IEC 61850-7-3:2010
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
02-06-2020
English - French
16-12-2010
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Conditions for attribute inclusion
6 Constructed attribute classes
7 Common data class specifications
8 Data attribute semantic
Annex A (normative) - Value range for units and
multiplier
Annex B (informative) - Functional constraints
Annex C (normative) - Tracking of configuration
revisions
Annex D (normative) - SCL enumerations
Bibliography
IEC 61850-7-3:2010 is applicable to the description of device models and functions of substations and feeder equipment. It specifies constructed attribute classes and common data classes related to substation applications. In particular, it specifies common data classes for status information, common data classes for measured information, common data classes for control, common data classes for status settings, common data classes for analogue settings and attribute types used in these common data classes. This second edition defines new common data classes used for new standards defining object models for other domains based on IEC 61850 and for the representation of statistical and historical data.
This publication is of core relevance for Smart Grid.
Committee |
TC 57
|
DevelopmentNote |
Stability Date: 2017. (09/2017)
|
DocumentType |
Standard
|
Pages |
407
|
PublisherName |
International Electrotechnical Committee
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
Standards | Relationship |
GOST R IEC 61850-7-3 : 2009 | Identical |
NBN EN 61850 7-3 : 2011 | Identical |
NEN EN IEC 61850-7-3 : 2011 | Identical |
I.S. EN 61850-7-3:2011 | Identical |
PN EN 61850-7-3 : 2011 | Identical |
EN 61850-7-3:2011/A1:2020 | Identical |
NEN-EN-IEC 61850-7-3:2011/A1:2020 | Identical |
CEI EN 61850-7-3 : 2012 | Identical |
NF EN 61850-7-3 : 2012 | Identical |
DIN EN 61850-7-3:2011-08 | Identical |
OVE/ONORM EN 61850-7-3 : 2011 | Identical |
I.S. EN 61850-7-3:2011/A1:2020 | Identical |
UNE-EN 61850-7-3:2011 | Identical |
BS EN 61850-7-3:2011 | Identical |
EN 61850-7-3:2011 | Identical |
BS EN 50289-1-12:2005 | Identical |
PNE-FprEN 61850-7-3 | Identical |
CEI EN 61400-25-1 : 2007 | WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
PD IEC/TS 61850-80-1:2016 | Communication networks and systems for power utility automation Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
16/30340907 DC : 0 | BS EN 61400-25-6 ED 2.0 - WIND TURBINES - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING |
05/30137809 DC : DRAFT AUG 2005 | IEC 61400-25-4 ED 1 - WIND TURBINES - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO XML BASED COMMUNICATION PROFILE |
PD IEC/TS 61850-80-4:2016 | Communication networks and systems for power utility automation Translation from the COSEM object model (IEC 62056) to the IEC 61850 data model |
12/30274900 DC : 0 | BS IEC 61869-9 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 9: DIGITAL INTERFACE FOR INSTRUMENT TRANSFORMERS |
PD IEC/TR 61850-80-3:2015 | Communication networks and systems for power utility automation Mapping to web protocols. Requirements and technical choices |
07/30168422 DC : 0 | BS EN 61850-8-1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
CEI EN 61850-7-420 : 2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES |
16/30344488 DC : 0 | BS EN 61850-7-2+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
PD IEC/TR 61850-7-500:2017 | Communication networks and systems for power utility automation Basic information and communication structure. Use of logical nodes for modeling application functions and related concepts and guidelines for substations |
CEI EN 61400-25-6 : 2011 | WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING |
CEI EN 61850-9-2 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 |
EN 61400-25-5:2017 | Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
BS EN 61850-7-420:2009 | Communication networks and systems for power utility automation Basic communication structure. Distributed energy resources logical nodes |
BS EN 61850-6:2010 | Communication networks and systems for power utility automation Configuration description language for communication in electrical substations related to IEDs |
CEI EN 61850-7-2 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
PREN 50491-12 : DRAFT 2014 | GENERAL REQUIREMENTS FOR HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) AND BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - PART 12: SMART GRID - APPLICATION SPECIFICATION - INTERFACE AND FRAMEWORK FOR CUSTOMER |
I.S. EN 61400-25-6:2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING |
CEI EN 61850-8-1 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
I.S. EN 61850-9-2:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 (IEC 61850-9-2:2011 (EQV)) |
CEI CLC/TS 61850-80-1 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED DATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104 |
IEC 61970-301:2016 | Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base |
IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEC TR 61850-1:2013 | Communication networks and systems for power utility automation - Part 1: Introduction and overview |
NF EN 61850-6 : 2004 | COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
IEC 61400-25-4:2016 RLV | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
EN 61400-25-4:2017 | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
EN 61850-10:2013 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEC 61400-25-3:2015 RLV | Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models |
EN 62271-3:2015 | High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
EN 61400-25-6:2017 | Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring |
IEC 61970-301:2016 RLV | Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base |
EN 61850-7-420:2009 | Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
EN 61850-6:2010 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
EN 61850-9-1:2003 | Communication networks and systems in substations - Part 9-1: Specific Communication Service Mapping (SCSM) - Sampled values over serial unidirectional multidrop point to point link |
03/110578 DC : DRAFT AUG 2003 | IEC 61400-25 ED.1.0 - WIND TURBINES - PART 25: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS |
IEEE 1547.3 : 2007 | MONITORING, INFORMATION EXCHANGE, AND CONTROL OF DISTRIBUTED RESOURCES INTERCONNECTED WITH ELECTRIC POWER SYSTEMS |
09/30145360 DC : 0 | BS EN 61850-9-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM)- SAMPLED VALUES OVER ISO/IEC 8802-3 |
05/30137801 DC : DRAFT AUG 2005 | IEC 61400-25-2 ED 1 - WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
02/206919 DC : DRAFT MAY 2002 | IEC 61850-8-1. ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO MMS (ISO/IEC 9506 PART 1 AND PART 2) OVER ISO 8802-3 |
I.S. EN 61400-25-2:2015 | WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
CEI EN 61850-5 : 2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS |
CEI EN 61850-10 : 2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING |
16/30344309 DC : 0 | BS ISO 17800 - FACILITY SMART GRID INFORMATION MODEL |
16/30346107 DC : 0 | BS EN 61400-25-1 ED.2 - WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
17/30358470 DC : 0 | BS EN 61850-8-2 ED1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP) |
I.S. EN 62271-3:2015 | HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
DD CLC/TS 61850-80-1:2010 | Communication networks and systems for power utility automation Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
BS EN 61400-25-2:2015 | Wind turbines Communications for monitoring and control of wind power plants - Information models |
09/30212527 DC : 0 | BS EN 61850-7-410 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
BS EN 61850-9-2:2011 | Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Sampled values over ISO/IEC 8802-3 |
12/30260040 DC : 0 | BS EN 62270 - GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION |
04/30092543 DC : DRAFT MAR 2004 | |
ASHRAE/NEMA 201 : 2016 ERRATA 2018 | FACILITY SMART GRID INFORMATION MODEL |
IEC TS 62351-2:2008 | Power systems management and associated information exchange - Data and communications security - Part 2: Glossary of terms |
IEC TR 61850-90-5:2012 | Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118 |
IEEE C37.119-2005 | IEEE Guide for Breaker Failure Protection of Power Circuit Breakers |
PREN 50491-12-1 : DRAFT 2017 | GENERAL REQUIREMENTS FOR HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) AND BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - SMART GRID - APPLICATION SPECIFICATION - INTERFACE AND FRAMEWORK FOR CUSTOMER - PART 12-1: INTERFACE BETWEEN THE CEM AND HOME/BUILDING RESOURCE MANAGER - GENERAL REQUIREMENTS AND ARCHITECTURE |
IEC TR 61850-90-7:2013 | Communication networks and systems for power utility automation - Part 90-7: Object models for power converters in distributed energy resources (DER) systems |
I.S. EN 62689-1:2016 | CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 1: GENERAL PRINCIPLES AND REQUIREMENTS |
IEC TS 61850-80-4:2016 | Communication networks and systems for power utility automation - Part 80-4: Translation from the COSEM object model (IEC 62056) to the IEC 61850 data model |
IEC 62689-1:2016 | Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 1: General principles and requirements |
BS EN 62271-3:2015 | High-voltage switchgear and controlgear Digital interfaces based on IEC 61850 |
PD IEC/TR 61850-7-510:2012 | Communication networks and systems for power utility automation Basic communication structure. Hydroelectric power plants. Modelling concepts and guidelines |
14/30284930 DC : 0 | BS EN 62689-2 ED 1.0 - CURRENT AND VOLTAGE SENSORS OR DETECTORS TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 2: GENERAL PRINCIPLES AND REQUIREMENTS |
BS EN 61850-7-4:2010 | Communication networks and systems for power utility automation Basic communication structure. Compatible logical node classes and data object classes |
DD IEC/TS 62351-7:2010 | Power systems management and associated information exchange. Data and communication security Network and system management (NSM) data object models |
BS EN 61400-25-4:2008 | Wind turbines Communications for monitoring and control of wind power plants. Mapping to communication profile |
PD IEC/TR 61850-1:2013 | Communication networks and systems for power utility automation Introduction and overview |
DD IEC TS 61850-80-1 : DRAFT JAN 2009 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED DATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104 |
12/30267268 DC : 0 | BS EN 61869-9 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 9: DIGITAL INTERFACE FOR INSTRUMENT TRANSFORMERS |
CLC/TS 61850-80-1:2010 | Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
03/304152 DC : DRAFT MAR 2003 | IEC 61850-10 ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 10: CONFORMANCE TESTING |
CEI EN 61400-25-4 : 2009 | WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
17/30362273 DC : DRAFT SEP 2017 | BS EN 50491-12-1 - GENERAL REQUIREMENTS FOR HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) AND BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - SMART GRID - APPLICATION SPECIFICATION - INTERFACE AND FRAMEWORK FOR CUSTOMER - PART 12-1: INTERFACE BETWEEN THE CEM AND HOME/BUILDING RESOURCE MANAGER - GENERAL REQUIREMENTS AND ARCHITECTURE |
PD IEC/TR 61850-90-4:2013 | Communication networks and systems for power utility automation Network engineering guidelines |
02/206918 DC : DRAFT MAY 2002 | IEC 61850-6. ED.1 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 6: SUBSTATION AUTOMATION SYSTEM CONFIGURATION DESCRIPTION LANGUAGE |
DD IEC/TS 61850-2:2003 | Communication networks and systems in substations Glossary |
07/30147754 DC : 0 | BS IEC 61850-6 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
12/30265386 DC : 0 | BS EN 62271-3 ED 2 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
I.S. EN 62361-2:2013 | POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END TO END QUALITY CODES FOR SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) |
11/30251804 DC : 0 | BS EN 61850-10 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING |
BS EN 61970-301:2017 | Energy management system application program interface (EMS-API) Common information model (CIM) base |
BS EN 61850-7-2:2010 | Communication networks and systems for power utility automation Basic information and communication structure. Abstract communication service interface (ACSI) |
16/30336107 DC : 0 | BS EN 61850-7-4 AMD1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
BS EN 61850-7-1:2011 | Communication networks and systems for power utility automation Basic communication structure. Principles and models |
BS EN 62689-2:2017 | Current and voltage sensors or detectors, to be used for fault passage indication purposes System aspects |
15/30326344 DC : 0 | BS EN 61850-8-2 ED 1.0 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP) |
CEI EN 61850-9-1 : 2015 | COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 9-1: SPECIFIC COMMUNICATION SYSTEM MAPPINGS (SCSM) - SAMPLED VALUES OVER SERIAL UNIDIRECTIONAL MULTIDROP POINT TO POINT LINK |
BS EN 61850-5:2013 | Communication networks and systems for power utility automation Communication requirements for functions and device models |
EN 62689-2:2017 | Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 2: System aspects |
IEC TR 61850-7-510:2012 | Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines |
ISO 17800:2017 | Facility smart grid information model |
CEI EN 61400-25-5 : 2007 | WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
I.S. EN 61850-6:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
I.S. EN 61850-7-4:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
I.S. EN 61850-7-420:2009 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES |
IEC 62689-2:2016 | Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 2: System aspects |
CEI EN 61850-7-4 : 2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
IEC 61869-9:2016 | Instrument transformers - Part 9: Digital interface for instrument transformers |
IEC 62270:2013 | Guide for computer-based control for hydroelectric power plant automation |
I.S. EN 61970-301:2017 | ENERGY MANAGEMENT SYSTEM APPLICATION PROGRAM INTERFACE (EMS-API) - PART 301: COMMON INFORMATION MODEL (CIM) BASE |
NF EN 61850-7-2 : 2003 | COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 7-2: BASIC COMMUNICATION STRUCTURE FOR SUBSTATION AND FEEDER EQUIPMENT - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
IEC 62361-2:2013 | Power systems management and associated information exchange - Interoperability in the long term - Part 2: End to end quality codes for supervisory control and data acquisition (SCADA) |
EN 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
EN 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
EN 61850-7-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011) |
PD IEC/TR 61850-90-7:2013 | Communication networks and systems for power utility automation Object models for power converters in distributed energy resources (DER) systems |
BS EN 62361-2:2013 | Power systems management and associated information exchange. Interoperability in the long term End to end quality codes for supervisory control and data acquisition (SCADA) |
BS EN 61850-9-1:2003 | Communication networks and systems in substations. Specific communication service mapping (SCSM) Sampled values over serial unidirectional multidrop point to point link |
17/30358185 DC : 0 | BS EN 61850-8-1+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
OVE/ONORM EN 61400-25-1 : 2007 | WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
EN 62689-1:2016 | Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 1: General principles and requirements |
PD IEC/TR 61850-90-2:2016 | Communication networks and systems for power utility automation Using IEC 61850 for communication between substations and control centres |
CEI EN 61850-7-1 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS |
05/30137797 DC : DRAFT AUG 2005 | IEC 61400-25-1 ED 1 - WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
08/30182501 DC : DRAFT MAY 2008 | BS EN 61850-7-1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS |
14/30301438 DC : 0 | BS EN 62746-3 ED 1.0 - SYSTEMS INTERFACE BETWEEN CUSTOMER ENERGY MANAGEMENT SYSTEM AND THE POWER MANAGEMENT SYSTEM - PART 3: ARCHITECTURE |
07/30166755 DC : 0 | BS EN 61850-7-4 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA CLASSES |
BS EN 62689-1:2016 | Current and voltage sensors or detectors, to be used for fault passage indication purposes General principles and requirements |
PD IEC/TR 61850-90-5:2012 | Communication networks and systems for power utility automation Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118 |
BS EN 61400-25-6:2017 | Wind energy generation systems Communications for monitoring and control of wind power plants. Logical node classes and data classes for condition monitoring |
BS EN 61850-10:2013 | Communication networks and systems for power utility automation Conformance testing |
DD IEC/TS 62351-2:2008 | Power systems management and associated information exchange. Data and communications security Glossary of terms |
IEC TR 61850-7-500:2017 | Communication networks and systems for power utility automation - Part 7-500: Basic information and communication structure - Use of logical nodes for modeling application functions and related concepts and guidelines for substations |
I.S. EN 61850-9-1:2003 | COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 9-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER SERIAL UNIDIRECTIONAL MULTIDROP POINT TO POINT LINK |
IEC TR 61850-90-10:2017 | Communication networks and systems for power utility automation - Part 90-10: Models for scheduling |
CEI EN 62361-2 : 2014 | POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END-TO-END QUALITY CODES FOR SCADA |
I.S. EN 62689-2:2017 | CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 2: SYSTEM ASPECTS |
BS EN 61850-7-410 : 2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
I.S. EN 61850-7-2:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
I.S. EN 61400-25-5:2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - COMPLIANCE TESTING |
NF EN 61400-25-4 : 2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
IEC TS 62351-7:2010 | Power systems management and associated information exchange - Data and communications security - Part 7: Network and system management (NSM) data object models |
I.S. EN 61400-25-3:2015 | WIND TURBINES - PART 25-3: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION EXCHANGE MODELS |
NF EN 61850-7-4 : 2003 | COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 7-4: BASIC COMMUNICATION STRUCTURE FOR SUBSTATION AND FEEDER EQUIPMENT - COMPATIBLE LOGICAL NODE CLASSES AND DATA CLASSES |
IEC TS 61850-80-1:2016 | Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
I.S. EN 61850-7-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011 (EQV)) |
I.S. EN 61850-8-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
IEC TR 62351-90-1:2018 | Power systems management and associated information exchange - Data and communications security - Part 90-1: Guidelines for handling role-based access control in power systems |
IEC TR 61850-80-3:2015 | Communication networks and systems for power utility automation - Part 80-3: Mapping to web protocols - Requirements and technical choices |
IEC 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
I.S. EN 61850-9-2:2011/A1:2020 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 (IEC 61850-9-2:2011/A1:2020)<br> |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
IEC 61400-25-4:2016 | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
IEC 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
IEC 61850-7-1:2011 | Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
IEC 62271-3:2015 | High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
IEC 61850-7-410:2012+AMD1:2015 CSV | Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control |
IEC 61850-9-1:2003 | Communication networks and systems in substations - Part 9-1: Specific Communication Service Mapping (SCSM) - Sampled values over serial unidirectional multidrop point to point link |
EN 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 61400-25-3:2015 | Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models |
IEC 61850-7-420:2009 | Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
EN 61850-7-2:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
EN 61400-25-3:2015 | Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models |
07/30166751 DC : 0 | BS EN 61850-7-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
06/30145429 DC : DRAFT MAY 2006 | |
S.R. CLC/TS 61850-80-1:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED ATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104 |
I.S. EN 61850-7-410:2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
12/30268049 DC : 0 | BS EN 62689-1 - CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 1: GENERAL PRINCIPLES AND REQUIREMENTS |
05/30137813 DC : DRAFT AUG 2005 | IEC 61400-25-5 ED 1 - WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
15/30325214 DC : 0 | BS EN 61400-25-4 ED 2.0 - WIND TURBINES - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
BS EN 61400-25-3:2015 | Wind turbines Communications for monitoring and control of wind power plants. Information exchange models |
PD IEC/TR 61850-90-10:2017 | Communication networks and systems for power utility automation Models for scheduling |
IEC TS 61850-2:2003 | Communication networks and systems in substations - Part 2: Glossary |
14/30300261 DC : 0 | BS EN 62689-1 ED 1.0 - CURRENT AND VOLTAGE SENSORS OR DETECTORS TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 1: SYSTEM ASPECTS |
BS EN 61850-8-1:2011 | Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEEE 1815.1-2015 | IEEE Standard for Exchanging Information Between Networks Implementing IEC 61850 and IEEE Std 1815(TM) [Distributed Network Protocol (DNP3)] |
I.S. EN 61400-25-4:2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
CEI EN 61850-6 : 2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
BS EN 61400-25-5:2017 | Wind energy generation systems Communications for monitoring and control of wind power plants. Compliance testing |
NF EN 61400-25-2 : 2016 | WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
IEEE/IEC 1249-2013 | IEC/IEEE Guide for Computer-based Control for Hydroelectric Power Plant Automation |
IEEE 2030.100-2017 | IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control System |
NF EN 61850-7-410 : 2013 AMD 1 2016 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
IEC TR 61850-90-2:2016 | Communication networks and systems for power utility automation - Part 90-2: Using IEC 61850 for communication between substations and control centres |
IEC 61400-25-5:2017 | Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
I.S. EN 61850-5:2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS (IEC 61850-5:2013 (EQV)) |
I.S. EN 61850-10:2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV)) |
EN 61850-7-410:2013/A1:2016 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL (IEC 61850-7-410:2012/A1:2015) |
IEC 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
EN 61970-301:2017 | Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base |
IEC 61850-10:2012 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEC 61400-25-6:2016 | Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring |
IEC 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
EN 62361-2 : 2013 | POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END TO END QUALITY CODES FOR SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) (IEC 62361-2:2013) |
EN 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
EN 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
IEEE C37.118-2005 | IEEE Standard for Synchrophasors for Power Systems |
IEC 61850-7-1:2011 | Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
ISO 4217:2015 | Codes for the representation of currencies |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC TS 61850-2:2003 | Communication networks and systems in substations - Part 2: Glossary |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.