• Shopping Cart
    There are no items in your cart

EN 50518-2:2013

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Monitoring and alarm receiving centre - Part 2: Technical requirements

Published date

08-11-2013

Superseded date

25-01-2022

Superseded by

EN 50518:2019

Sorry this product is not available in your region.

Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Performance requirements
5 Communication requirements
6 Reception of signals
7 Testing
8 Data
9 Data storage
10 Availability and verification of performance of
   the ARC
11 Contingency plan
Annex A (normative) - ARC availability calculations
Bibliography

This part of EN 50518 specifies the technical requirements of an ARC. This also includes functional performance criteria and verification of performance. This part of EN 50518 is to be read in conjunction with Part 1 and Part 3, and cannot be used separately.

Committee
CLC/TC 79
DevelopmentNote
Supersedes PREN 50518-2. (08/2011) To be read in conjunction with EN 50518-1 and EN 50518-3. (11/2013)
DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Superseded
SupersededBy
Supersedes

CEI UNI EN 50518-1 : 2015 MONITORING AND ALARM RECEIVING CENTRE - PART 1: LOCATION AND CONSTRUCTION REQUIREMENTS
I.S. EN 50134-7:2017 ALARM SYSTEMS - SOCIAL ALARM SYSTEMS - PART 7: APPLICATION GUIDELINES
BS EN 50134-7:2017 Alarm systems. Social alarm systems Application guidelines
EN 50134-7:2017 Alarm systems - Social alarm systems - Part 7: Application guidelines
EN 50518-3:2013 Monitoring and alarm receiving centre - Part 3: Procedures and requirements for operation
EN 50518-1:2013 Monitoring and alarm receiving centre - Part 1: Location and construction requirements
BS EN 50518-1:2013 Monitoring and alarm receiving centre Location and construction requirements
15/30325557 DC : 0 BS EN 50134-7 - ALARM SYSTEMS - SOCIAL ALARM SYSTEMS - PART 7: APPLICATION GUIDELINES
PREN 50134-7 : DRAFT 2015 ALARM SYSTEMS - SOCIAL ALARM SYSTEMS - PART 7: APPLICATION GUIDELINES
BS EN 50518-3:2013 Monitoring and alarm receiving centre Procedures and requirements for operation
CEI UNI EN 50518-3 : 2015 MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION
I.S. EN 50518-3:2013 MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION
I.S. EN 50518-1:2013 MONITORING AND ALARM RECEIVING CENTRE - PART 1: LOCATION AND CONSTRUCTION REQUIREMENTS
UNE-EN 50134-7:2017 Alarm systems - Social alarm systems - Part 7: Application guidelines
UNE-EN 50518-3:2013 Monitoring and alarm receiving centre - Part 3: Procedures and requirements for operation
UNE-EN 50518-1:2014 Monitoring and alarm receiving centre - Part 1: Location and construction requirements

EN 50518-1:2013 Monitoring and alarm receiving centre - Part 1: Location and construction requirements
EN 50136-1:2012 Alarm systems - Alarm transmission systems and equipment - Part 1: General requirements for alarm transmission systems
EN 50518-3:2013 Monitoring and alarm receiving centre - Part 3: Procedures and requirements for operation
CLC/TS 50136-4:2004 Alarm systems - Alarm transmission systems and equipment - Part 4: Annunciation equipment used in alarm receiving centres
EN 50131-1:2006/A2:2017 ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 1: SYSTEM REQUIREMENTS

Access your standards online with a subscription

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Sorry this product is not available in your region.