EN 61850-5:2013
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models
06-06-2022
03-05-2013
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviations
5 Power utility automation functions
6 Goal and requirements
7 Categories of functions
8 Function description and function requirements
9 The application concept for logical nodes
10 System description and system requirements
11 Performance requirements
12 Additional requirements for the data model
Annex A (informative) - Logical nodes and related
PICOMs
Annex B (informative) - PICOM identification and
message classification
Annex C (informative) - Communication optimization
Annex D (informative) - Rules for function definition
Annex E (informative) - Interaction of functions and
logical nodes
Annex F (informative) - Functions
Annex G (informative) - Results from function description
Annex H (informative) - Substation configurations
Annex I (informative) - Examples for protection functions
in compensated networks
Bibliography
Annex ZA (normative) - Normative references to international
publications with their corresponding European
publications
IEC 61850-5:2013 applies to power utility automation systems with the core part of substation automation systems (SAS); it standardizes the communication between intelligent electronic devices (IEDs) and defines the related system requirements to be supported. The major technical changes with regard to the previous edition are as follows: - extension from substation automation systems to utility automation systems; - inclusion of interfaces for communication between substations; - requirements from communication beyond the boundary of the substation.
Committee |
CLC/TC 57
|
DocumentType |
Standard
|
PublisherName |
European Committee for Standards - Electrical
|
Status |
Superseded
|
Standards | Relationship |
PN EN 61850-5 : 2013 | Identical |
SN EN 61850-5 : 2003 | Identical |
I.S. EN 61850-5:2013 | Identical |
NEN EN IEC 61850-5 : 2013 | Identical |
CEI EN 61850-5 : 2013 | Identical |
IEC 61850-5:2013 | Identical |
NBN EN 61850-5 : 2013 | Identical |
UNE-EN 61850-5:2013 | Identical |
NF EN 61850-5 : 2013 | Identical |
DIN EN 61850-5:2014-06 | Identical |
BS EN 61850-5:2013 | Identical |
SN EN 61850-5:2013 | Identical |
I.S. EN 61850-7-2:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
BS EN 61850-6:2010 | Communication networks and systems for power utility automation Configuration description language for communication in electrical substations related to IEDs |
CEI EN 61850-7-2 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
CEI EN 61850-8-1 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
EN 61850-10:2013 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
EN 62271-3:2015 | High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
EN 61850-6:2010 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
I.S. EN 61400-25-2:2015 | WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
I.S. EN 62271-3:2015 | HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
BS EN 61400-25-2:2015 | Wind turbines Communications for monitoring and control of wind power plants - Information models |
BS EN 62271-3:2015 | High-voltage switchgear and controlgear Digital interfaces based on IEC 61850 |
BS EN 61850-7-4:2010 | Communication networks and systems for power utility automation Basic communication structure. Compatible logical node classes and data object classes |
BS EN 61850-7-1:2011 | Communication networks and systems for power utility automation Basic communication structure. Principles and models |
I.S. EN 61850-6:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
I.S. EN 61850-7-4:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
CEI EN 61850-7-4 : 2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
EN 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
EN 61850-7-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011) |
CEI EN 61850-7-1 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS |
BS EN 61850-7-2:2010 | Communication networks and systems for power utility automation Basic information and communication structure. Abstract communication service interface (ACSI) |
BS EN 61850-10:2013 | Communication networks and systems for power utility automation Conformance testing |
I.S. EN 61850-8-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
I.S. EN 61850-7-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011 (EQV)) |
EN 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
EN 61850-7-2:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
BS EN 61850-8-1:2011 | Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
CEI EN 61850-6 : 2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
I.S. EN 61850-10:2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV)) |
EN 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
EN 61850-6:2010 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEC 60870-4:1990 | Telecontrol equipment and systems. Part 4: Performance requirements |
IEC TR 61850-1:2013 | Communication networks and systems for power utility automation - Part 1: Introduction and overview |
IEC 60834-2:1993 | Performance and testing of teleprotection equipment of power systems - Part 2: Analogue comparison systems |
IEC 61850-7-1:2011 | Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
IEC TR 61850-90-1:2010 | Communication networks and systems for power utility automation - Part 90-1: Use of IEC 61850 for the communication between substations |
IEC 61000-4-15:2010 | Electromagnetic compatibility (EMC) - Part 4-15: Testing and measurement techniques - Flickermeter - Functional and design specifications |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 61850-7-3:2010 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC TR 61850-7-510:2012 | Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines |
IEC 61850-10:2012 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEC TS 61850-2:2003 | Communication networks and systems in substations - Part 2: Glossary |
EN 61000-4-15:2011 | Electromagnetic compatibility (EMC) - Part 4-15: Testing and measurement techniques - Flickermeter - Functional and design specifications |
IEC 61850-3:2013 | Communication networks and systems for power utility automation - Part 3: General requirements |
IEC 60834-1:1999 | Teleprotection equipment of power systems - Performance and testing - Part 1: Command systems |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.