• Shopping Cart
    There are no items in your cart

EN 50518-1:2013

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

MONITORING AND ALARM RECEIVING CENTRE - PART 1: LOCATION AND CONSTRUCTION REQUIREMENTS

Superseded date

27-01-2022

Superseded by

EN 50518:2019

Published date

12-01-2013

Sorry this product is not available in your region.

Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Site selection
5 Construction
6 Alarm systems of ARC
7 Electrical power supplies
Annex A (informative) - Recommendation lock code
        requirements
Annex B (informative) - Typical ARC layout
Bibliography

Defines the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by one or more intruder and hold-up alarm systems takes place as an integrated part of the total safety and security process.

Committee
TC 79
DevelopmentNote
To be read in conjunction with EN 50518-2 and EN 50518-3. (11/2013)
DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Superseded
SupersededBy

08/30183528 DC : 0 BS EN 50518-2 - ALARM SYSTEMS - MONITORING AND ALARM RECEIVING CENTER - PART 2: TECHNICAL REQUIREMENTS
CEI UNI EN 50518-2 : 2015 MONITORING AND ALARM RECEIVING CENTRE - PART 2: TECHNICAL REQUIREMENTS
I.S. EN 50134-7:2017 ALARM SYSTEMS - SOCIAL ALARM SYSTEMS - PART 7: APPLICATION GUIDELINES
BS EN 50134-7:2017 Alarm systems. Social alarm systems Application guidelines
EN 50134-7:2017 Alarm systems - Social alarm systems - Part 7: Application guidelines
EN 50518-2:2013 MONITORING AND ALARM RECEIVING CENTRE - PART 2: TECHNICAL REQUIREMENTS
EN 50518-3:2013 MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION
PREN 50518-2 : DRAFT 2008 MONITORING AND ALARM RECEIVING CENTRE - PART 2: REQUIREMENTS FOR TECHNICAL FACILITIES
PREN 50518-3 : DRAFT 2009 MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION
I.S. EN 50518-2:2013 MONITORING AND ALARM RECEIVING CENTRE - PART 2: TECHNICAL REQUIREMENTS
UNI CEI EN 50518-3 : 2014 MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION
09/30183531 DC : 0 BS EN 50518-3 - MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION
UNE-EN 50518-2:2014 Monitoring and alarm receiving centre - Part 2: Technical requirements
UNE-EN 50134-7:2017 Alarm systems - Social alarm systems - Part 7: Application guidelines
BS EN 50518-2:2013 Monitoring and alarm receiving centre Technical requirements
15/30325557 DC : 0 BS EN 50134-7 - ALARM SYSTEMS - SOCIAL ALARM SYSTEMS - PART 7: APPLICATION GUIDELINES
PREN 50134-7 : DRAFT 2015 ALARM SYSTEMS - SOCIAL ALARM SYSTEMS - PART 7: APPLICATION GUIDELINES
UNE-EN 50518-3:2013 Monitoring and alarm receiving centre - Part 3: Procedures and requirements for operation
UNI CEI EN 50518-2 : 2014 MONITORING AND ALARM RECEIVING CENTRE - PART 2: TECHNICAL REQUIREMENTS
BS EN 50518-3:2013 Monitoring and alarm receiving centre Procedures and requirements for operation
CEI UNI EN 50518-3 : 2015 MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION
I.S. EN 50518-3:2013 MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION

EN 1906:2012 Building hardware - Lever handles and knob furniture - Requirements and test methods
EN 62040-1:2008/A1:2013 UNINTERRUPTIBLE POWER SYSTEMS (UPS) - PART 1: GENERAL AND SAFETY REQUIREMENTS FOR UPS (IEC 62040-1:2008/A1:2013)
CLC/TS 50131-7:2010 Alarm systems - Intrusion and hold-up systems - Part 7: Application guidelines
EN 50136-1:2012 Alarm systems - Alarm transmission systems and equipment - Part 1: General requirements for alarm transmission systems
EN 1627:2011 Pedestrian doorsets, windows, curtain walling, grilles and shutters - Burglar resistance - Requirements and classification
EN 1303:2015 Building hardware - Cylinders for locks - Requirements and test methods
EN 61000-4-2:2009 Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test
EN 13501-2:2016 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services
IEC 62040-1:2017 EXV UNINTERRUPTIBLE POWER SYSTEMS (UPS) - PART 1: SAFETY REQUIREMENTS
EN 50518-3:2013 MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION
EN 12209:2016 Building hardware - Mechanically operated locks and locking plates - Requirements and test methods
EN 50518-2:2013 MONITORING AND ALARM RECEIVING CENTRE - PART 2: TECHNICAL REQUIREMENTS
EN 1063:1999 Glass in building - Security glazing - Testing and classification of resistance against bullet attack
IEC 61000-4-2:2008 Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test
EN 50272-2:2001 Safety requirements for secondary batteries and battery installations - Part 2: Stationary batteries
CEN/TR 14383-8:2009 Prevention of crime - Urban planning and building design - Part 8: Protection of buildings and sites against criminal attacks with vehicles
EN 50131-1:2006/A2:2017 ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 1: SYSTEM REQUIREMENTS
EN 356:1999 Glass in building - Security glazing - Testing and classification of resistance against manual attack
EN 1522:1998 Windows, doors, shutters and blinds - Bullet resistance - Requirements and classification
EN 50131-4:2009 Alarm systems - Intrusion and hold-up systems - Part 4: Warning devices
EN 14846:2008 Building hardware - Locks and latches - Electromechanically operated locks and striking plates - Requirements and test methods
EN 13779:2007 Ventilation for non-residential buildings - Performance requirements for ventilation and room-conditioning systems
EN 50132-7:2012 Alarm systems - CCTV surveillance systems for use in security applications - Part 7: Application guidelines
EN 179:2008 Building hardware - Emergency exit devices operated by a lever handle or push pad, for use on escape routes - Requirements and test methods

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.