
ISO 8501-1:2007 | Preparation of steel substrates before application of paints and related products — Visual assessment of surface cleanliness — Part 1: Rust grades and preparation grades of uncoated steel substrates and of steel substrates after overall removal of previous coatings |
EN 1708-1:2010 | Welding - Basic welded joint details in steel - Part 1: Pressurized components |
ISO 23277:2015 | Non-destructive testing of welds Penetrant testing Acceptance levels |
EN ISO 15613:2004 | Specification and qualification of welding procedures for metallic materials - Qualification based on pre-production welding test (ISO 15613:2004) |
EN ISO 6892-1:2016 | Metallic materials - Tensile testing - Part 1: Method of test at room temperature (ISO 6892-1:2016) |
ISO 4759-1:2000 | Tolerances for fasteners — Part 1: Bolts, screws, studs and nuts — Product grades A, B and C |
EN 1759-1:2004 | Flanges and their joint - Circular flanges for pipes, valves, fittings and accessories, Class designated - Part 1: Steel flanges, NPS 1/2 to 24 |
ISO/TR 15608:2017 | Welding — Guidelines for a metallic materials grouping system |
ISO 6892-1:2016 | Metallic materials Tensile testing Part 1: Method of test at room temperature |
EN 1011-1:2009 | Welding - Recommendations for welding of metallic materials - Part 1: General guidance for arc welding |
EN 12952-3:2011 | Water-tube boilers and auxiliary installations - Part 3: Design and calculation for pressure parts of the boiler |
ISO 14731:2006 | Welding coordination Tasks and responsibilities |
EN 12952-4:2011 | Water-tube boilers and auxiliary installations - Part 4: In-service boiler life expectancy calculations |
ISO 17663:2009 | Welding — Quality requirements for heat treatment in connection with welding and allied processes |
EN ISO 4063:2010 | Welding and allied processes - Nomenclature of processes and reference numbers (ISO 4063:2009, Corrected version 2010-03-01) |
EN ISO 23278 : 2015 | NON-DESTRUCTIVE TESTING OF WELDS - MAGNETIC PARTICLE TESTING - ACCEPTANCE LEVELS (ISO 23278:2015) |
EN ISO 23277:2015 | Non-destructive testing of welds - Penetrant testing - Acceptance levels (ISO 23277:2015) |
EN 10216-2:2013 | Seamless steel tubes for pressure purposes - Technical delivery conditions - Part 2: Non-alloy and alloy steel tubes with specified elevated temperature properties |
EN 473:2008 | Non-destructive testing - Qualification and certification of NDT personnel - General principles |
ISO 23278:2015 | Non-destructive testing of welds Magnetic particle testing Acceptance levels |
EN 12952-7:2012 | Water-tube boilers and auxiliary installations - Part 7: Requirements for equipment for the boiler |
EN 10028-2:2017 | Flat products made of steels for pressure purposes - Part 2: Non-alloy and alloy steels with specified elevated temperature properties |
ISO 148-1:2016 | Metallic materials — Charpy pendulum impact test — Part 1: Test method |
EN 12952-1:2015 | Water-tube boilers and auxiliary installations - Part 1: General |
ISO 5817:2014 | Welding — Fusion-welded joints in steel, nickel, titanium and their alloys (beam welding excluded) — Quality levels for imperfections |
ISO 9692-1:2013 | Welding and allied processes — Types of joint preparation — Part 1: Manual metal arc welding, gas-shielded metal arc welding, gas welding, TIG welding and beam welding of steels |
ISO 15614-1:2017 | Specification and qualification of welding procedures for metallic materials — Welding procedure test — Part 1: Arc and gas welding of steels and arc welding of nickel and nickel alloys |
EN ISO 4759-1:2000 | Tolerances for fasteners - Part 1: Bolts, screws, studs and nuts - Product grades A, B and C (ISO 4759-1:2000) |
ISO 3834-2:2005 | Quality requirements for fusion welding of metallic materials Part 2: Comprehensive quality requirements |
EN ISO 9001:2015 | Quality management systems - Requirements (ISO 9001:2015) |
EN ISO 14731:2006 | Welding coordination - Tasks and responsibilities (ISO 14731:2006) |
EN 10204:2004 | Metallic products - Types of inspection documents |
CEN ISO/TR 15608:2017 | Welding - Guidelines for a metallic materials grouping system (ISO/TR 15608:2017) |
ISO 9001:2015 | Quality management systems — Requirements |
ISO 9000:2015 | Quality management systems — Fundamentals and vocabulary |
ISO 9692-2:1998 | Welding and allied processes — Joint preparation — Part 2: Submerged arc welding of steels |
EN ISO 8501-1:2007 | Preparation of steel substrates before application of paints and related products - Visual assessment of surface cleanliness - Part 1: Rust grades and preparation grades of uncoated steel substrates and of steel substrates after overall removal of previous coatings (ISO 8501-1:2007) |
ISO 15613:2004 | Specification and qualification of welding procedures for metallic materials Qualification based on pre-production welding test |
EN ISO 148-1:2016 | Metallic materials - Charpy pendulum impact test - Part 1: Test method (ISO 148-1:2016) |
ISO 4063:2009 | Welding and allied processes — Nomenclature of processes and reference numbers |
EN ISO 14555:2017 | Welding - Arc stud welding of metallic materials (ISO 14555:2017) |
EN 571-1:1997 | Non destructive testing - Penetrant testing - Part 1: General principles |
EN ISO 17638:2016 | Non-destructive testing of welds - Magnetic particle testing (ISO 17638:2016) |
EN 1418:1997 | Welding personnel - Approval testing of welding operators for fusion welding and resistance weld setters for fully mechanized and automatic welding of metallic materials |
ISO 13916:2017 | Welding — Measurement of preheating temperature, interpass temperature and preheat maintenance temperature |
EN 12952-2:2011 | Water-tube boilers and auxiliary installations - Part 2: Materials for pressure parts of boilers and accessories |
CEN ISO/TR 20172:2009 | Welding - Grouping systems for materials - European materials (ISO/TR 20172:2009) |
ISO 17638:2016 | Non-destructive testing of welds Magnetic particle testing |
ISO 3834-3:2005 | Quality requirements for fusion welding of metallic materials Part 3: Standard quality requirements |
EN ISO 9000:2015 | Quality management systems - Fundamentals and vocabulary (ISO 9000:2015) |
EN 10253-2:2007 | Butt-welding pipe fittings - Part 2: Non alloy and ferritic alloy steels with specific inspection requirements |
1997/23/EC : 1997 | DIRECTIVE 97/23/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL OF 29 MAY 1997 ON THE APPROXIMATION OF THE LAWS OF THE MEMBER STATES CONCERNING PRESSURE EQUIPMENT |
EN 1708-2:2000 | Welding - Basic weld joint details in steel - Part 2: Non internal pressurized components |
EN 287-1:2011 | Qualification test of welders - Fusion welding - Part 1: Steels |
EN 12952-6:2011 | Water-tube boilers and auxiliary installations - Part 6: Inspection during construction; documentation and marking of pressure parts of the boiler |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.