12/30260280 DC : 0
|
BS 5839-6 - FIRE DETECTION AND FIRE ALARM SYSTEMS FOR BUILDINGS - PART 6: CODE OF PRACTICE FOR THE DESIGN, INSTALLATION, COMMISSIONING AND MAINTENANCE OF FIRE DETECTION AND FIRE ALARM SYSTEMS IN DOMESTIC PREMISES |
03/119007 DC : DRAFT DEC 2003
|
BS 5839-6 - FIRE DETECTION AND FIRE ALARM SYSTEMS FOR BUILDINGS - PART 6: CODE OF PRACTICE FOR THE DESIGN, INSTALLATION AND MAINTENANCE OF FIRE DETECTION AND FIRE ALARM SYSTEMS IN DWELLINGS |
BS 5839-6:2013
|
Fire detection and fire alarm systems for buildings Code of practice for the design, installation, commissioning and maintenance of fire detection and fire alarm systems in domestic premises |
BS 7273-4:2015
|
Code of practice for the operation of fire protection measures Actuation of release mechanisms for doors |
BS 5839-1(2002) : 2002
|
FIRE DETECTION AND FIRE ALARM SYSTEMS FOR BUILDINGS - PART 1: CODE OF PRACTICE FOR SYSTEM DESIGN, INSTALLATION, COMMISSIONING AND MAINTENANCE |
BS 9999:2008
|
Code of practice for fire safety in the design, management and use of buildings |
BS 5839-1:2017
|
Fire detection and fire alarm systems for buildings Code of practice for design, installation, commissioning and maintenance of systems in non-domestic premises |
12/30260278 DC : 0
|
BS 5839-1 - FIRE DETECTION AND FIRE ALARM SYSTEMS FOR BUILDINGS - PART 1: CODE OF PRACTICE FOR DESIGN, INSTALLATION, COMMISSIONING AND MAINTENANCE |
12/30258581 DC : 0
|
BS 5908-2 - FIRE AND EXPLOSION PRECAUTIONS AT PREMISES HANDLING FLAMMABLE GASES, LIQUIDS AND DUSTS - PART 2: GUIDE TO APPLICABLE STANDARDS AND REGULATIONS |
06/30133094 DC : DRAFT OCT 2006
|
BS 7273-4 - CODE OF PRACTICE FOR THE OPERATION OF FIRE PROTECTION MEASURES - PART 4: ACTUATION OF RELEASE MECHANISMS FOR DOORS |
BS 5839-1:2013
|
Fire detection and fire alarm systems for buildings Code of practice for design, installation, commissioning and maintenance of systems in non-domestic premises |
EEMUA 138 : 2010
|
DESIGN AND INSTALLATION OF ON-LINE ANALYSER SYSTEMS |
15/30288999 DC : 0
|
BS 7273-4 - CODE OF PRACTICE FOR THE OPERATION OF FIRE PROTECTION MEASURES - PART 4: ACTUATION OF RELEASE MECHANISMS FOR DOORS |
01/540647 DC : DRAFT MAY 2001
|
BS 5839-1 - FIRE DETECTION AND ALARM SYSTEMS FOR BUILDINGS - PART 1 - CODE OF PRACTICE FOR SYSTEM DESIGN, INSTALLATION AND MAINTENANCE |
BS 9999:2017
|
Fire safety in the design, management and use of buildings. Code of practice |
BS 5908-2:2012
|
Fire and explosion precautions at premises handling flammable gases, liquids and dusts Guide to applicable standards and regulations |
BS 7273-4:2007
|
Code of practice for the operation of fire protection measures Actuation of release mechanisms for doors |
16/30314117 DC : 0
|
BS 9999 - FIRE SAFETY IN THE DESIGN, MANAGEMENT AND USE OF BUILDINGS - CODE OF PRACTICE |
PD 7974-4:2003
|
Application of fire safety engineering principles to the design of buildings Detection of fire and activation of fire protection systems. (Sub-system 4) |
BS 5839-6:2004
|
Fire detection and fire alarm systems for buildings Code of practice for the design, installation and maintenance of fire detection and fire alarm systems in dwellings |