• UIC 505-4 : 4ED 2007

    Current The latest, up-to-date edition.

    EFFECTS OF THE APPLICATION OF THE KINEMATIC GAUGES DEFINED IN THE 505 SERIES OF LEAFLETS ON THE POSITIONING OF STRUCTURES IN RELATION TO THE TRACKS AND OF THE TRACKS IN RELATION TO EACH OTHER

    Available format(s): 

    Language(s): 

    Published date:  12-01-2013

    Publisher:  Union Internationale des Chemins de Fer

    Sorry this product is not available in your region.

    Add To Cart

    Abstract - (Show below) - (Hide below)

    Describes rules enabling infrastructure managers (IM) to determine the clearance which must be provided and maintained so that rolling stock dimensioned according to the gauges set out in UIC Leaflet 505-1 can safely negotiate structures and pass other rolling stock (distance between track centre lines).

    General Product Information - (Show below) - (Hide below)

    Document Type Standard
    Publisher Union Internationale des Chemins de Fer
    Status Current

    Standards Referenced By This Book - (Show below) - (Hide below)

    BS EN 50119 : 2009 RAILWAY APPLICATIONS - FIXED INSTALLATIONS - ELECTRIC TRACTION OVERHEAD CONTACT LINES
    05/30137978 DC : 0 EN 15273-1 - RAILWAY APPLICATIONS - GAUGES - PART 1: GENERALITIES - COMMON RULES FOR INFRASTRUCTURE AND ROLLING STOCK
    PREN 13232-2 : DRAFT 2014 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN
    BS EN 15273-2 : 2013 RAILWAY APPLICATIONS - GAUGES - PART 2: ROLLING STOCK GAUGE
    BS EN 15273-1 : 2013 RAILWAY APPLICATIONS - GAUGES - PART 1: GENERAL - COMMON RULES FOR INFRASTRUCTURE AND ROLLING STOCK
    14/30294492 DC : 0 BS EN 13232-2 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN
    11/30215604 DC : 0 BS IEC 60913 - RAILWAY APPLICATIONS - FIXED INSTALLATIONS - ELECTRIC TRACTION OVERHEAD CONTACT LINES
    I.S. EN 15273-1:2013 RAILWAY APPLICATIONS - GAUGES - PART 1: GENERAL - COMMON RULES FOR INFRASTRUCTURE AND ROLLING STOCK
    03/310084 DC : DRAFT JUNE 2003 BS EN 13232-9 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 9: LAYOUTS
    DIN EN 15273-2:2014-06 RAILWAY APPLICATIONS - GAUGES - PART 2: ROLLING STOCK GAUGE
    I.S. EN 50119:2009 RAILWAY APPLICATIONS - FIXED INSTALLATIONS - ELECTRIC TRACTION OVERHEAD CONTACT LINES
    I.S. EN 13232-9:2006 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 9: LAYOUTS
    12/30241403 DC : 0 BS EN 15273-1 - RAILWAY APPLICATIONS - GAUGES - GENERAL - COMMON RULES FOR INFRASTRUCTURE AND ROLLING STOCK
    05/19988433 DC : 0 PREN 14033-2 - RAILWAY APPLICATIONS - TRACK - RAILBOUND CONSTRUCTION AND MAINTENANCE MACHINES - PART 2: TECHNICAL REQUIREMENTS FOR WORKING
    DIN EN 13232-9:2012-01 Railway applications - Track - Switches and crossings - Part 9: Layouts (includes Amendment A1:2011)
    UNE-EN 13232-9:2007 Railway applications - Track - Switches and crossings - Part 9: Layouts
    UNI EN 13232-9 : 2012 Railway applications - Track - Switches and crossings - Part 9: Layouts
    I.S. EN 15273-2:2013 RAILWAY APPLICATIONS - GAUGES - PART 2: ROLLING STOCK GAUGE
    14/30294489 DC : 0 BS EN 13232-3 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 3: REQUIREMENTS FOR WHEEL/RAIL INTERACTION
    DIN EN 15273-3:2014-06 RAILWAY APPLICATIONS - GAUGES - PART 3: STRUCTURE GAUGES
    DIN EN 15273-1:2014-06 RAILWAY APPLICATIONS - GAUGES - PART 1: GENERAL - COMMON RULES FOR INFRASTRUCTURE AND ROLLING STOCK
    I.S. EN 15273-3:2013 RAILWAY APPLICATIONS - GAUGES - PART 3: STRUCTURE GAUGES
    IEC 60913:2013 Railway applications - Fixed installations - Electric traction overhead contact lines
    I.S. EN 50119:2020 Railway applications - Fixed installations - Electric traction overhead contact lines
    DIN EN 13232-9:2014-07 (Draft) RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 9: LAYOUTS
    EN 50119 : 2009 AMD 1 2013 RAILWAY APPLICATIONS - FIXED INSTALLATIONS - ELECTRIC TRACTION OVERHEAD CONTACT LINES
    EN 15273-2:2013+A1:2016 Railway applications - Gauges - Part 2: Rolling stock gauge
    EN 15273-3:2013+A1:2016 Railway applications - Gauges - Part 3: Structure gauges
    12/30241409 DC : DRAFT JUNE 2012 BS EN 15273-3 - RAILWAY APPLICATIONS - GAUGES - STRUCTURE GAUGES
    BS EN 15273-3 : 2013 RAILWAY APPLICATIONS - GAUGES - PART 3: STRUCTURE GAUGES
    PREN 13232-3 : DRAFT 2014 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 3: REQUIREMENTS FOR WHEEL/RAIL INTERACTION
    EN 15273-1:2013+A1:2016/AC:2017 RAILWAY APPLICATIONS - GAUGES - PART 1: GENERAL - COMMON RULES FOR INFRASTRUCTURE AND ROLLING STOCK
    DIN EN 13232-9 E : 2012 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 9: LAYOUTS (INCLUDES AMENDMENT A1:2011)
    BS EN 13232-9 : 2006 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 9: LAYOUTS
    EN 13232-9:2006+A1:2011 Railway applications - Track - Switches and crossings - Part 9: Layouts
    UNE-EN 15273-1:2013 Railway applications - Gauges - Part 1: General - Common rules for infrastructure and rolling stock
    UNE-EN 15273-3:2014 Railway applications - Gauges - Part 3: Structure gauges
    UNE-EN 15273-2:2013 Railway applications - Gauges - Part 2: Rolling stock gauge
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective