07/30168422 DC : 0
|
BS EN 61850-8-1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
BS EN 62271-3:2015
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
07/30166751 DC : 0
|
BS EN 61850-7-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
PD IEC/TR 61850-7-510:2012
|
Communication networks and systems for power utility automation Basic communication structure. Hydroelectric power plants. Modelling concepts and guidelines |
BS EN 61850-7-4:2010 (published 2010-07)
|
Communication networks and systems for power utility automation Basic communication structure. Compatible logical node classes and data object classes |
IEC 61869-9:2016
|
Instrument transformers - Part 9: Digital interface for instrument transformers |
06/30145429 DC : DRAFT MAY 2006
|
|
BS PD IEC TR 61850-90-3 : 2016
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 90-3: USING IEC 61850 FOR CONDITION MONITORING DIAGNOSIS AND ANALYSIS |
BS PD IEC TR 61850-90-12 : 2015
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 90-12: WIDE AREA NETWORK ENGINEERING GUIDELINES |
BS EN 61850-10 : 2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING |
I.S. EN 61850-6:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
PD IEC/TR 61850-1:2013 (published 2013-03)
|
Communication networks and systems for power utility automation Introduction and overview |
02/206919 DC : DRAFT MAY 2002
|
IEC 61850-8-1. ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO MMS (ISO/IEC 9506 PART 1 AND PART 2) OVER ISO 8802-3 |
BS PD IEC TR 61850-90-2 : 2016
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 90-2: USING IEC 61850 FOR COMMUNICATION BETWEEN SUBSTATIONS AND CONTROL CENTRES |
CEI EN 61850-7-1 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS |
BS PD IEC/TR 62689-100 : 2016
|
CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 100: REQUIREMENTS AND PROPOSALS FOR THE IEC 61850 SERIES DATA MODEL EXTENSIONS TO SUPPORT FAULT PASSAGE INDICATORS APPLICATIONS |
12/30267268 DC : 0
|
BS EN 61869-9 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 9: DIGITAL INTERFACE FOR INSTRUMENT TRANSFORMERS |
03/304152 DC : DRAFT MAR 2003
|
IEC 61850-10 ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 10: CONFORMANCE TESTING |
I.S. EN 62271-3:2015
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
12/30274900 DC : 0
|
BS IEC 61869-9 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 9: DIGITAL INTERFACE FOR INSTRUMENT TRANSFORMERS |
I.S. EN 61400-25-2:2015
|
WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
CEI EN 61850-10 : 2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING |
17/30358470 DC : 0
|
BS EN 61850-8-2 ED1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP) |
PD IEC/TR 61850-80-3:2015
|
Communication networks and systems for power utility automation Mapping to web protocols. Requirements and technical choices |
05/30137813 DC : DRAFT AUG 2005
|
IEC 61400-25-5 ED 1 - WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
PD IEC/TR 61850-90-4:2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 90-4: NETWORK ENGINEERING GUIDELINES |
02/206918 DC : DRAFT MAY 2002
|
IEC 61850-6. ED.1 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 6: SUBSTATION AUTOMATION SYSTEM CONFIGURATION DESCRIPTION LANGUAGE |
08/30182501 DC : DRAFT MAY 2008
|
BS EN 61850-7-1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS |
07/30147754 DC : 0
|
BS IEC 61850-6 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
DD IEC TS 61850-2 : 2003
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 2: GLOSSARY |
12/30265386 DC : 0
|
BS EN 62271-3 ED 2 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
BS EN 61400-25-2:2015
|
WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
BS PD IEC TR 61850-7-500 : 2017
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-500: BASIC INFORMATION AND COMMUNICATION STRUCTURE - USE OF LOGICAL NODES FOR MODELING APPLICATION FUNCTIONS AND RELATED CONCEPTS AND GUIDELINES FOR SUBSTATIONS |
07/30166755 DC : 0
|
BS EN 61850-7-4 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA CLASSES |
11/30251804 DC : 0
|
BS EN 61850-10 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING |
09/30212527 DC : 0
|
BS EN 61850-7-410 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
12/30260040 DC : 0
|
BS EN 62270 - GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION |
BS PD IEC TR 61850-90-1 : 2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 90-1: USE OF IEC 61850 FOR THE COMMUNICATION BETWEEN SUBSTATIONS |
I.S. EN 61850-7-2:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
BS EN 61850-7-2:2010
|
Communication networks and systems for power utility automation Basic information and communication structure. Abstract communication service interface (ACSI) |
16/30336107 DC : 0
|
BS EN 61850-7-4 AMD1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
BS EN 61850-7-1:2011
|
Communication networks and systems for power utility automation Basic communication structure. Principles and models |
15/30326344 DC : 0
|
BS EN 61850-8-2 ED 1.0 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP) |
BS EN 61850-8-1:2011
|
Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEEE 1815.1 : 2015
|
EXCHANGING INFORMATION BETWEEN NETWORKS IMPLEMENTING IEC 61850 AND IEEE STD 1815 [TM] [DISTRIBUTED NETWORK PROTOCOL (DNP3)] |
04/30092543 DC : DRAFT MAR 2004
|
|
IEC TR 61850-7-500:2017
|
Communication networks and systems for power utility automation - Part 7-500: Basic information and communication structure - Use of logical nodes for modeling application functions and related concepts and guidelines for substations |
IEC TR 61850-7-510:2012
|
Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines |
BS EN 61850-6:2010 (published 2010-03)
|
Communication networks and systems for power utility automation Configuration description language for communication in electrical substations related to IEDs |
IEEE C37.238 : 2011
|
USE OF IEEE 1588 PRECISION TIME PROTOCOL IN POWER SYSTEM APPLICATIONS |
CEI EN 61850-7-2 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
CEI EN 61850-6 : 2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
CEI EN 61400-25-5 : 2007
|
WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
IEEE C37.119 : 2005
|
GUIDE FOR BREAKER FAILURE PROTECTION OF POWER CIRCUIT BREAKERS |
IEC TR 62689-100:2016
|
Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 100: Requirements and proposals for the IEC 61850 series data model extensions to support fault passage indicators applications |
IEEE 1249 : 2013
|
GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION |
I.S. EN 61850-7-4:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
I.S. EN 61850-7-1:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011 (EQV)) |
CEI EN 61850-8-1 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
IEC TR 61850-90-1:2010
|
Communication networks and systems for power utility automation - Part 90-1: Use of IEC 61850 for the communication between substations |
IEEE 2030.100:2017
|
IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control |
NF EN 61850-7-4 : 2003
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 7-4: BASIC COMMUNICATION STRUCTURE FOR SUBSTATION AND FEEDER EQUIPMENT - COMPATIBLE LOGICAL NODE CLASSES AND DATA CLASSES |
IEC 61850-6:2009
|
Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
GOST R IEC 61850-3 : 2005
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 3 - GENERAL REQUIREMENTS |
CEI EN 61850-7-4 : 2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
IEC TS 61850-2:2003
|
Communication networks and systems in substations - Part 2: Glossary |
I.S. EN 61850-10:2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV)) |
IEC TR 61850-90-2:2016
|
Communication networks and systems for power utility automation - Part 90-2: Using IEC 61850 for communication between substations and control centres |
I.S. EN 61850-8-1:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
IEC TR 61850-80-3:2015
|
Communication networks and systems for power utility automation - Part 80-3: Mapping to web protocols - Requirements and technical choices |
IEC TR 61850-90-3:2016
|
Communication networks and systems for power utility automation - Part 90-3: Using IEC 61850 for condition monitoring diagnosis and analysis |
IEC 62270:2013
|
Guide for computer-based control for hydroelectric power plant automation |
IEC TR 61850-1:2013
|
Communication networks and systems for power utility automation - Part 1: Introduction and overview |
IEC 61850-8-1:2011
|
Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 61850-7-4:2010
|
Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
NF EN 61850-7-2 : 2003
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 7-2: BASIC COMMUNICATION STRUCTURE FOR SUBSTATION AND FEEDER EQUIPMENT - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
NF EN 61850-6 : 2004
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
IEC 61850-10:2012
|
Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEC 61850-7-2:2010
|
Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
IEC 61400-25-2:2015
|
Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
IEC 61850-7-1:2011
|
Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
IEC 62271-3:2015
|
High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
EN 61850-8-1:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
EN 61850-7-2:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
EN 61850-7-4:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
EN 61850-7-1:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011) |
EN 61850-10:2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012) |
EN 62271-3:2015
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 (IEC 62271-3:2015) |
EN 61850-6:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
EN 61400-25-2:2015
|
WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS (IEC 61400-25-2:2015) |