• Shopping Cart
    There are no items in your cart

IEC 61850-3:2013

Current

Current

The latest, up-to-date edition.

Communication networks and systems for power utility automation - Part 3: General requirements

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Language(s)

English - French

Published date

12-12-2013

€358.68
Excluding VAT

FOREWORD
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Environmental conditions
5 Ratings
6 Design and construction
7 Tests
8 Marking, labelling and packaging
9 Rules for transport, storage, installation, operation
   and maintenance
10 Product documentation
Bibliography

IEC 61850-3:2013 defines the general requirements, mainly regarding construction, design and environmental conditions for utility communication and automation IEDs (intelligent electronic devices) and systems in power plant and substation environments. These general requirements are in line with requirements for IEDs used in similar environments, for example measuring relays and protection equipment. This new edition includes the following significant technical changes with respect to the previous edition:
- requirements are in line with those of other equipment used in the same environment (e.g. protection relays);
- product safety added based on IEC 60255-27;
- EMC requirements completed and in line with IEC 60255 series and IEC 61000-6-5.

Committee
TC 57
DevelopmentNote
Stability date: 2017. (12/2017)
DocumentType
Standard
Pages
136
PublisherName
International Electrotechnical Committee
Status
Current
Supersedes

03/304152 DC : DRAFT MAR 2003 IEC 61850-10 ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 10: CONFORMANCE TESTING
PD IEC/TR 61850-90-1:2010 Communication networks and systems for power utility automation Use of IEC 61850 for the communication between substations
I.S. EN 60044-8:2002 INSTRUMENT TRANSFORMERS - PART 8: ELECTRONIC CURRENT TRANSFORMERS
BS EN 60044-8:2002 Instrument transformers Electronic current transformers
CSA C60044-8 : 2007 : R2016 INSTRUMENT TRANSFORMERS - PART 8: ELECTRONIC CURRENT TRANSFORMERS
I.S. EN 62271-3:2015 HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850
IEEE 525-2007 IEEE Guide for the Design and Installation of Cable Systems in Substations
IEC TR 61850-1:2013 Communication networks and systems for power utility automation - Part 1: Introduction and overview
EN 61850-10:2013 Communication networks and systems for power utility automation - Part 10: Conformance testing
EN 62271-3:2015 High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850
BS EN 62271-3:2015 High-voltage switchgear and controlgear Digital interfaces based on IEC 61850
IEEE 1547.3 : 2007 MONITORING, INFORMATION EXCHANGE, AND CONTROL OF DISTRIBUTED RESOURCES INTERCONNECTED WITH ELECTRIC POWER SYSTEMS
02/206919 DC : DRAFT MAY 2002 IEC 61850-8-1. ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO MMS (ISO/IEC 9506 PART 1 AND PART 2) OVER ISO 8802-3
CEI EN 61850-5 : 2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS
CEI EN 61850-10 : 2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING
IEEE C37.244-2013 IEEE Guide for Phasor Data Concentrator Requirements for Power System Protection, Control, and Monitoring
12/30260040 DC : 0 BS EN 62270 - GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION
04/30092543 DC : DRAFT MAR 2004
IEC TS 61850-2:2003 Communication networks and systems in substations - Part 2: Glossary
CSA C60044-8 : 2007 : R2011 INSTRUMENT TRANSFORMERS - PART 8: ELECTRONIC CURRENT TRANSFORMERS
IEEE C37.119-2005 IEEE Guide for Breaker Failure Protection of Power Circuit Breakers
08/30181498 DC : DRAFT APR 2008 BS EN 61000-5-8 - ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 5-8: INSTALLATION AND MITIGATION GUIDELINES - HEMP PROTECTION METHODS FOR THE DISTRIBUTED INFRASTRUCTURE
PD IEC/TR 61850-1:2013 Communication networks and systems for power utility automation Introduction and overview
PD IEC/TR 61850-90-4:2013 Communication networks and systems for power utility automation Network engineering guidelines
DD IEC/TS 61850-2:2003 Communication networks and systems in substations Glossary
12/30265386 DC : 0 BS EN 62271-3 ED 2 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850
I.S. EN 62361-2:2013 POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END TO END QUALITY CODES FOR SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)
BS EN 61850-7-1:2011 Communication networks and systems for power utility automation Basic communication structure. Principles and models
BS EN 61850-5:2013 Communication networks and systems for power utility automation Communication requirements for functions and device models
CSA C60044-8 :2007 INSTRUMENT TRANSFORMERS - PART 8: ELECTRONIC CURRENT TRANSFORMERS
IEC TR 61850-90-1:2010 Communication networks and systems for power utility automation - Part 90-1: Use of IEC 61850 for the communication between substations
IEC 62270:2013 Guide for computer-based control for hydroelectric power plant automation
IEC 60044-8:2002 Instrument transformers - Part 8: Electronic current transformers
IEC 62361-2:2013 Power systems management and associated information exchange - Interoperability in the long term - Part 2: End to end quality codes for supervisory control and data acquisition (SCADA)
EN 61850-7-1:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011)
CEI EN 60044-8 : 2004 INSTRUMENT TRANSFORMERS - PART 8: ELECTRONIC CURRENT TRASFORMERS
BS EN 62361-2:2013 Power systems management and associated information exchange. Interoperability in the long term End to end quality codes for supervisory control and data acquisition (SCADA)
CEI EN 61850-7-1 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS
BS EN 61850-10:2013 Communication networks and systems for power utility automation Conformance testing
CEI EN 62361-2 : 2014 POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END-TO-END QUALITY CODES FOR SCADA
I.S. EN 61850-7-1:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011 (EQV))
IEC 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
UNE-EN 60255-1:2010 Measuring relays and protection equipment -- Part 1: Common requirements
IEC 62271-3:2015 High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850
IEEE C37.242-2013 IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control
IEEE/IEC 1249-2013 IEC/IEEE Guide for Computer-based Control for Hydroelectric Power Plant Automation
IEEE 2030.100-2017 IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control System
I.S. EN 61850-5:2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS (IEC 61850-5:2013 (EQV))
I.S. EN 61850-10:2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV))
IEC 61850-10:2012 Communication networks and systems for power utility automation - Part 10: Conformance testing
IEC 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models
EN 62361-2 : 2013 POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END TO END QUALITY CODES FOR SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) (IEC 62361-2:2013)
EN 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models
EN 60044-8:2002 Instrument transformers - Part 8: Electronic current transformers

IEC 60255-21-2:1988 Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section Two: Shock and bump tests
IEC 60297-3-101:2004 Mechanical structures for electronic equipment - Dimensions of mechanical structures of the 482,6 mm (19 in) series - Part 3-101: Subracks and associated plug-in units
IEC 60255-21-3:1993 Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section 3: Seismic tests
IEC 61000-4-11:2004+AMD1:2017 CSV Electromagnetic compatibility (EMC) - Part 4-11: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests
IEC 61000-4-8:2009 Electromagnetic compatibility (EMC) - Part 4-8: Testing and measurement techniques - Power frequency magnetic field immunity test
IEC 60825-1:2014 Safety of laser products - Part 1: Equipment classification and requirements
IEC 61000-4-4:2012 RLV Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
IEC 61000-4-17:1999+AMD1:2001+AMD2:2008 CSV Electromagnetic compatibility (EMC) - Part 4-17: Testing and measurement techniques - Ripple on d.c. input power port immunity test
IEC 60127-1:2006+AMD1:2011+AMD2:2015 CSV Miniature fuses - Part 1: Definitions for miniature fuses andgeneral requirements for miniature fuse-links
IEC 61000-4-6:2013 Electromagnetic compatibility (EMC) - Part 4-6: Testing and measurement techniques - Immunity to conducted disturbances, induced by radio-frequency fields
CISPR 22:2008 Information technology equipment - Radio disturbance characteristics - Limits and methods of measurement
IEC 61180-2:1994 High-voltage test techniques for low-voltage equipment - Part 2: Test equipment
ISO 780:2015 Packaging Distribution packaging Graphical symbols for handling and storage of packages
IEC 60529:1989+AMD1:1999+AMD2:2013 CSV Degrees of protection provided by enclosures (IP Code)
ISO 9772:2012 Cellular plastics Determination of horizontal burning characteristics of small specimens subjected to a small flame
IEC TS 61000-6-5:2001 Electromagnetic compatibility (EMC) - Part 6-5: Generic standards - Immunity for power station and substation environments
IEC 60255-27:2013 Measuring relays and protection equipment - Part 27: Product safety requirements
IEC 60068-2-2:2007 Environmental testing - Part 2-2: Tests - Test B: Dry heat
IEC 61000-4-2:2008 Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test
IEC 60695-11-10:2013 Fire hazard testing - Part 11-10: Test flames - 50 W horizontal and vertical flame test methods
IEC 61000-4-3:2006+AMD1:2007+AMD2:2010 CSV Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity test
IEC 60255-21-1:1988 Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section One: Vibration tests (sinusoidal)
IEC 62271-1:2017 High-voltage switchgear and controlgear - Part 1: Common specifications for alternating current switchgear and controlgear
IEC 60721-3-3:1994+AMD1:1995+AMD2:1996 CSV Classification of environmental conditions - Part 3-3: Classification of groups of environmental parameters and their severities - Stationary use at weatherprotected locations
IEC 60068-2-1:2007 Environmental testing - Part 2-1: Tests - Test A: Cold
IEC 61180-1:1992 High-voltage test techniques for low voltage equipment - Part 1: Definitions, test and procedure requirements
ISO 7000:2014 Graphical symbols for use on equipment Registered symbols
IEC 61000-4-29:2000 Electromagnetic compatibility (EMC) - Part 4-29: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations on d.c. input power port immunity tests
IEC 60068-2-14:2009 Environmental testing - Part 2-14: Tests - Test N: Change of temperature
IEC 61010-1:2010+AMD1:2016 CSV Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 1: General requirements
IEC TS 61850-2:2003 Communication networks and systems in substations - Part 2: Glossary
IEC 60664-1:2007 Insulation coordination for equipment within low-voltage systems - Part 1: Principles, requirements and tests
CISPR 24:2010+AMD1:2015 CSV Information technology equipment - Immunity characteristics - Limitsand methods of measurement
IEC 61000-4-18:2006+AMD1:2010 CSV Electromagnetic compatibility (EMC) - Part 4-18: Testing and measurement techniques - Damped oscillatory wave immunity test
IEC 60990:2016 Methods of measurement of touch current and protective conductor current
IEC 60068-2-30:2005 Environmental testing - Part 2-30: Tests - Test Db: Damp heat, cyclic (12 h + 12 h cycle)

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.