UIC 541-3 : 8ED 2017
Current
Current
The latest, up-to-date edition.
BRAKES - DISC BRAKES AND THEIR APPLICATION - GENERAL CONDITIONS FOR THE APPROVAL OF BRAKE PADS
Published date
12-01-2013
Publisher
Sorry this product is not available in your region.
Explains the UIC railways technical requirements for disc brakes, in particular for the brake pads used on disc brakes.
| DocumentType |
Standard
|
| PublisherName |
Union Internationale des Chemins de Fer
|
| Status |
Current
|
| 08/30189631 DC : DRAFT SEP 2008 | BS EN 50215 - RAILWAY APPLICATIONS - ROLLING STOCK - TESTING OF ROLLING STOCK ON COMPLETION OF CONSTRUCTION AND BEFORE ENTRY INTO SERVICE |
| I.S. EN 16185-1:2014 | RAILWAY APPLICATIONS - BRAKING SYSTEMS OF MULTIPLE UNIT TRAINS - PART 1: REQUIREMENTS AND DEFINITIONS |
| I.S. EN 16452:2015+A1:2019 | RAILWAY APPLICATIONS - BRAKING - BRAKE BLOCKS |
| CEI EN 50215 : 2011 | RAILWAY APPLICATIONS - ROLLING STOCK - TESTING OF ROLLING STOCK ON COMPLETION OF CONSTRUCTION AND BEFORE ENTRY INTO SERVICE |
| DIN EN 15179:2010-12 | Railway applications - Braking - Requirements for the brake system of coaches |
| IEC 61133:2016 RLV | Railway applications - Rolling stock - Testing of rolling stock on completion of construction and before entry into service |
| BS EN 14531-6:2009 | Railway applications. Methods for calculation of stopping and slowing distances and immobilization braking Step by step calculations for train sets or single vehicles |
| PREN 14531-2 : DRAFT 2012 | RAILWAY APPLICATIONS - METHODS FOR CALCULATION OF STOPPING AND SLOWING DISTANCES AND IMMOBILISATION BRAKING - PART 2: STEP BY STEP CALCULATION FOR TRAIN SETS OR SINGLE VEHICLES |
| BS EN 50215:2009 | Railway applications — Rolling stock — Testing of rolling stock on completion of construction and before entry into service |
| 14/30270317 DC : 0 | BS EN 14198 - RAILWAY APPLICATIONS - BRAKING - REQUIREMENTS FOR THE BRAKE SYSTEM OF TRAINS FOR GENERAL OPERATION |
| BS EN 14198 : 2016 | RAILWAY APPLICATIONS - BRAKING - REQUIREMENTS FOR THE BRAKE SYSTEM OF TRAINS HAULED BY LOCOMOTIVES |
| PREN 14531-1 : DRAFT 2012 | RAILWAY APPLICATIONS - METHODS FOR CALCULATION OF STOPPING AND SLOWING DISTANCES AND IMMOBILISATION BRAKING - PART 1: GENERAL ALGORITHMS UTILIZING MEAN VALUE CALCULATION FOR TRAIN SETS OR SINGLE VEHICLES |
| I.S. EN 50215:2009 | RAILWAY APPLICATIONS - ROLLING STOCK - TESTING OF ROLLING STOCK ON COMPLETION OF CONSTRUCTION AND BEFORE ENTRY INTO SERVICE |
| I.S. EN 14198:2016 | RAILWAY APPLICATIONS - BRAKING - REQUIREMENTS FOR THE BRAKE SYSTEM OF TRAINS HAULED BY LOCOMOTIVES |
| EN 14198:2016 | Railway applications - Braking - Requirements for the brake system of trains hauled by locomotives |
| PREN 14198 : DRAFT 2014 | RAILWAY APPLICATIONS - BRAKING - REQUIREMENTS FOR THE BRAKE SYSTEM OF TRAINS FOR GENERAL OPERATION |
| 12/30263252 DC : 0 | BS EN 14531-1 - RAILWAY APPLICATIONS - METHODS FOR CALCULATION OF STOPPING AND SLOWING DISTANCES AND IMMOBILISATION BRAKING - PART 1: GENERAL ALGORITHMS UTILIZING MEAN VALUE CALCULATION FOR TRAIN SETS OR SINGLE VEHICLES |
| 16/30344372 DC : 0 | BS EN 14531-1:2015 AMD 1:2016 - RAILWAY APPLICATIONS - METHODS FOR CALCULATION OF STOPPING AND SLOWING DISTANCES AND IMMOBILIZATION BRAKING - PART 1: GENERAL ALGORITHMS UTILIZING MEAN VALUE CALCULATION FOR TRAIN SETS OR SINGLE VEHICLES |
| 05/19984709 DC : DRAFT MAR 2005 | EN 15179 - RAILWAY APPLICATIONS - BRAKING - REQUIREMENTS FOR THE BRAKE SYSTEM OF PASSENGER COACHES |
| 07/30156919 DC : DRAFT AUG 2007 | BS EN 14531-6 - RAILWAY APPLICATIONS - METHODS FOR CALCULATION OF STOPPING AND SLOWING DISTANCES AND IMMOBILIZATION BRAKING - PART 6: HIGH SPEED TRAINS |
| BS EN 16452:2015+A1:2019 | Railway applications. Braking. Brake blocks |
| IEC TR 61375-2-7:2014 | Electronic railway equipment - Train communication network (TCN) - Part 2-7: Wireless Train Backbone (WLTB) |
| EN 16185-1:2014 | Railway applications - Braking systems of multiple unit trains - Part 1: Requirements and definitions |
| DIN EN 14198:2017-03 | RAILWAY APPLICATIONS - BRAKING - REQUIREMENTS FOR THE BRAKE SYSTEM OF TRAINS HAULED BY LOCOMOTIVES |
| EN 15179:2007 | Railway applications - Braking - Requirements for the brake system of coaches |
| 12/30156938 DC : 0 | BS EN 16452 - RAILWAY APPLICATIONS - BRAKING - BRAKE BLOCKS |
| BS EN 16185-1:2014 | Railway applications. Braking systems of multiple unit trains Requirements and definitions |
| 03/317142 DC : 0 | PREN 14033-1 - RAILWAY APPLICATIONS - TRACK - TECHNICAL REQUIREMENTS FOR RAILBOUND CONSTRUCTION AND MAINTENANCE MACHINES - PART 1: RUNNING OF RAILBOUND MACHINES |
| 05/30086725 DC : 0 | EN 15328 - RAILWAY APPLICATIONS - BRAKING - BRAKE PADS |
| EN 16452:2015 | Railway applications - Braking - Brake blocks |
| BS EN 15179:2007 | Railway applications. Braking. Requirements for the brake system of coaches |
| EN 14531-6:2009 | Railway applications - Methods for calculation of stopping and slowing distances and immobilisation braking - Part 6: Step by step calculations for train sets or single vehicles |
| 12/30250646 DC : 0 | BS EN 14531-2 - RAILWAY APPLICATIONS - METHODS FOR CALCULATION OF STOPPING AND SLOWING DISTANCES AND IMMOBILISATION BRAKING - PART 2: STEP BY STEP CALCULATION FOR TRAIN SETS OR SINGLE VEHICLES |
| DIN EN 14531-6:2009-12 | RAILWAY APPLICATIONS - METHODS FOR CALCULATION OF STOPPING AND SLOWING DISTANCES AND IMMOBILISATION BRAKING - PART 6: STEP BY STEP CALCULATIONS FOR TRAIN SETS OR SINGLE VEHICLES |
| PD IEC/TR 61375-2-7:2014 | Electronic railway equipment. Train communication network (TCN) Wireless Train Backbone (WLTB) |
| I.S. EN 14531-6:2009 | RAILWAY APPLICATIONS - METHODS FOR CALCULATION OF STOPPING AND SLOWING DISTANCES AND IMMOBILISATION BRAKING - PART 6: STEP BY STEP CALCULATIONS FOR TRAIN SETS OR SINGLE VEHICLES |
| DIN EN 14198:2015-01 (Draft) | RAILWAY APPLICATIONS - BRAKING - REQUIREMENTS FOR THE BRAKE SYSTEM OF TRAINS HAULED BY LOCOMOTIVES |
| 15/30241391 DC : 0 | BS EN 16834 - RAILWAY APPLICATIONS - BRAKING - BRAKE PERFORMANCE |
| IEC 61133:2016 | Railway applications - Rolling stock - Testing of rolling stock on completion of construction and before entry into service |
| DIN EN 16452:2019-06 | Railway applications - Braking - Brake blocks (includes Amendment :2019) |
| DIN EN 16185-1:2015-03 | RAILWAY APPLICATIONS - BRAKING SYSTEMS OF MULTIPLE UNIT TRAINS - PART 1: REQUIREMENTS AND DEFINITIONS |
| EN 50215:2009 | Railway applications - Rolling stock - Testing of rolling stock on completion of construction and before entry into service |
| DIN EN 16452:2015-11 | RAILWAY APPLICATIONS - BRAKING - BRAKE BLOCKS |
| UNE-EN 14531-6:2010 | Railway applications - Methods for calculation of stopping and slowing distances and immobilisation braking - Part 6: Step by step calculations for train sets or single vehicles |
| UNE-EN 16452:2016 | Railway applications - Braking - Brake blocks |
| UNE-EN 16185-1:2015 | Railway applications - Braking systems of multiple unit trains - Part 1: Requirements and definitions |
Summarise
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.
Sorry this product is not available in your region.