IEEE 2030.100-2017
Current
The latest, up-to-date edition.
IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control System
Hardcopy , PDF
English
19-06-2017
1. Overview
2. Definitions, acronyms, and abbreviations
3. What IEC 61850 offers
4. User considerations
5. Critical success factors
Annex A (informative) - Examples for future
2030.100 Project Authorization Request
(PAR)s
Annex B (informative) - Bibliography
This recommended practice outlines the necessary steps and procedures implementers of IEC 61850 in substations should undertake in a multi-vendor equipment environment.
Committee |
Power System Relaying and Control
|
DocumentType |
Standard
|
ISBN |
978-1-5044-4032-5
|
Pages |
67
|
PublisherName |
Institute of Electrical & Electronics Engineers
|
Status |
Current
|
IEEE 1613.1-2013 | IEEE Standard Environmental and Testing Requirements for Communications Networking Devices Installed in Transmission and Distribution Facilities |
IEEE C37.90-2005 | IEEE Standard for Relays and Relay Systems Associated with Electric Power Apparatus |
IEC 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
IEEE 525-2007 | IEEE Guide for the Design and Installation of Cable Systems in Substations |
IEEE 1615-2007 | IEEE Recommended Practice for Network Communication in Electric Power Substations |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
IEC 61850-7-410:2012+AMD1:2015 CSV | Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control |
IEEE C37.118-2005 | IEEE Standard for Synchrophasors for Power Systems |
IEC 62439-3:2016 | Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR) |
IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEEE 802.3-2012 | IEEE Standard for Ethernet |
IEC 60870-5-104:2006+AMD1:2016 CSV | Telecontrol equipment and systems - Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standardtransport profiles |
IEC 81346-1:2009 | Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 1: Basic rules |
IEC TR 61850-90-2:2016 | Communication networks and systems for power utility automation - Part 90-2: Using IEC 61850 for communication between substations and control centres |
IEC 62381:2012 | Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) |
IEEE 1815.1-2015 | IEEE Standard for Exchanging Information Between Networks Implementing IEC 61850 and IEEE Std 1815(TM) [Distributed Network Protocol (DNP3)] |
IEC TR 61850-1:2013 | Communication networks and systems for power utility automation - Part 1: Introduction and overview |
IEC 81346-2:2009 | Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 2: Classification of objects and codes for classes |
IEEE C37.240-2014 | IEEE Standard Cybersecurity Requirements for Substation Automation, Protection, and Control Systems |
IEC 60870-5-101:2003+AMD1:2015 CSV | Telecontrol equipment and systems - Part 5-101: Transmissionprotocols - Companion standard for basic telecontrol tasks |
IEC 61850-7-1:2011 | Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
IEC TR 61850-90-1:2010 | Communication networks and systems for power utility automation - Part 90-1: Use of IEC 61850 for the communication between substations |
IEC 62271-3:2015 | High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
IEC TR 61850-90-5:2012 | Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118 |
IEC 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
IEC 60255-27:2013 | Measuring relays and protection equipment - Part 27: Product safety requirements |
IEC 61850-4:2011 | Communication networks and systems for power utility automation - Part 4: System and project management |
IEC 61588:2009 | Precision clock synchronization protocol for networked measurement and control systems |
IEC 61850-7-420:2009 | Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
IEEE 1686-2013 | IEEE Standard for Intelligent Electronic Devices Cyber Security Capabilities |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 61850-7-3:2010 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC 62439-1:2010+AMD1:2012+AMD2:2016 CSV | Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods |
IEC TS 61850-80-1:2016 | Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
IEC TR 61850-90-7:2013 | Communication networks and systems for power utility automation - Part 90-7: Object models for power converters in distributed energy resources (DER) systems |
IEC TR 61850-7-510:2012 | Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines |
IEC 61850-10:2012 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEEE 1588-2008 REDLINE | IEEE Standard for a Precision Clock Synchronization Protocol for Networked Measurement and Control Systems |
IEEE 1815-2012 REDLINE | IEEE Standard for Electric Power Systems Communications-Distributed Network Protocol (DNP3) |
IEC TS 61850-2:2003 | Communication networks and systems in substations - Part 2: Glossary |
IEC 61850-3:2013 | Communication networks and systems for power utility automation - Part 3: General requirements |
IEEE 802.1W : 2001 | LOCAL AND METROPOLITAN AREA NETWORKS - COMMON SPECIFICATIONS - PART 3: MEDIA ACCESS CONTROL (MAC) BRIDGE - AMENDMENT 2: RAPID RECONFIGURATION |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.