Insulation co-ordination - Part 2: Application guide
01-05-2018
03-01-1997
1 General
1.1 Scope
1.2 Normative references
1.3 List of symbols and definitions
2 Representative voltage stresses in service
2.1 Origin and classification of voltage stresses
2.2 Characteristics of overvoltage protective devices
2.3 Representative voltages and overvoltages
3 Co-ordination withstand voltage
3.1 Insulation strength characteristics
3.2 Performance criterion
3.3 Insulation co-ordination procedures
4 Required withstand voltage
4.1 General remarks
4.2 Atmospheric correction
4.3 Safety factors
5 Standard withstand voltage and testing procedures
5.1 General remarks
5.2 Test conversion factors
5.3 Determination of insulation withstand by type tests
6 Special considerations for overhead lines
6.1 General remarks
6.2 Insulation co-ordination for operating voltages
and temporary overvoltages
6.3 Insulation co-ordination for slow-front overvoltages
6.4 Insulation co-ordination for lightning overvoltages
7 Special considerations for substations
7.1 General remarks
7.2 Insulation co-ordination for overvoltages
Tables
1 Recommended creepage distances
2 Test conversion factors for range I, to convert required
switching impulses withstand voltages to short-
duration power-frequency and lightning impulse
withstand voltages
3 Test conversion factors for range II to convert required
short-duration power-frequency withstand voltages to
switching impulse withstand voltages
4 Selectivity of test procedures B and C of IEC 60-1
A.1 Correlation between standard lightning impulse withstand
voltages and minimum air clearances
A.2 Correlation between standard switching impulse withstand
voltages and minimum phase-to-earth air clearances
A.3 Correlation between standard switching impulse withstand
voltages and minimum phase-to-phase air clearances
C.1 Breakdown voltage versus cumulative flashover
probability - single insulation and 100 parallel
insulations
F.1 Corona damping constant Kco
F.2 Factor A for various overhead lines
G.1 Typical gap factors K for switching impulse breakdown
phase-to-earth
G.2 Gap factors for typical phase-to-phase geometries
H.1 Summary of minimum required withstand voltages obtained
for example H.1.1
H.2 Summary of required withstand voltages obtained for
example H.1.2
H.3 Values related to the insulation co-ordination
procedure for example H.3
Figures
1 Range of 2% slow-front overvoltages at the receiving end
due to line energization and re-energization
2 Ratio between the 2% values of slow-front overvoltages
phase-to-phase and phase-to-earth
3 Diagram for surge arrester connection to the
protected object
4 Distributive discharge probability of self-restoring
insulation described on a linear scale
5 Disruptive discharge probability of self-restoring
insulation described on a Gaussian scale
6 Evaluation of deterministic co-ordination factor Kcd
7 Evaluation of the risk of failure
8 Risk of failure of external insulation for slow-front
overvoltages as a function of the statistical co-
ordination factor Kcs
9 Dependence of exponent m on the co-ordination switching
impulse withstand voltage
10 Probability P of an equipment to pass the test dependent
on the difference K between the actual and the rated
impulst withstand voltage
11 Example of a schematic substation layout used for the
overvoltage stress location (see 7.1)
B.1 Earth-fault factor k on a base ofXo/X1 for R1/X1=0
B.2 Relationship between Ro/X1 for constant values of
earth-fault factor k where R1 = 0
B.3 Relationship between Ro/X1 et Xo/X1 for constant values
of earth-fault factor k where R1 - 0.5 X1
B.4 Relationship between Ro/X1 et Xo/X1 for constant values of
earth-fault factor k where R1 = X1
B.5 Relationship between Ro/X1 et Xo/X1 for constant values
of earth-fault k where R1 = X1
C.1 Conversion chart for the reduction of the withstand
voltage due to phasing insulation configurations in
parallel
D.1 Example for bivariate phase-to-phase overvoltage curves
with constant probability density and tangents giving
the relevant 2% values
D.2 Principle of the determination of the representative
phase-to-phase overvoltage Upre
D.3 Schematic phase-phase-earth insulation configuration
D.4 Description of the 50% switching impulse flashover
voltage of a phase-phase-earth insulation
D.5 Inclination angle of the phase-to-phase insulation
characteristic in range b dependent on the ratio of
the phase-phase-clearance D to the height Ht above earth
E.1 Distributed capacitances of the windings of a transformer
and the equivalent circuit describing the windings
E.2 Values of factor J describing the effect of the
winding connections rn the inductive surge transference
Annexes
A Clearances in air to assure a specified impulse withstand
voltage installation
B Determination of temporary overvoltages due to earth
faults
C Weibull probability distributions
D Determination of the representative slow-front over-
voltage due to line energization and re-energization
E transferred overvoltages in transformers
F Lightning overvoltages
G Calculation of air gap breakdown strength from
experimental data
H Examples of insulation co-ordination procedure
J Bibliography
ZA (normative) Normative references to international
publications with their corresponding European
publications
Gives guidance for the determination of the rated withstand voltages for ranges I and II of EN 60071-1 and justifies the association of these rated values with the standardized highest voltages for equipment. It covers phase-to-phase, phase-to-earth and longitudinal insulation of three-phase systems with nominal voltages above 1kV
Committee |
CLC/SR 28
|
DevelopmentNote |
Redesignated as EN IEC 60071-2. (05/2018)
|
DocumentType |
Standard
|
PublisherName |
European Committee for Standards - Electrical
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
Standards | Relationship |
CEI EN 60071-2 : 1998 | Identical |
DIN EN 60071-2 : 1997 | Identical |
BS EN 60071-2:1997 | Identical |
I.S. EN 60071-2:1999 | Identical |
UNE-EN 60071-2:1999 | Identical |
NBN EN 60071-2 : 1998 | Identical |
SN EN 60071-2 : 1997 | Identical |
VDE 0111-2 : 1997 | Identical |
NF EN 60071-2 : 1997 | Identical |
IEC 60071-2:1996 | Identical |
PN EN 60071-2 : 2000 | Identical |
ONORM OVE EN 60071-2 : 1998 | Identical |
UNE-EN 50124-1:2017 | Railway applications - Insulation coordination - Part 1: Basic requirements - Clearances and creepage distances for all electrical and electronic equipment |
UNE-EN 50341-1:2017 | Overhead electrical lines exceeding AC 1 kV - Part 1: General requirements - Common specifications |
BS EN 61869-1:2009 | Instrument transformers General requirements |
BS EN 50341-2-20:2015 | Overhead electrical lines exceeding AC 45 kV National Normative Aspects (NNA) for ESTONIA (based on EN 50341-1:2012) |
UNE-EN 61400-24:2011 | Wind turbines - Part 24: Lightning protection |
BS EN 60143-4:2010 | Series capacitors for power systems Thyristors controlled series capacitors |
BS EN 62823:2015 | Thyristor valves for thyristor controlled series capacitors (TCSC). Electrical testing |
BS EN 61000-2-12:2003 | Electromagnetic compatibility (EMC). Environment Compatibility levels for low-frequency conducted disturbances and signalling in public medium-voltage power supply systems |
I.S. EN 50341-1:2012 | OVERHEAD ELECTRICAL LINES EXCEEDING AC 1 KV - PART 1: GENERAL REQUIREMENTS - COMMON SPECIFICATIONS |
15/30298489 DC : 0 | BS EN 50124-1 - RAILWAY APPLICATIONS - INSULATION COORDINATION - PART 1: BASIC REQUIREMENTS - CLEARANCES AND CREEPAGE DISTANCES FOR ALL ELECTRICAL AND ELECTRONIC EQUIPMENT |
CEI EN 62252 : 2005 | MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS - RADAR FOR CRAFT NOT IN COMPLIANCE WITH IMO SOLAS CHAPTER V - PERFORMANCE REQUIREMENTS, METHODS OF TEST AND REQUIRED TEST RESULTS |
I.S. EN 60143-4:2010 | SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS |
I.S. EN 50110-1:2013 | OPERATION OF ELECTRICAL INSTALLATIONS - PART 1: GENERAL REQUIREMENTS |
EN 62271-1:2017 | High-voltage switchgear and controlgear - Part 1: Common specifications for alternating current switchgear and controlgear |
I.S. EN 60071-5:2015 | INSULATION CO-ORDINATION - PART 5: PROCEDURES FOR HIGH-VOLTAGE DIRECT CURRENT (HVDC) CONVERTER STATIONS |
BS EN 50341-1:2012 | Overhead electrical lines exceeding AC 1 kV General requirements. Common specifications |
UNE-EN 60099-4:2016 | Surge arresters - Part 4: Metal-oxide surge arresters without gaps for a.c. systems |
BS EN 60204-11 : 2001 | SAFETY OF MACHINERY - ELECTRICAL EQUIPMENT OF MACHINES - PART 11: REQUIREMENTS FOR HV EQUIPMENT FOR VOLTAGES ABOVE 1000 V A.C. OR 1500 V D.C. AND NOT EXCEEDING 36 KV |
I.S. EN 60945:2002 | MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS - GENERAL REQUIREMENTS - METHODS OF TESTING AND REQUIRED TEST RESULTS |
I.S. EN 50124-1:2017 | RAILWAY APPLICATIONS - INSULATION COORDINATION - PART 1: BASIC REQUIREMENTS - CLEARANCES AND CREEPAGE DISTANCES FOR ALL ELECTRICAL AND ELECTRONIC EQUIPMENT |
I.S. EN 61000-2-12:2003 | ELECTROMAGNETIC COMPATIBILITY (EMC) - ENVIRONMENT - COMPATIBILITY LEVELS FOR LOW-FREQUENCY CONDUCTED DISTURBANCES AND SIGNALLING IN PUBLIC MEDIUM-VOLTAGE POWER SUPPLY SYSTEMS |
UNE-EN 61140:2017 | Protection against electric shock - Common aspects for installation and equipment |
EN 60071-5:2015 | Insulation co-ordination - Part 5: Procedures for high-voltage direct current (HVDC) converter stations |
EN 60099-4:2014 | Surge arresters - Part 4: Metal-oxide surge arresters without gaps for a.c. systems |
EN 60071-1:2006/A1:2010 | INSULATION CO-ORDINATION - PART 1: DEFINITIONS, PRINCIPLES AND RULES |
EN 62271-109:2009/A1:2013 | HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 109: ALTERNATING-CURRENT SERIES CAPACITOR BY-PASS SWITCHES (IEC 62271-109:2008/A1:2013) |
HD 637 S1:1999/corrigendum:2005 | POWER INSTALLATIONS EXCEEDING 1 KV A.C. |
EN 60204-11:2000/corrigendum:2010 | SAFETY OF MACHINERY - ELECTRICAL EQUIPMENT OF MACHINES - PART 11: REQUIREMENTS FOR HV EQUIPMENT FOR VOLTAGES ABOVE 1000 V A.C. OR 1500 V D.C. AND NOT EXCEEDING 36 KV |
EN 60143-1:2015/AC:2017-05 | Series capacitors for power systems - Part 1: General |
EN 61000-2-12:2003 | Electromagnetic compatibility (EMC) - Part 2-12: Environment - Compatibility levels for low-frequency conducted disturbances and signalling in public medium-voltage power supply systems |
EN 60945:2002 | Maritime navigation and radiocommunication equipment and systems - General requirements - Methods of testing and required test results |
EN 61230:2008 | LIVE WORKING - PORTABLE EQUIPMENT FOR EARTHING OR EARTHING AND SHORT-CIRCUITING |
PREN 50124-1 : DRAFT 2015 | RAILWAY APPLICATIONS - INSULATION COORDINATION - PART 1: BASIC REQUIREMENTS - CLEARANCES AND CREEPAGE DISTANCES FOR ALL ELECTRICAL AND ELECTRONIC EQUIPMENT |
BS EN 50186-1:1999 | Live-line washing systems for power installations with nominal voltages above 1 kV Common requirements |
I.S. EN 60726:2003 | DRY-TYPE POWER TRANSFORMERS |
CEI EN 60945 : 2003 | MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS - GENERAL REQUIREMENTS - METHODS OF TESTING AND REQUIRED TEST RESULTS |
I.S. EN 61071:2007 | CAPACITORS FOR POWER ELECTRONICS |
EN 50341-2-20:2015 | Overhead electrical lines exceeding AC 1 kV - Part 2-20: National Normative Aspects (NNA) for ESTONIA (based on EN 50341-1:2012) |
CEI EN 60099-5 : 2014 | SURGE ARRESTERS - PART 5: SELECTION AND APPLICATION RECOMMENDATIONS |
EN 50124-1:2017 | Railway applications - Insulation coordination - Part 1: Basic requirements - Clearances and creepage distances for all electrical and electronic equipment |
CLC/TR 50488:2006 | Railway applications - Safety measures for the personnel working on or near overhead contact lines |
CEI EN 60099-4 : 2015 | SURGE ARRESTERS - PART 4: METAL-OXIDE SURGE ARRESTERS WITHOUT GAPS FOR A.C. SYSTEMS |
CEI EN 60143-4 : 2012 | SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS |
EN 61936-1 : 2010 AMD 1 2014 | POWER INSTALLATIONS EXCEEDING 1 KV A.C. - PART 1: COMMON RULES (IEC 61936-1:2010/A1:2014) |
EN 50341-1:2012 | Overhead electrical lines exceeding AC 1 kV - Part 1: General requirements - Common specifications |
I.S. EN 60099-4:2014 | SURGE ARRESTERS - PART 4: METAL-OXIDE SURGE ARRESTERS WITHOUT GAPS FOR A.C. SYSTEMS |
VDE 0674-1 : 2001-12 | TESTS ON INDOOR AND OUTDOOR POST INSULATORS OF CERAMIC MATERIAL OR GLASS FOR SYSTEMS WITH NOMINAL VOLTAGES GREATER THAN 1 KV |
DIN EN 50186-1 : 1999 | LIVE-LINE WASHING SYSTEMS FOR POWER INSTALLATIONS WITH RATED VOLTAGES ABOVE 1 KV - PART 1: GENERAL REQUIREMENTS |
DIN IEC/TR 62543 : 2018 | HIGH-VOLTAGE DIRECT CURRENT (HVDC) POWER TRANSMISSION USING VOLTAGE SOURCED CONVERTERS (VSC) (IEC/TR 62543:2011 + A1:2013 + A2:2017) |
DIN EN 60168 : 2001-12 | TESTS ON INDOOR AND OUTDOOR POST INSULATORS OF CERAMIC MATERIAL OR GLASS FOR SYSTEMS WITH NOMINAL VOLTAGES GREATER THAN 1 KV |
VDE 0553-543 : 2018 | HIGH-VOLTAGE DIRECT CURRENT (HVDC) POWER TRANSMISSION USING VOLTAGE SOURCED CONVERTERS (VSC) (IEC/TR 62543:2011 + A1:2013 + A2:2017) |
EN 60529:1991/AC:2016-12 | DEGREES OF PROTECTION PROVIDED BY ENCLOSURES (IP CODE) (IEC 60529 EDITION 2.2 CORRIGENDUM 2:2015) |
CEI EN 50110-1 : 2014 | OPERATION OF ELECTRICAL INSTALLATIONS - PART 1: GENERAL REQUIREMENTS |
UNE-EN 60071-5:2015 | Insulation co-ordination - Part 5: Procedures for high-voltage direct current (HVDC) converter stations |
I.S. EN 62252:2004 | MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS - RADAR FOR CRAFT NOT IN COMPLIANCE WITH IMO SOLAS CHAPTER 5 - PERFORMANCE REQUIREMENTS, METHODS OF TEST AND REQUIRED TEST RESULTS |
BS EN 62271-1:2017 | High-voltage switchgear and controlgear Common specifications for alternating current switchgear and controlgear |
I.S. EN 61140:2016 | PROTECTION AGAINST ELECTRIC SHOCK - COMMON ASPECTS FOR INSTALLATION AND EQUIPMENT |
I.S. EN 60099-9:2014 | SURGE ARRESTERS - PART 9: METAL-OXIDE SURGE ARRESTERS WITHOUT GAPS FOR HVDC CONVERTER STATIONS |
CEI EN 50341-1 : 2013 | OVERHEAD ELECTRICAL LINES EXCEEDING AC 1 KV - PART 1: GENERAL REQUIREMENTS - COMMON SPECIFICATIONS |
CEI EN 60871-1 : 2015 | SHUNT CAPACITORS FOR A.C. POWER SYSTEMS HAVING A RATED VOLTAGE ABOVE 1000 V - PART 1: GENERAL |
UNE-EN 61472:2014 | Live working - Minimum approach distances for a.c systems in the voltage range 72,5 kV to 800 kV - A method of calculation |
I.S. EN 60204-11:2000 | SAFETY OF MACHINERY - ELECTRICAL EQUIPMENT OF MACHINES PART 11: REQUIREMENTS FOR HV EQUIPMENT FOR VOLTAGES ABOVE 1000 V A.C. OR 1500 V D.C. AND NOT EXCEEDING 36 KV |
EN 62823:2015 | Thyristor valves for thyristor controlled series capacitors (TCSC) - Electrical testing |
UNE-EN 61869-1:2010 | Instrument transformers -- Part 1: General requirements |
UNE-EN 62271-100:2011 | High-voltage switchgear and controlgear -- Part 100: Alternating-current circuit-breakers |
I.S. EN 50341-2-20:2015 | OVERHEAD ELECTRICAL LINES EXCEEDING AC 45 KV - PART 2-20: NATIONAL NORMATIVE ASPECTS (NNA) FOR ESTONIA (BASED ON EN 50341-1:2012) |
BS EN 60071-5:2015 | Insulation co-ordination Procedures for high-voltage direct current (HVDC) converter stations |
12/30260570 DC : 0 | BS EN 50341-1 - OVERHEAD ELECTRICAL LINES EXCEEDING AC 1 KV - PART 1: GENERAL REQUIREMENTS - COMMON SPECIFICATIONS |
CEI EN 61400-24 : 2011 | WIND TURBINES - PART 24: LIGHTNING PROTECTION |
BS EN 60945:2002 | Maritime navigation and radiocommunication equipment and systems. General requirements. Methods of testing and required test results |
BS EN 50110-1:2013 | Operation of electrical installations General requirements |
BS EN 61071:2007 | Capacitors for power electronics |
CEI CLC/TR 50488 : 2007 | RAILWAY APPLICATIONS - SAFETY MEASURES FOR PERSONNEL WORKING NEAR OVERHEAD CONTACT LINES |
BS EN 62252:2004 | Maritime navigation and radiocommunication equipment and systems. Radar for craft not in compliance with IMO SOLAS Chapter V. Performance requirements methods of test and required test results |
BS EN 60099-9:2014 | Surge arresters Metal-oxide surge arresters without gaps for HVDC converter stations |
BS EN 60099-5:2013 | Surge arresters Selection and application recommendations |
UNE-EN 50110-1:2014 | Operation of electrical installations - Part 1: General requirements |
I.S. EN 62823:2015 | THYRISTOR VALVES FOR THYRISTOR CONTROLLED SERIES CAPACITORS (TCSC) - ELECTRICAL TESTING |
EN 62271-100 : 2009 AMD 2/COR 18 | HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 100: ALTERNATING-CURRENT CIRCUIT-BREAKERS (IEC 62271-100:2008/A2:2017/COR1:2018) |
S.R. CLC TR 50488:2007 | RAILWAY APPLICATIONS - SAFETY MEASURES FOR THE PERSONNEL WORKING ON OR NEAR OVERHEAD CONTACT LINES |
VDE 0143-1 : 1999 | LIVE-LINE WASHING SYSTEMS FOR POWER INSTALLATIONS WITH RATED VOLTAGES ABOVE 1 KV - PART 1: GENERAL REQUIREMENTS |
I.S. EN 61936-1:2010 | POWER INSTALLATIONS EXCEEDING 1 KV A.C. - PART 1: COMMON RULES |
I.S. EN 60071-1:2006 | INSULATION CO-ORDINATION - PART 1: DEFINITIONS, PRINCIPLES AND RULES |
I.S. EN 60099-5:2013 | SURGE ARRESTERS - PART 5: SELECTION AND APPLICATION RECOMMENDATIONS (IEC 60099-5:2013 (EQV)) |
BS EN 61140 : 2002 | PROTECTION AGAINST ELECTRIC SHOCK - COMMON ASPECTS FOR INSTALLATION AND EQUIPMENT |
BS EN 61936-1 : 2010 | POWER INSTALLATIONS EXCEEDING 1 KV A.C - PART 1: COMMON RULES |
UNE-EN 61936-1:2012 | Power installations exceeding 1 kV a.c. -- Part 1: Common rules |
PREN 50341-1 : DRAFT 2012 | OVERHEAD ELECTRICAL LINES EXCEEDING AC 1 KV - PART 1: GENERAL REQUIREMENTS - COMMON SPECIFICATIONS |
EN IEC 60099-5:2018 | Surge arresters - Part 5: Selection and application recommendations |
BS EN 61472:2013 | Live working. Minimum approach distances for a.c systems in the voltage range 72,5 kV to 800 kV. A method of calculation |
CEI EN 61071 : 2007 | CAPACITORS FOR POWER ELECTRONICS |
BS EN 61230:2008 | Live working. Portable equipment for earthing or earthing and short-circuiting |
BS EN 60143-1:2015 | Series capacitors for power systems General |
BS EN 50124-1:2017 | Railway applications. Insulation coordination Basic requirements. Clearances and creepage distances for all electrical and electronic equipment |
I.S. EN 60529:1993 | DEGREES OF PROTECTION PROVIDED BY ENCLOSURES (IP CODE) |
I.S. EN IEC 60099-5:2018 | SURGE ARRESTERS - PART 5: SELECTION AND APPLICATION RECOMMENDATIONS |
BS EN 61400-24:2010 | Wind turbines Lightning protection |
I.S. EN 60143-1:2015 | SERIES CAPACITORS FOR POWER SYSTEMS - PART 1: GENERAL |
CEI EN 60099-9 : 2015 | SURGE ARRESTERS - PART 9: METAL-OXIDE SURGE ARRESTERS WITHOUT GAPS FOR HVDC CONVERTER STATIONS |
BS EN 60099-4:2014 | Surge arresters Metal-oxide surge arresters without gaps for a.c. systems |
I.S. EN 61400-24:2010 | WIND TURBINES - PART 24: LIGHTNING PROTECTION |
BS EN 60071-1 : 2006 | INSULATION CO-ORDINATION - PART 1: DEFINITIONS, PRINCIPLES AND RULES |
I.S. HD 637:1999 | POWER INSTALLATIONS EXCEEDING 1 KV A.C. |
I.S. EN 62271-1:2017 | HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 1: COMMON SPECIFICATIONS FOR ALTERNATING CURRENT SWITCHGEAR AND CONTROLGEAR |
I.S. EN 62271-100:2009 | HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 100: ALTERNATING-CURRENT CIRCUIT-BREAKERS |
I.S. EN 62271-109:2009 | HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 109: ALTERNATING-CURRENT SERIES CAPACITOR BY-PASS SWITCHES (IEC 62271-109:2008 (EQV)) |
EN 61140:2016 | Protection against electric shock - Common aspects for installation and equipment |
EN 61869-1:2009 | Instrument transformers - Part 1: General requirements |
EN 60099-9:2014 | Surge arresters - Part 9: Metal-oxide surge arresters without gaps for HVDC converter stations |
EN 60143-4 : 2010 | SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS |
EN 62252:2004 | Maritime navigation and radiocommunication equipment and systems - Radar for craft not in compliance with IMO SOLAS Chapter V - Performance requirements, methods of test and required test results |
EN 61400-24:2010 | Wind turbines - Part 24: Lightning protection |
EN 61472:2013/AC:2015 | LIVE WORKING - MINIMUM APPROACH DISTANCES FOR A.C SYSTEMS IN THE VOLTAGE RANGE 72,5 KV TO 800 KV - A METHOD OF CALCULATION (IEC 61472:2013) |
EN 61071:2007 | Capacitors for power electronics |
EN 50110-1:2013 | Operation of electrical installations - Part 1: General requirements |
EN 60099-5:2013 | Surge arresters - Part 5: Selection and application recommendations |
IEC 60099-4:2014 | Surge arresters - Part 4: Metal-oxide surge arresters without gaps for a.c. systems |
IEC 60056:1987 | High-voltage alternating-current circuit-breakers |
IEC 60505:2011 | Evaluation and qualification of electrical insulation systems |
IEC 60099-1:1991+AMD1:1999 CSV | Surge arresters - Part 1: Non-linear resistor type gapped surge arresters for a.c. systems |
IEC 60099-5:2013 | Surge arresters - Part 5: Selection and application recommendations |
IEC 60060-1:2010 | High-voltage test techniques - Part 1: General definitions and test requirements |
IEC 60507:2013 | Artificial pollution tests on high-voltage ceramic and glass insulators to be used on a.c. systems |
IEC 60071-1:2006+AMD1:2010 CSV | Insulation co-ordination - Part 1: Definitions, principles and rules |
IEC 60721-2-3:2013 | Classification of environmental conditions - Part 2-3: Environmental conditions appearing in nature - Air pressure |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.